You are on page 1of 4

Check list for all MC- ( C )

Recommendable parts to be inspected/checked/overhauled during the 5 year dry-docking.

Manoeuvring System.
Object 1. Main starting air valve including the non-return valve to be dismantled cleaned and inspected. Seals to be renewed. 2. All pneumatic valves for the 7 bar control air system to dismantled, cleaned and overhauled with new repair kit. 3. Starting air distributor to be dismantled, cleaned and worn parts replaced. 4. Function test of VIT air cylinders and reversing air cylinders. Condition Comments/Action

Gas and Air ways.


Object 1. Visual inspection of exhaust manifold and pipes for leaks and condition of insulation. 2. Visual inspection of grid between exhaust manifold and turbocharger 3. Visual inspection of scavenge air cooler and water mist catcher (SL 07/484/TJJ) 4. Inspection of non-return valves in the scavenge air receiver . Condition Comments/Action

Fuel system.
Object 1. Dismantling of fuel pumps complete for cleaning inspection and renewal of seals. Replacement of plunger and barrel based on performance observations on visual inspection of the cutting edge of the plunger. 2. Fuel pump roller guide to be dismantled, cleaned, worn parts renewed Roller guide link and body to be checked for cracks by means of magnetically particle test. SL 345 and SL 391. . Condition Comments/Action

Hydraulic actuator for exh. valve.


Object 1. Dismantling of actuator and roller guide for cleaning and inspection, worn parts to be replaced . Condition Comments/Action

Camshaft arrangement.
Object 1 Camshaft coupling bolts to be checked and re-tightened (SL02 405/CBO) KOAS request one pass bolt to be demounted from the coupling nearest the chain wheel for inspection Visual inspection of running surface fuel and exh. cams Measure the fuel cam timing measure the exh. cam timing Measure the timing of the cylinder lubricators Condition Comments/Action

3 4 5

Governor.
Object 1 Push rod arrangement between governor and fuel pumps to be checked for wear Condition Comments/Action

Combustion chamber.
Object 1 Carry out scavenge port inspection Condition Comments/Action

Chain Drive.
Object 1 2 3 4 Visual inspection of chain wheels Visual inspection of rubber guide bars Visual inspection of the chains Chain tension to be checked Condition Comments/Action

Crankcase housing and running gear.


Object 1 2 Visual inspection of the crankcase housing Supervise replacement of the rubber gasket between the crankcase housing and the lub oil sump tank if requested of the chief engineer Crankshaft deflection to be measured, floating condition. KOAS request our superintendent to verify Yards result of the measured crankshaft deflection before and after entering the dock Crankpin bearings and main bearings to checked with edge feeler Bearing clearances to be measured , main/crankpin/crosshead/thrust bearing and recorded on a separate page for presenting the class surveyor Nothing abnormal after running hours (SL05 460) only one maybe two crosshead bearings have to be opened for inspection Condition Comments/Action

Welding seems.
Object 1 2 Visual inspection of welding seems in thrust bearing compartment Visual inspection of welding seems for support plates for 2. order moment compensators Visual inspection of welding seems for the top bracing Condition Comments/Action

General
Object 1 On the request of the chief engineer spare parts main components stored onboard can be checked to verify if it is the latest design Condition Comments/Action

You might also like