Established baseline demand of the existing site utility and initial performance baseline for potential on-site renewable

energy and water technology.

C = install sub-panel where no equipment exists

154.32

AC

5.4

905.43

Energy Potential (kWh) indoor de-

144.11 142.3

AC

289.45 269.97

Energy Potential (kWh) indoor demand (kWh)

Energy Balance - Overall


8604
intern village

Water Balance - Overall


8512
Page Number Scale Date

mand (kWh)

B
1

Estimated Monthly Electrical Loads (kWh)

3491.16

OVERALL
3213.4

3226.19

Monthly Solar AC Power Potential (kWh)

intern village cistern possible new cisterns existing water lines potential collection

11
Buildings by Energy Balance Priority
5 12

Estimated Annual Indoor Demand (gal)

121,704

OVERALL
226,849

Estimated Annual Rainwater Harvesting Potential (gal)

1
x
C
A

Green Forms Clubhouse and Bathroom


411.18
AC Energy Potential (kWh) indoor demand (kWh)

12

Party Palace Classroom


4.94
AC Energy Potential (kWh) indoor demand (kWh)

Buildings by Annual Average Water Balance Priority


Club house & Bathroom 7,672
-

163.8 1561.15

11.76

289.45

2 1
12

currently collecting

Party Palace

9
Author

2
7

11
AC Energy Potential (kWh) indoor demand (kWh)

10

I23.74 436.1 436.1


11

269.97 269.97

11.22 398.72

6 7
10

AC Energy Potential (kWh) indoor demand (kWh)

proximity groups general direction of downhill

Solar Decathlon

Green Forms

10,800

9,994

11
7421

8604

Main

8604
Average Solar Radiation for Flat-Plate Collectors Facing South at Fixed Tilt in Austin, TX

8512

Artist Residence Corner House 94.87 386.7

AC Energy Potential (kWh) indoor de-

10

woodshop+woodshed Green Forms


42.25
AC Energy Potential (kWh) indoor demand (kWh)

5
AGBDH

42.65

8
26,928 water main

Classroom

411.18

34,861

10
7909

already PV ideal for solar PV possible but not ideal for solar PV

mand (kWh)

Lead Designer

Project Title

Job Title

6.5

338.01

AC

5.5

4.5 kWh/m2/day 3.5

0 La tude - 15 La tude La tude + 15 90

42.65 938.65

Energy Potential (kWh) indoor demand (kWh)

109.87

AC Energy Potential (kWh) indoor demand (kWh)

not suitable existing power lines

905.43

7,200

5,400

13,963

23,722

2.5

1.5 February April January March

May

June

July

August October December September November

code compliance work

A = bury new line x = bury grounding electrode 36 deep = install above-ground pull-box where buried junction box exists = install above-ground pull-box where no junction box exists B = move sub-panel to accessible location = sub-panel X = main panel C = install sub-panel where some equipment exists C = install sub-panel where no equipment exists

Code Compliance :

keys explained

Clubhouse + Bathroom Artists Residence


AC Energy Potential (kWh) indoor de-

directors house Solar D


167.7
AC Energy Potential (kWh) indoor demand (kWh)

Greenhouse 7,992

Directors House 20,184

163.8 24.6

127.87
938.65

13,069

44,667

mand (kWh)

8512 Main

Factory Party Palace and Bathroom


154.32
AC

Classroom
144.11 142.3
AC

Artist Studio

Woodshop & Woodshed 3,600

5.4

905.43

Energy Potential (kWh) indoor demand (kWh)

289.45 269.97

Energy Potential (kWh) indoor demand (kWh)

7,200

13,963

8,237

Energy Balance - Individual


WATER BALANCE :
BUILDINGS RANKED IN WATER DEMAND AND RAINWATER HARVESTING POTENTIAL intern village cistern possible new cisterns existing water lines potential collection Estimated Annual Indoor Demand (gal) 121,704 Estimated Annual Rainwater Harvesting Potential (gal)
Page Number Scale Date

Water Balance - Individual

OVERALL
226,849

11

Buildings by Annual Average Water Balance Priority


Club house & Bathroom 7,672
-

2 1
12

currently collecting

Party Palace

9 3 2 6 7
10

proximity groups general direction of downhill

Solar Decathlon

Green Forms

10,800

9,994

11
7421

5
AGBDH

8
26,928 water main

Classroom

34,861

10
7909

7,200

5,400

13,963

23,722

Greenhouse 7,992

Directors House 20,184

13,069

44,667

Artist Studio

Woodshop & Woodshed 3,600

7,200

13,963

8,237

Job Title

Corner House

Factory

Lead Designer

Project Title

Author

proposed swimming pool (34k gal)

28,800

12
34,312

Job Title

Solar DWoodshed Woodshop and

Factory corner house


122.27

Corner House

Factory

Lead Designer

Project Title

Author

AGBDB Directors House

Greenhouse

proposed swimming pool (34k gal)

28,800

12
34,312

Page Number

ENERGY BALANCE :

BUILDINGS RANKED IN MONTHLY ENERGY DEMAND, SIDY BY SIDE WITH THEIR ON-SITE SOLAR POWER POTENTIAL

Scale

Date

943 OVERALL 792.04

WATER BALANCE :

BUILDINGS RANKED IN WATER DEMAND AND RAINWATER HARVESTING POTENTIAL