Professional Documents
Culture Documents
Obra
Propiet.
Contrat.
Plz. Ejec.
Formula
: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO EN EL SECTOR CALAVERA CHICA DEL VALLE SAN RAFAEL - I ETAPA , DISTRITO CASMA, PROVINCIA CASMA - ANCASH"
: MUNICIPALIDAD PROVINCIAL DE CASMA
Ubicacin : SECTOR CALAVERA CHICA- VALLE SAN RAFAEL
Supervisor de Obra : Ing. JOHN F. ALVA SANTOS
: JVG CONTRATISTAS GENERALES S.A.C
Distrito
: CASMA
Residente de Obra : Ing. JOSE A. CORAL MONTES
: 60 DIAS CALENDARIOS
Provincia : CASMA
Monto de Contrato : S/ . 186,800.25
: CONSTRUCCION DE CANAL PRINCIPAL
Region
: ANCASH
Fecha Valorizacion : Del 01 al 28 Dic. del 2012
1/
VALORIZACIONES
PRESUPUESTO DE OBRA
ITEM
PARTIDA
Und Metrado
Costo
Unitario
Costo
Parcial
SALDO
ACTUAL ACUMULADO
% de
% de
% de
Metrado Monto S/.
Metrado Monto S/.
Metrado Monto S/.
Avance
Avance
Avance
M2
18.00
61.67
1,110.06
18.00
1,110.06 100.00
0.00
0.00
0.00
18.00
1,110.06
100.00
0.00
0.00
0.00
UND
1.00
800.00
800.00
1.00
800.00 100.00
0.00
0.00
0.00
1.00
800.00
100.00
0.00
0.00
0.00
GLB
1.00
2,000.00
2,000.00
1.00
2,000.00 100.00
0.00
0.00
0.00
1.00
2,000.00
100.00
0.00
0.00
0.00
M2
1,173.25
1.00
1,173.25
1,173.25
1,173.25 100.00
0.00
0.00
0.00
1,173.25
1,173.25
100.00
0.00
0.00
0.00
M2
600.00
1.59
954.00
600.00
954.00 100.00
0.00
0.00
0.00
600.00
954.00
100.00
0.00
0.00
0.00
UND
9.00
100.07
900.63
9.00
900.63 100.00
0.00
0.00
0.00
9.00
900.63
100.00
0.00
0.00
0.00
895.38 100.00
0.00
0.00
0.00
617.50
895.38
100.00
0.00
0.00
0.00
617.50
1.45
895.38
617.50
617.50
4.17
2,574.98
524.65
2,187.79
84.96
92.85
387.18
15.04
617.50
2,574.98
100.00
0.00
0.00
0.00
M3
133.80
40.04
5,357.35
48.25
1,931.93
36.06
85.55
3,425.42
63.94
133.80
5,357.35
100.00
0.00
0.00
0.00
M3
93.66
35.75
3,348.35
45.21
1,616.26
48.27
48.45
1,732.09
51.73
93.66
3,348.35
100.00
0.00
0.00
0.00
M3
345.90
57.51
19,892.71
51.24
2,946.81
14.81
294.66
16,945.90
85.19
345.90
19,892.71
100.00
0.00
0.00
0.00
M3
580.81
15.61
9,066.44
258.65
4,037.53
44.53
322.16
5,028.92
55.47
580.81
9,066.44
100.00
0.00
0.00
0.00
M2
1,617.85
2.02
3,268.06
250.00
505.00
15.45
1,367.85
2,763.06
84.55
1,617.85
3,268.06
100.00
0.00
0.00
0.00
M3
48.17
16.68
803.48
0.00
0.00
0.00
45.10
752.27
93.63
45.10
752.27
93.63
3.07
51.21
6.37
M2
420.00
2.00
840.00
0.00
0.00
0.00
380.00
760.00
90.48
380.00
760.00
90.48
40.00
80.00
9.52
M3
163.05
344.36
56,147.90
20.00
6,887.20
12.27
125.25
43,131.09
76.82
145.25
50,018.29
89.08
17.80
6,129.61
10.92
M2
178.15
47.71
8,499.54
18.00
858.78
10.10
142.20
6,784.36
79.82
160.20
7,643.14
89.92
17.95
856.39
10.08
M3
2.09
239.01
499.53
0.00
0.00
0.00
0.56
133.85
26.79
0.56
133.85
26.79
1.53
365.69
73.21
M2
15.05
47.26
711.26
0.00
0.00
0.00
5.05
238.66
33.55
5.05
238.66
33.55
10.00
472.60
66.45
M2
9.55
24.83
237.13
0.00
0.00
0.00
3.25
80.70
34.03
3.25
80.70
34.03
6.30
156.43
65.97
539.28
5.08
2,739.54
0.00
0.00
0.00
339.28
1,723.54
62.91
339.28
1,723.54
62.91
200.00
1,016.00
37.09
05.00.00 JUNTAS
05.01.00 JUNTA DE DILATACION 1"x3" @ 3.00 M.
: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO EN EL SECTOR CALAVERA CHICA DEL VALLE SAN RAFAEL - I ETAPA , DISTRITO CASMA, PROVINCIA CASMA - ANCASH"
: MUNICIPALIDAD PROVINCIAL DE CASMA
Ubicacin : SECTOR CALAVERA CHICA- VALLE SAN RAFAEL
Supervisor de Obra : Ing. JOHN F. ALVA SANTOS
: JVG CONTRATISTAS GENERALES S.A.C
Distrito
: CASMA
Residente de Obra : Ing. JOSE A. CORAL MONTES
: 60 DIAS CALENDARIOS
Provincia : CASMA
Monto de Contrato : S/ . 186,800.25
: CONSTRUCCION DE CANAL PRINCIPAL
Region
: ANCASH
Fecha Valorizacion : Del 01 al 28 Dic. del 2012
1/
VALORIZACIONES
PRESUPUESTO DE OBRA
ITEM
PARTIDA
Und Metrado
Costo
Unitario
Costo
Parcial
SALDO
ACTUAL ACUMULADO
% de
% de
% de
Metrado Monto S/.
Metrado Monto S/.
Metrado Monto S/.
Avance
Avance
Avance
06.00.00 COMPUERTAS
06.01.00 COMPUERTAS METALICAS DE 1/4"x0.50x0.60 M. H=1.20M. T/GUSANO -INC.
UNDINSTALACION
1.00
556.52
556.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
556.52 100.00
4.00
456.52
1,826.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
1,826.08 100.00
1.00
7,718.89
7,718.89
0.25
1,929.72
25.00
0.75
5,789.17
75.00
1.00
100.00
0.00
07.00.00 FLETES
07.01.00 FLETE RURAL
COSTO DIRECTO (CD)
GLB
7,718.89
0.00
131,921.08
30,734.33
89,676.21
120,410.54
11,510.54
GASTOS GENERALES 10 %
13,192.11
3,073.43
8,967.62
12,041.05
1,151.06
UTILIDAD 10 %
13,192.11
3,073.43
8,967.62
12,041.05
1,151.06
SUB TOTAL
158,305.30
36,881.20
107,611.44
144,492.64
13,812.66
158,305.30
36,881.20
107,611.44
144,492.64
13,812.66
28,494.95
6,638.62
19,370.06
26,008.68
186,800.25
43,519.82
IMPUESTO IGV 18 %
TOTAL PRESUPUESTO
23.30
126,981.50
67.98
170,501.32
0.00
2,486.27
91.27
16,298.93
8.73
: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO EN EL SECTOR CALAVERA CHICA DEL VALLE SAN RAFAEL - I ETAPA , DISTRITO CASMA, PROVINCIA CASMA - ANCASH"
: MUNICIPALIDAD PROVINCIAL DE CASMA
Ubicacin : SECTOR CALAVERA CHICA- VALLE SAN RAFAEL
Supervisor de Obra : Ing. JOHN F. ALVA SANTOS
: JVG CONTRATISTAS GENERALES S.A.C
Distrito
: CASMA
Residente de Obra : Ing. JOSE A. CORAL MONTES
: 60 DIAS CALENDARIOS
Monto de Contrato : S/ . 14,991.42
Provincia : CASMA
: CONSTRUCCION DE OBRAS DE ARTE
Region
: ANCASH
Fecha Valorizacion : Del 01 al 28 Dic. del 2012
1/
VALORIZACIONES
PRESUPUESTO DE OBRA
ITEM
PARTIDA
Und Metrado
Costo
Unitario
Costo
Parcial
SALDO
ACTUAL ACUMULADO
% de
% de
% de
Metrado Monto S/.
Metrado Monto S/.
Metrado Monto S/.
Avance
Avance
Avance
M2
9.34
1.00
9.34
9.34
9.34 100.00
0.00
0.00
0.00
9.34
9.34
100.00
0.00
0.00
0.00
M2
9.34
1.99
18.59
9.34
18.59 100.00
0.00
0.00
0.00
9.34
18.59
100.00
0.00
0.00
0.00
M3
9.24
40.04
369.97
9.24
369.97 100.00
0.00
0.00
0.00
9.24
369.97
100.00
0.00
0.00
0.00
M2
14.80
2.02
29.90
14.80
29.90 100.00
0.00
0.00
0.00
14.80
29.90
100.00
0.00
0.00
0.00
M3
3.20
33.75
108.00
0.00
0.00
0.00
3.20
108.00 100.00
3.20
108.00
100.00
0.00
0.00
0.00
M3
6.65
16.68
110.92
0.00
0.00
0.00
6.65
110.92 100.00
6.65
110.92
100.00
0.00
0.00
0.00
2.80
208.41
583.55
2.80
2.80
583.55
100.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
2.65
347.61
921.17
0.00
0.00
0.00
2.65
921.17 100.00
2.65
921.17
100.00
0.00
0.00
0.00
M2
19.84
54.27
1,076.72
0.00
0.00
0.00
19.84
1,076.72 100.00
19.84
1,076.72
100.00
0.00
0.00
0.00
KG
151.59
4.30
651.84
0.00
0.00
0.00
151.59
651.84 100.00
151.59
651.84
100.00
0.00
0.00
0.00
M3
1.12
359.07
402.16
0.00
0.00
0.00
1.12
402.16 100.00
1.12
402.16
100.00
0.00
0.00
0.00
M2
6.72
54.27
364.69
0.00
0.00
0.00
6.72
364.69 100.00
6.72
364.69
100.00
0.00
0.00
0.00
121.38
4.30
521.93
0.00
0.00
0.00
121.38
521.93 100.00
121.38
521.93
100.00
0.00
0.00
0.00
M2
1.40
13.93
19.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.40
M2
13.83
1.00
13.83
0.00
0.00
0.00
13.83
13.83 100.00
13.83
13.83
100.00
0.00
0.00
0.00
M2
13.83
2.91
40.25
0.00
0.00
0.00
13.83
40.25 100.00
13.83
40.25
100.00
0.00
0.00
0.00
M3
1.94
25.02
48.54
0.00
0.00
0.00
1.94
48.54 100.00
1.94
48.54
100.00
0.00
0.00
0.00
M2
9.72
6.67
64.83
0.00
0.00
0.00
9.72
64.83 100.00
9.72
64.83
100.00
0.00
0.00
0.00
01.05.00 PINTURA
01.05.01 PINTURA TRAFICO EN PARAPETO DE SEGURIDAD EN ALCANTARILLA
0.00
0.00
19.50 100.00
: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO EN EL SECTOR CALAVERA CHICA DEL VALLE SAN RAFAEL - I ETAPA , DISTRITO CASMA, PROVINCIA CASMA - ANCASH"
: MUNICIPALIDAD PROVINCIAL DE CASMA
Ubicacin : SECTOR CALAVERA CHICA- VALLE SAN RAFAEL
Supervisor de Obra : Ing. JOHN F. ALVA SANTOS
: JVG CONTRATISTAS GENERALES S.A.C
Distrito
: CASMA
Residente de Obra : Ing. JOSE A. CORAL MONTES
: 60 DIAS CALENDARIOS
Monto de Contrato : S/ . 14,991.42
Provincia : CASMA
: CONSTRUCCION DE OBRAS DE ARTE
Region
: ANCASH
Fecha Valorizacion : Del 01 al 28 Dic. del 2012
1/
VALORIZACIONES
PRESUPUESTO DE OBRA
ITEM
PARTIDA
Und Metrado
Costo
Unitario
Costo
Parcial
SALDO
ACTUAL ACUMULADO
% de
% de
% de
Metrado Monto S/.
Metrado Monto S/.
Metrado Monto S/.
Avance
Avance
Avance
M2
1.94
18.15
35.21
0.00
0.00
M3
2.14
16.68
35.70
0.00
0.00
0.00
1.20
326.92
392.30
0.00
0.00
0.00
0.00
0.00
M2
7.52
54.27
408.11
0.00
0.00
0.00
0.00
0.00
7.50
531.78
3,988.35
0.00
0.00
0.00
7.50
M3
0.57
303.60
173.05
0.00
0.00
0.00
0.00
0.00
M2
3.72
39.46
146.79
0.00
0.00
0.00
0.00
0.00
KG
12.30
4.22
51.91
0.00
0.00
0.00
10,587.15
0.00
1,011.34
0.00
8,384.13
0.00
1.94
35.21 100.00
1.94
35.21
100.00
0.00
0.00
0.00
2.14
35.70 100.00
2.14
35.70
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.20
392.30 100.00
0.00
0.00
0.00
0.00
7.52
408.11 100.00
7.50
3,988.35
100.00
0.00
0.00
0.00
0.00
0.00
0.57
173.05 100.00
0.00
0.00
0.00
0.00
3.72
146.79 100.00
0.00
0.00
0.00
9,395.47
0.00
12.30
51.91 100.00
1,191.68
3,988.35 100.00
0.00
0.00
1,058.72
101.13
838.41
939.55
119.18
UTILIDAD 10 %
SUB TOTAL
1,058.72
12,704.59
101.13
1,213.61
838.41
10,060.96
939.55
11,274.57
119.18
1,430.02
12,704.59
1,213.61
10,060.96
11,274.57
1,430.02
2,286.83
218.45
1,810.97
2,029.42
14,991.42
1,432.06
IMPUESTO IGV 18 %
TOTAL PRESUPUESTO
9.55
11,871.93
79.19
13,303.99
257.40
88.74
1,687.43 11.26
RESUMEN DE VALORIZACION
DE EJECUCION DE AVANCE DE OBRA N 02
Obra
Propietario
Contratista
Supervisor de Obra
Residente de Obra
Costo Total de la Obra
Monto de Contrato
Plazo de Ejecucion
Fecha de Valorizacion
Ubicacin
Distrito
Provincia
Region
DESCRIPCION
TOTAL
89,676.21
8,384.13
98,060.34
9,806.03
9,806.03
117,672.41
117,672.41
0.00
0.00
0.00
0.00
117,672.41
0.00
0.00
0.00
117,672.41
117,672.41
21,181.02
138,853.44
138,853.44
S/.
138,853.44
PORCENTAJE DE VALORIZACION
DE EJECUCION DE AVANCE DE OBRA N 02
Obra
Propietario
Contratista
Supervisor de Obra
Residente de Obra
Costo Total de la Obra
Monto de Contrato
Plazo de Ejecucion
Fecha de Valorizacion
Ubicacin
Distrito
Provincia
Region
DESCRIPCION
PRESUPUESTO
COSTOS DIRECTOS
Formula : CONST. DE CANAL PRINCIPAL
Formula : CONST. DE OBRAS DE ARTE
COSTO DIRECTO TOTAL
GASTOS GENERALES 10%
UTILIDAD 10%
SUB TOTAL
Impuesto I.G.V. 18 %
MONTO DE OBRA VALORIZADO
131,921.08
10,587.15
142,508.23
14,250.82
14,250.82
171,009.87
30,781.78
201,791.65
138,853.45
201,791.65
VALORIZADO
89,676.21
8,384.13
98,060.34
9,806.03
9,806.03
117,672.41
21,181.02
138,853.45
AVANCE ACTUAL
TOTAL
89,676.21
8,384.13
98,060.34
9,806.03
9,806.03
117,672.41
21,181.02
138,853.45
67.98%
79.19%
100%
100 =
68.81
CUADRO DE METRADOS
CONTRATADOS vs. EJECUTADOS
Obra
Propietario
Contratista
Supervisor de Obra
Residente de Obra
Costo Total de la Obra
Monto de Contrato
Plazo de Ejecucion
Fecha de Valorizacion
Ubicacin
Distrito
Provincia
Region
Formula
ITEM
02.00.00
TRABAJOS PRELIMINARES
02.05.00
03.00.00
MOVIMIENTO DE TIERRAS
03.01.00
03.02.00
UND
METRADO
CONTRATADO
METRADO
EJECUTADO
617.50
617.50
M3
133.80
133.80
M3
93.66
93.66
03.03.00
M3
345.90
345.90
03.04.00
M3
580.81
580.81
03.05.00
M2
1,617.85
1,617.85
03.06.00
M3
48.17
45.10
03.07.00
M2
420.00
380.00
04.00.00
04.01.00
CANAL
04.01.01
M3
163.05
125.25
04.01.02
M2
178.15
142.20
04.02.00
TOMAS LATERALES
04.02.01
M3
2.09
0.56
04.02.02
M2
15.05
5.05
04.02.03
M2
9.55
3.25
05.00.00
JUNTAS
M
539.28
339.28
05.01.00
06.00.00
COMPUERTAS
06.01.00
1.00
0.00
06.02.00
UND
4.00
0.00
07.00.00
FLETES
07.01.00
FLETE RURAL
GLB
1.00
1.00
CUADRO DE METRADOS
CONTRATADOS vs. EJECUTADOS
Obra
Propietario
Contratista
Supervisor de Obra
Residente de Obra
Costo Total de la Obra
Monto de Contrato
Plazo de Ejecucion
Fecha de Valorizacion
Ubicacin
Distrito
Provincia
Region
Formula
ITEM
UND
METRADO
CONTRATADO
METRADO
EJECUTADO
TRABAJOS PRELIMINARES
01.01.01
M2
9.34
9.34
01.01.02
M2
9.34
9.34
01.02.00
MOVIMIENTO DE TIERRAS
01.02.01
M3
9.24
9.24
02.02.02
M2
14.80
14.80
02.02.03
M3
3.20
3.20
02.02.04
M3
6.65
6.65
01.03.00
2.80
2.8
03.01.00
01.04.00
01.04.01
CAJA DE ALCANTARILLA
M3
2.65
2.65
M2
19.84
19.84
KG
151.59
151.59
M3
1.12
1.12
M2
6.72
6.72
KG
121.38
121.38
M2
1.40
0.00
01.04.02
LOSAS MACIZAS
01.05.00
PINTURA
01.05.01
TRABAJOS PRELIMINARES
02.01.01
M2
13.83
13.83
02.01.02
M2
13.83
13.83
02.02.00
MOVIMIENTO DE TIERRAS
02.02.01
M3
1.94
1.94
02.02.02
M2
9.72
9.72
02.02.03
M2
1.94
1.94
02.02.04
M3
2.14
2.14
02.03.00
02.03.01
M3
1.20
0.00
CUADRO DE METRADOS
CONTRATADOS vs. EJECUTADOS
Obra
Propietario
Contratista
Supervisor de Obra
Residente de Obra
Costo Total de la Obra
Monto de Contrato
Plazo de Ejecucion
Fecha de Valorizacion
Ubicacin
Distrito
Provincia
Region
Formula
ITEM
02.03.02
02.04.00
ESTRUCTURAS METALICAS
02.04.01
UND
METRADO
CONTRATADO
METRADO
EJECUTADO
M2
7.52
0.00
7.50
7.50
M3
0.57
0.00
03.02.00
M2
3.72
0.00
03.03.00
KG
12.30
0.00