FOLLOWING POINTS ARE TO BE CHECKED / NOTED BEFORE COMMISSIONING PRF LOADING IN MOVEABLE PRESSURE VESSEL TANKER Transporter Transporter

r representative Mobile Number Vehicle Number Name of driver Driver mobile number Previous cargo handled Sr. No. DOCUMENTS Point to be checked 1. Vehicle Insurance 2. Vehicle Registration card 3. Drivers license (Permitting for driving heavy vehicle 4. Valid License to transport petroleum 1. Fire extinguisher- DCP- type (a) fully charged (b) Company Service label available (c) Expiry date valid 2. First Aid safety kits (a) Medicines Expiry date valid 3. PPE (a) Helmet (b) Safety shoes (c) Safety jacket (d) Safety goggles and(e) Hand gloves 4. Four wheel chokes in good condition 1. UN Class 2 diamonds on 3 sides (Sides and Rear) with UN No. 2. Emergency Information Panels (EIPs) Rear and Side Mount 1. Is the tank shell in good condition 2. Is the tanker mounted securely 1. All Tires in good condition (without excessive wear of tread & Under inflation) / Spare tyres provided 2. Vehicle brakes in good performance condition 1. Head lights, indicator/hazard lights working condition 2. Warning lights (all-round) in working condition (1)Front and (2)Rear 3. Tank side lights, brake lights in working condition OTHER FITTINGS 1. Both side mirrors are available 2. Vehicle battery box is covered and tightly secured 3. Vehicle exhaust pipe is fitted with spark arrester Remark / Yes / No

EQUIPMENT IN CABIN

PLACARD MARKINGS

TANK TYRE & BRAKES LIGHTS

TECHNICAL POINTS TO BE CHECKED WITH TANKER

1. Design pressure of tank (should be minimum 25 BAR) 2. Working pressure (should be minimum 17 BAR) 3. Total filling capacity in liters 4. Maximum filling capacity = 85 % of total filling capacity 5. Roto gauge (% LG) is in working condition 6. Tanker is tested as per schedule or in case of repair after an accident 7. Minimum two pressure safety valves are must 8. Pressure gauge (range 0-25 BAR) & temperature gauge (0-60 Deg.C) are available and in working condition. 9. Test certificate of pressure safety valves & excess flow valves of liquid & vapour 10. Earthing jumper at each flange joints 11. No signs of leakage from fuel tank 12. No signs of leakage from tanker body or flange joints 13. All flanges are in good condition. 14. All flange joints and valve (with operating handle/spindle) condition is satisfactory 15. Minimum four wheel chocks (wooden wedges) are available 16. Before loading, Earthing connection at front and back side provided 17. Before loading, Roto gauge level should be zero and pressure should be 5-6 BAR.

If above conditions fulfilled, allow tanker for loading under close supervision.