You are on page 1of 18

LATERAL ANALYSIS

P vs yt and Mmax
P 2.5 7.5 12.5 17.5 20 22.5 25 0.63 2.7 5.68 9.62 12 14.8 17.8 yt Mmax 20.92 73.42 140 217.5 260.83 306.67 355.83

VERTICAL ANALYSIS
L vs Qdw and Qup
L 5 11.11 17.22 23.33 29.44 35.56 41.67 47.78 53.89 60 Qdw 0.03 31.86 71.35 72.42 73.21 100 126.86 153.71 180.6 207.26 Qup 0.7 3.03 8.91 18.27 30.84 52.09 73.35 94.65 115.95 137.11

Update Lateral Data

Update Vertical Data

INSTRUCTIONS: 1. Run Lateral Analysis in Allpile , then click [To MS-Excel] button to begin the data transfer. 2. Check [Enable Macros] if you are asked while Excel is being opened. 3. After opening this Excel file, press [Update Lateral Data] button to upload the transferred data onto the spreadsheet. 4. Turn to [Lateral-y] sheet or [Lateral-M] sheet for graphical output.

INSTRUCTIONS: 1. Run Lateral Analysis in Allpile , then click [To MS-Excel] button to begin the data transfer. 2. Check [Enable Macros] if you are asked while Excel is being opened. 3. After opening this Excel file, press [Update Vertical Data] button to upload the transferred data onto the spreadsheet. 4. Turn to [Vertical-Qd], [Vertical-Qu], or [Vertical-2Q] sheet for graphical ou

Notes: 1. You can save the file under different file name. But do NOT delete this file: allpile.xls 2. You can customize the format of the graphs if you are familiar with Excel. Make sure each graph is linked to appropriate source on the [Data] sheet. 3. Do not change the contents on the [Data] sheet. 4 If you want to run a new analysis in Allpile again, you MUST close the Excel program first. Only one Excel program can be opened at any time. Units:

0 <-- If you want English units, input 0 in the left yellow cell. If you want Metric units, input 1 in the left yellow cell. If the value in the yellow cell above is 0, all data are in English units. If the value in the yellow cell above is 1, all data are in Metric (SI) units.

Do not delete data below: 0 * Do NOT change the content in the yellow cells left* If the value in the yellow cell above is 0, all data are in English units. If the value in the yellow cell above is 1, all data are in Metric (SI) units.

[To MS-Excel] button to begin

while Excel is being opened. e Vertical Data] button to

ertical-2Q] sheet for graphical output.

Lateral Load vs Top Deflection


30

25

Lateral Load, P (kip)

20

15

10

0 0 2 4 6 8 10 12 14 16 18 20 Top Deflection, yt (in)

Graphical Result of AllPile Analysis


Date: Sheet No.

Do not delete data below: Top Deflection, yt (in) Lateral Load, P (kip) * Do NOT change the content in the yellow cells above*

Printing Notes:
If you click on the chart area, you will print the chart only. If you click on any cell outside the chart, you will print the entire sheet with chart. Please go to Print Preview before you print to make sure you have the right selection.

Lateral Load vs Max Moment


30

25

Lateral Load, P (kip)

20

15

10

0 0 50 100 150 200 250 300 350 400

Max Moment in Single Pile, Mmax (kip-ft)

Project Name
Graphical Result of AllPile Analysis

CivilTech Software

Sheet No.

Do not delete data below: Max Moment in Single Pile, Mmax (kip-ft) Lateral Load, P (kip)

* Do NOT change the content in the yellow cells above*

Printing Notes:
If you click on the chart area, you will print the chart only. If you click on any cell outside the chart, you will print the entire sheet with chart. Please go to Print Preview before you print to make sure you have the right selection.

Compression Capacity vs Pile Length


250

200

Compression Capacity, Qdown (kip)

150

100

50

0 0 10 20 30 40 50 60 70

Pile Length, L (ft)

Graphical Result of AllPile Analysis

CivilTech Software

Sheet No.

Do not delete data below: Pile Length, L (ft) Compression Capacity, Qdown (kip) * Do NOT change the content in the yellow cells above*

Printing Notes:
If you click on the chart area, you will print the chart only. If you click on any cell outside the chart, you will print the entire sheet with chart. Please go to Print Preview before you print to make sure you have the right selection.

Uplift Capacity vs Pile Length


160

140

120

Uplift Capacity, Qup (kN)

100

80

60

40

20

0 0 10 20 30 40 50 60 70

Pile Length, L (ft)

Graphical Result of AllPile Analysis

CivilTech Softwarwe

Sheet No.

Do not delete data below: Pile Length, L (ft) Uplift Capacity, Qup (kN) * Do NOT change the content in the yellow cells above*

Printing Notes:
If you click on the chart area, you will print the chart only. If you click on any cell outside the chart, you will print the entire sheet with chart. Please go to Print Preview before you print to make sure you have the right selection.

Vertical Capacity vs Pile Length


250
Compression Uplift

200 181

207

Pile Capacity, Q (kip)

150 127

154 137 116

100 72 73

100 73 52 32 18 9 20 30 40 31

95

71 50

0 0

1 0
10

50

60

70

Pile Length, L (ft)

CivilTech Softwarwe
400 108th Ave NE, Bellevue, WA 98004

Project Title Project Location

Date: Sheet No.

You might also like