To diversify my experience and knowledge in a challenging position. To come up as a skilled &dedicated team leader whose energy and motivation serve as an example to others. Professional Experience Plan, organize and lead on all electrical job assignments and control each subordinates in order to achieve high performance and orderly workmanship. Inspect, testing, calibrates, troubleshoot, repair and overhaul of all pneumatic and electrical field instruments as well as electrical controls.pre commissioning and commissioning of all field instruments and electrical instruments. Well versed at the interpretation of piping and instrument diagrams, flow diagrams, wiring diagrams, panel drawings, loop sheets and wire lists with following HSE standards and safety. Qualifications University Year 2002 2006
Bachelor of Technology in Electrical and Electronics Engineering(BTech EEE) Master of Engineering in Instrumentation and Control Engineering (MTech C&I)
2007 2009
Training: Primavera P6 Project management, AutoCAD 2D Training from CADD Centre Calicut, Kerala, India Low voltage switch gear Training from L&T, Coonore, Tamil Nadu PLC, SCADA Training from Prolific Automation Ltd, Cochin, Kerala Control panel designing, VFD training from ipcs automation Calicut,
Electrical Project Engineer Haji Bava Construction Ltd from August 2012 to onwards Electrical project engineer for Associated Cement CO Ltd. My responsibility include the following As a team member I have to co ordinate with work force of 15 operating staff members which includes operation engineers, field operator, maintenance engineer, technician &fire safety officer Execution of MV cables of various types and sizes providing GI earth station and also maintenance free earth station Involved in the Erection,Testing and commissioning of Electrical equipment Include the following equipment a) Power transformers &Auxiliary power transformers b) 132kv-Switchyard equipments like CT, PT, SF6Breaker, LA etc. c) HT/LT switchgears d) HT/LT motors e) 110 v DC system, include battery &charger Execution of all electrical drawings, single line diagrams, cable routings diagram, earthing routing. Manage and update Electrical project
2010 March to 2012 September -Electrical Engineer in Project Engineering Department Cape RB Hilton Ltd (Cape RBH)Royal commission area, 3091, AL Jubail, Saudi Arabia Example of major handled projects Electrical project and quality engineer for Plat former heater replacement project for Al Suwaidi ltd (client Saudi Aramco Riyadh refinery) from 2011 January to June 2012
Prepared electrical power system sizing calculations (load analysis, cable sizing, UPS sizing, DC system sizing).
Installations of all electrical panels and distribution boards for LV. Involved in maintenance of 132/22&132/6.6kv substation, protective relays and associated equipments. Installations of Transformers 2000 KVA 11/.415 KV,6.6/.415 KV& 37.5 MVA 11/22KV
Laying of all electrical cables both armored and unarmored for LV and MV (STA, SWA, XLPE, PVC) underground cabling, bus duct and raising mains as per approved shop drawings.
Prepared BOQ and ordering of material as per time schedule and procurement of materials . Erection and commissioning of 11 KV HT power distribution board, (AREVA MAKE) MCC and PCC. Erection and Commission of Distribution Transformer Dry type on construction site up to 1000 KVA. Handle the erection work of structures and instruments CT, CVT, PT, ISOLATOR, BREAKER, and LIGHTING MAST etc. Installation Transformers, Switchgears, Control Panels, MCC, ATs, starter, VFD, synchronization panels..
Installation of temporary construction power and lighting network in consultation with the operation group.
Electrical project engineer at Saudi Cement Houfouf plant for 11kv Substation(s/s-03) maintenance from 2010 March to 2010 December
Installation of Cable Trays inside Substations, Station Control Room (SCR). Laying of underground cables for HV & LV power distribution. Performing the day-to-day Preventive & Predictive maintenance jobs, new projects & Breakdown in plant & 66 KV Sub-station equipments like 12.5*2 MVA power transformer, 2000 KVA distribution transformer, 72.5 KV SF6 breakers and other switch yard equipment, 11 KV Vacuum Circuit breakers, Battery Charging System
Installation, Testing & Commissioning of Area Light. Installation of ELCB, MCCB, LA, CT, PT, PLATE, PIPE & EARTHING. 2006 July to 2007 July and 2009 July to 2010 march -Electrical Engineer in Plant Engineering Department Sijamc oils ltd (Synthite oils) Kakkanchery, Calicut, Kerala, India Installing and commissioning as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities; planning & effectuating maintenance schedules for equipment. Designing electrical layout, making drawing, approving them and carrying out inspection tests for determining the effectiveness of the plant/equipment. Maintenance of HT/LT power supply system includes breakers of VCBs,ACBs,2000 KVA transformer,1000 KVA&250 KVA DG set and panel boards . Maintain complete record of power consumption and weekly maintenance of panel boards cleaning and earth checking.
SUMMARY International experience in designing, analyzing and evaluating assigned projects by using
engineering principles by adhering to the process standards, practises and procedures and product program requirements. Experience in handling the tasks of providing technical leadership to personnel supporting the assigned project .Experience in direct and coordinate manufacturing, construction, installation, maintenance, support, documentation, and testing activities to ensure compliance with specifications, codes, and customer requirements. Nationality Indian
Date of Birth
Home address
Puthiyedath House
Thenhippalam P.O
Malappuram(D.T),Kerala
Passport Number
G3787314
Telephone
+ 00914942401636,9544948274
Language Skills
DECLARATION: