Labour per day Per day taking output Mate Unit Excavation of soil for strructure Ordinary Soil

Mechanical Means Depth upto 3 m Depth 3 m to 6m Depth above 6 m Ordinary Rock Mechanical Means Depth upto 3 m Hard Rock (requiring blasting) Manual Means Hard Rock (Blasting prohibited) Mechanical Means PCC 1:3:6 in Foundation Brick Masonry in CC 1:3 in Foundation Cement Mortar (1:3) Stone Masonry Work in CC (1:3) in Foundation Square Rubble Coursed Rubble Masonry Random Rubble Masonry Plain / Reinforced Cement Concrete in Open Foundation PCC Grade M 15 PCC Grade M 20 RCC Grade M 20 Using Concrete Mixer

240 cum 210 cum 180 cum

0.32 0.32 0.4

180 cum 10 cum 10 cum 15 cum 5 1 0 5 5 cum cum cum cum

0.24 0.35 0.2 0.64 0.48 0.04 0 0.72 0.68 0.86 0.86

15 cum 15 cum

15 cum

0.86 0.84 0.86 0.84 0.86 0.84 0.86 0.84 0.86 0.84

With Batching Plan, Transit Mixer and Concrete Pump 120 cum PCC Grade M 25 Using Concrete Mixer 15 cum With Batching Plan, Transit Mixer and Concrete Pump 120 cum RCC Grade M 25 Using Concrete Mixer 15 cum With Batching Plan, Transit Mixer and Concrete Pump 120 cum PCC Grade M 30 Using Concrete Mixer 15 cum With Batching Plan, Transit Mixer and Concrete Pump 120 cum RCC Grade M 30 Using Concrete Mixer 15 cum With Batching Plan, Transit Mixer and Concrete Pump 120 cum

RCC Grade M 35 Using Concrete Mixer

15 cum

0.86 0.84 0.84 0.19

With Batching Plan, Transit Mixer and Concrete Pump 120 cum RCC Grade M 40 With Batching Plan, Transit Mixer and Concrete Pump 120 cum Bored cast - in - situ M 35 grade RCC pile excluding reinforcement Pile diameter 750 mm 15 m

Pile diameter 1000 mm Foundation

10 m

0.22

Pile diameter 1200 mm

9m

0.25

Driven cast - in - situ M 35 grade RCC pile excluding reinforcement Pile diameter 750 mm 40 m

0.25

Pile diameter 1000 mm

30 m

0.33

Pile diameter 1200 mm

20 m

0.35

Pile diameter 500 mm

60 m

0.25

Driven precast vertical M 35 grade RCC Piles excluding reinforcement Pile diameter 750 mm 50 m Pile diameter 1000 mm 300 mm X 300 mm Pile size 500 mm X 500 mm Pile size 750 mm X 750 mm Pile size Driven vertical steel piles complete H section steel column 400 X 250 mm (ISHB Series) H section steel column 450 X 250 mm (ISHB Series) 40 m 60 m 50 m 40 m

0.3 0.42 0.16 0.25 0.34

70 m 60 m

0.12 0.14

Cement Concrete for reinforced concrete in pile cap RCC Grade M 20 Using Concrete Mixer

15 cum

0.9 0.16 0.9 0.16 0.9 0.16 0.9 0.16 0.86 0.4 0.43

Using Batching Plant, Transit Mixer and Concrete Pump 15 cum RCC Grade M 25 Using Concrete Mixer 15 cum Using Batching Plant, Transit Mixer and Concrete Pump 15 cum RCC Grade M 30 Using Concrete Mixer 15 cum Using Batching Plant, Transit Mixer and Concrete Pump 15 cum RCC Grade M 35 Using Concrete Mixer 15 cum Using Batching Plant, Transit Mixer and Concrete Pump 15 cum Levelling Course for Pile Cap PCC M15 levelling course 100mm thk. Below the pile cap cum 15 Fitting and placing uncoated HYSD bar reinforcement in foundation1 MT Fitting and placing uncoated Mild steel reinforcement in foundation MT 1

Brick Masonry in 1:3 in substructure 1 cum 0.06 Pointing with CC (1:3) on brick work in substructure 10 sqm 0.041 Plastering with CC (1:3) on brickwork in substructure 10 sqm 0.046 Stone Masonry in CC (1:3) for substructure Random Rubble Masonry 1 cum 0.113 Coursed rubble masonry (first sort) 1 cum 0.132 Substructure Ashlar masonry (first sort) 1 cum 0.413 Fitting and placing HYSD bar reinforcement in substructure 1 MT 0.34 Providing weep holes in brick masonry / plain / reinforced concrete abutment, wing wall / return wall with 100 m 30 Nos 0.03 Backfilling behind abutment, wing wall and return wall Granular material 10 cum 0.28 Sandy material 10 cum 0.28 Providing and laying of Filter media with granular materials / stone crushed aggregates0.32 10 cum Furnishing and placing reinforced / prestressed cement concrete in superstructure RCC Grade M 20 Using Concrete Mixer 15 cum Using Batching plant, Transit Mixer and Concrete Pump 120 cum RCC Grade M 25 Using Concrete Mixer

0.86 0.84

15 cum

0.86

Using Batching plant, Transit Mixer and Concrete Pump 120 cum RCC Grade M 30 Using Concrete Mixer

0.84

15 cum

0.9 0.88

Using Batching plant, Transit Mixer and Concrete Pump 120 cum RCC/PSC Grade M 35 Using Concrete Mixer

15 cum

0.9 0.88

Using Batching plant, Transit Mixer and Concrete Pump 120 cum PSC Grade M 40 Using Concrete Mixer

15 cum

0.96 0.94

Using Batching plant, Transit Mixer and Concrete Pump 120 cum PSC Grade M 45 Using Batching plant, Transit Mixer and Concrete Pump 120 cum PSC Grade M 50 Using Batching plant, Transit Mixer and Concrete Pump 120 cum

0.94

0.94

Fitting and placing HYSD bar reinforcement in superstructure 1 MT 0.44 High tensile steel wires/strands including all accessories for stressing, operations and grouting For making and fixing cables 0.377 MT 0.16 For prestressing 0.377 MT 0.05 For Grouting 0.377 MT 0.05 Mastic Asphalt 72.46 sqm 0.49

Labour per day Mazdoor

Driller

Blaster

Mason

Machinery Blacksmith Mazdoor Skilled

8 8 10

Hydraulic excavator10 hour bucket 1.0 cum Hydraulic excavator10 hour bucket 1.0 cum Hydraulic excavator10 hour bucket 1.0 cum

6 8 5 15 8 0.9 0 10.35 10.39 20 20 0.5 0.25

Hydraulic excavator10 hour bucket 1.0 cum Air Compressor 250 cfm with 2 jack hammer for drilling 1 hour Air Compressor 250 cfm with 2 jack hammer for drilling 8 hour Concrete Mixer 0.4/0.28 cum 8 hour Vibrator

1 4

7.5 6 1.5 1.5 Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour

20 18 20 18 20 18 20 18 20 18

1.5 3 1.5 3 1.5 3 1.5 3 1.5 3

20 18 18 4.5

1.5 3 3 0.17

Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Concrete Pump 8 hour

5.2

0.2

6.02

0.25

Concrete Pump 8 hour Hydraulic piling rig with power unit and complete access 8 hour Light crane for lowering reinforcement cage 1 hour Bentonite Pump 8 hour Concrete Pump 8 hour Hydraulic piling rig with power unit and complete access 8 hour Light crane for lowering reinforcement cage 1 hour Bentonite Pump 8 hour Concrete Pump 8 hour Hydraulic piling rig with power unit and complete access 8 hour Light crane for lowering reinforcement cage 1 hour Bentonite Pump 8 hour

5.65

0.44

7.5

0.6

7.9

0.56

5.65

0.44

Concrete Pump 8 hour Piling rig including double acting pile driving hammer co 8 hour Light crane for lowering reinforcement cage 1 hour Concrete Pump 8 hour Piling rig including double acting pile driving hammer co 8 hour Light crane for lowering reinforcement cage 1 hour Concrete Pump 8 hour Piling rig including double acting pile driving hammer co 8 hour Light crane for lowering reinforcement cage 1 hour Concrete Pump 8 hour Piling rig including double acting pile driving hammer co 8 hour Light crane for lowering reinforcement cage 1 hour

7.3 9.7 3.81 5.88 7.88

0.55 0.8 0.135 0.3 0.56

Crane 40 T Capacity 8 hour Vibrating Pile driving 8 hour complete with power unit hammer Crane 50 T Capacity 8 hour Vibrating Pile driving 8 hour complete with power unit hammer Crane 10 T Capacity 8 hour Vibrating Pile driving 8 hour complete with power unit hammer Crane 20 T Capacity 8 hour Vibrating Pile driving 8 hour complete with power unit hammer Crane 20 T Capacity 8 hour Vibrating Pile driving 8 hour complete with power unit hammer

3 3.5

Crane 10 T Capacity 8 hour Vibrating Pile driving 8 hour complete with power unit hammer Crane 10 T Capacity 8 hour

Vibrating Pile driving 8 hour complete with power unit hammer

21 3.5 21 3.5 21 3.5 21 3.5 20 6 6.5 0.8 0.53 0.63 1.5 1.77 2.8 6.5 0.25 7 7 8

1.5 0.38 1.5 0.38 1.5 0.38 1.5 0.38 1.5 2 2.25 0.8 0.5 0.5 1.2 1.5 2.5 2 0.5

Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Concrete Mixer 0.4/0.28 cum 8 hour Vibrator

Plate Compactor Plate Compactor

3 hour 3 hour

20 18

1.5 3

Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Vibrator Concrete Mixer 0.4/0.28 cum 8 hour Vibrator

20

1.5

18

Concrete Pump Vibrator

8 hour

21 19

1.5 3

Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Vibrator Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Vibrator Concrete Mixer 0.4/0.28 cum 8 hour Vibrator Concrete Pump 8 hour Vibrator Concrete Pump Vibrator Concrete Pump Vibrator 3 1 0.25 8 hour

21 19

1.5 3

22 20

2 3.5

20

3.5

20 8 3 1 1 11

3.5

8 hour

s and grouting 0.25 0.25 Stressing Jack with 2.5 hours pump Grouting pump with agitator 1 hours 1.25 Mechanical broom @1250 sqm per four 0.06 hours Air compressor 250cfmhours 0.06

Prestressing operator / Fitter

Total Qty.

Unit Mazdoor with Pneumatic breaker

Mate

Mazdoor

BELGAUM-KARNATAKA/GOA BORDER HIGHWAY PROJECT Site Handing Over Good for Construction Drawing Mobilization Setting Out Road Works Site Clearance & Dismentling Clearing & Grubbing Road Land Dismentling Plain / Reinforcement Cement Concrete Stone / Brick Structure Pavement Bituminous Crust Hume Pipe / Guard Rail / Kerb stone KM / 5th KM / Hec / Boundry Stone Apron / Stone Pitching Sign Boards , Guard post Kutcha Structure AC Sheet Roofing Structural Steel Earth Work Excavation Embankment with Borrow earth Embankment with Excavated earth Granular Sub Base Wet Mix Macadam BASE AND SURFACE COURSE (BITUMINOUS / CONCRETE) Primer Coat Tack Coat Bituminous Macadam Dense Bituminous Macadam Bituminous Concrete with crumb rubber Slurry seal Fog seal CULVERTS, BRIDGES & PROTECTIVE WORKS Excavation

780 days 1 day 1 day 60 days 75 days 542 days 151 days 32 days 126 days 15 days 40 days 18 days 30 days 20 days 10 days 14 days 25 days 15 days 12 days 283 days 213 days 283 days 244 days 216 days 193 days 542 days 530 days 528 days 488 days 254 days 290 days 9 days 14 days 305 days 111 days

Required Labour per day Mazdoor working Skilled with HMP, mazdoor for Blacksmith mechanical checking broom, line & levels paver, roller,

46.00 4330.00 7501.00 15590.00 152.00 95.00 14.00 476.00 238.00 3.00 566666.67 3111047.62 433142.86 287523.81 259619.05 1007619.05 3518666.67 5047.62 148380.95 56571.43 3039.05 7091.43

Cum Cum Cum Lm Nos. Cum Nos. Sqm Sqm Sqm Cum Cum Cum Cum Cum Sqm Sqm Cum Cum Cum Sqm Sqm

0.12 2.60 4.17 25.98 0.99 0.12 0.02

0.77 81.19 125.02 519.67 5.70 3.04 1.00

2.02

0.77

0.71 4.40 0.36 2.37 2.87 0.08 0.28 0.08 2.52 0.96 0.01 0.01 3.91

17.74 109.93 8.88 59.16 71.74 1.99 7.01 1.60 47.93 18.27 0.13 0.14 35.20 0.50 14.98 5.71

50454.00 Cum

Total Qty.

Unit Mazdoor with Pneumatic breaker

Mate

Mazdoor

PCC M-15 RCC M-35 in foundations RCC M-20 in substructure RCC M-25 in substructure RCC M-25 in box structure RCC M-35 in substructure RCC M-40 in substructure Backfilling Filter Media behind structures RCC M-35 in superstructure RCC M-40 in T-girders PSC M-40 box girders RCC M-40 crash barrier RCC M-30 in approach slab RCC M-40 in crash barrier Brick masonary Filter Media below Pitching Stone Pitching Stone Boulder Apron Weep Holes Drainage spouts POT-PTFE Bearings complete Elastomeric Bearings

32 days 46 days 43 days 13 days 19 days 39 days 6 days 41 days 41 days 22 days 7 days 17 days 9 days 13 days 14 days 8 days 40 days 60 days 11 days 37 days 5 days 10 days 30 days

1528.00 Cum 4353.00 Cum 6373.00 Cum 1751.00 Cum 823.00 Cum 7390.00 Cum 110.00 Cum 38718.00 Cum 3796.00 Cum 3687.00 Cum 1085.00 Cum 1387.00 Cum 1394.00 Cum 779.00 Cum 117.00 Lm 330.00 3727.00 11516.00 2090.00 4403.00 206.00 101.00 3657143.00 Cum Cum Cum Cum Nos. Nos. Nos. Cucm

2.74 0.76 5.03 1.04 6.68 1.02 7.00 0.34 1.34 1.36 9.03 0.19 1.61 27.10 3.04 1.29 7.37 1.52 12.15 0.65 4.99 1.22 6.97 0.91 2.60 0.20 0.04 3.96 4.66 7.68 9.50 0.12 1.24

63.67 16.32 75.45 22.23 100.15 21.89 105.06 7.26 20.06 29.17 135.48 4.13 24.20 677.57 75.92 27.65 110.61 32.55 182.28 13.87 74.90 26.14 104.55 19.48 38.95 4.39 0.98 116.47 143.95 237.50 0.99 9.06

Required Labour per day Mazdoor working Skilled with HMP, mazdoor for Blacksmith mechanical checking broom, line & levels paver, roller, 25.15 33.38 35.02 6.69 45.16 8.07

36.87 60.76 24.97 34.85 12.98

0.82

Total Qty.

Unit Mazdoor with Pneumatic breaker

Mate

Mazdoor

Tar Paper Bearing Expansion Joint : Strip seal 40mm wide Expansion Joint : Premoulded Joint Filler BC 40 mm + Mastic 25 mm RCC Pipe 1200 mm diameter complete Granular Material for Pipe Bedding PCC M-15 grade complete in head/wing/curtain wall/pillars etc. Rehabilition Cleaning & removal of vegetation growth M-30 Grade RCC Railing Stone Pitching Repair of railing by mortar Drainage spouts

8 days 18 days 9 days 55 days 20 days 10 days 10 days 86 days 5 days 6 days 20 days 5 days 7 days

70.00 830.00 366.00 13723.00 4136.00 2222.00 488.00 162.00 33.00 4016.00 29.00 69.00

Sqm Lm Lm Sqm Lm Cum Cum Sqm Lm Sqm Lm Nos.

0.04 0.19 0.03 4.63 12.44

1.31 4.80 1.02 99.26 266.64

Required Labour per day Mazdoor working Skilled with HMP, mazdoor for Blacksmith mechanical checking broom, line & levels paver, roller,

1.46 8.03 0.02 0.30

7.13 150.60 0.24 2.17

0.01 0.20

Mason

Mason

4.78 2.72 3.71 3.65 1.21 4.86 0.69

4.61 5.43 2.31 4.36 3.25 0.73 41.25 67.18 1.98 0.41

Mason

16.54 44.44

70.28 0.05 0.10