A PROJECT PROPOSAL

SUBMITTED TO:

PROF.MELCHOR D.JALON
COLLEGE OF COMMUNICATION AND HUMANITIES WESTERN MINDANAO STATE UNIVERSITY

IN PARTIAL FULFILLMENT OF THE REQUIREMENTS IN ENGLISH 111


(TECHINICAL AND SCIENTIFIC WRITING)

SUBMITTED BY: MICHAEL EURICK L. GONZALES BS ELECTRICAL ENGINEERING 5A

MARCH 9, 2013

WESTERN MINDANAO STATE UNIVERSITY COLLEGE OF ENGINEERING AND TECHNOLOGY

March 9, 2013

Prof. Melchor D. Jalon Professor in English 111 WMSU, Zamboanga City

Sir: This is to respectfully submit the project proposal on a Proposed Two-Storey Residential Building to be constructed at San Jose Road, Zamboanga City with estimated cost of 437,444 pesos and a duration of 120 calendar days (April-August). We hope that you will find the needed information in the attached project proposal.

Yours Truly

, Michael Eurick L. Gonzales

I.

PROJECT PROFILE A. Project Title: Proposed Two-Storey Residential Building B. Proponent: 5th Year BS-Electrical Engineering C. Implementers: Jaycee Construction Inc. D. Standard Classification: Building Construction E. Project Site: San Jose Road, Zamboanga City F. Total Project Cost: 437,444 php G. Project Brief Executive Summary H. Project Brief Executive Summary:

Residential building is a dwelling place of a person or group of person that will provide them their needs, comfort and shelter in their daily life style. This two-storey building will be design for a residential used or will be used as a house. PROJECT PROPOSAL PROPER A. Rationale: This proposal is intended to make a two-storey building that is designed in order to maximize the partition of a floor plan with a lesser space area in a location site. It also gives comfort for a person in the manner of proper arrangement of room area and as well as to beautify the design of the building in the requirement of the location site. How to implement this proposal? To ensure the success of the proposal The Proposed Two-Residential Building we must take consideration some certain procedure. 1. A good site survey of what actual topography and actual size of the construction area. 2. Clearance and excavation on the construction site. 3. In the constructing building worker are requiring to wear safety gears to insure the less accident. 4. Installation electrical line and interior design. 5. Gave at least one month for drying of the cement before using the building.

Who will benefit from the proposal? This proposal is beneficial to residents who will use this building as house having a good quality.

How much does it cost to implement the proposal? Presumably, the amount that will consume is more or less 437,444 in pesos.

By means of assumption, we can assume that we will be need not less than 437,444 peso for the construction of two-storey residential building.

Who are involved in this proposal? Civil Engineer Geodetic Engineer Electrical Engineer

Objective 1. To build a two-storey building in a limited space area. 2. To build a two-storey building with a cheaper cost but high quality in terms of durability. Significance of the study The proposal is most significant to the residents who will be living in this building. They will have their own house and reliable to the location site. This study also helps some people to have job for the worker who will be dealing on this proposed project will have income. PROJECT COMPONET/STATERIES OF IMPLEMENTATION MAJOR ACTIVITIES 1.Site Survey 2 .Clearance and excavation STRATEGY OF IMPLEMENTATION Measuring the land area and the topography of the area Cleaning the whole area were we will build and an excavation for the foundation of the building and the purpose of leveling the area. Preparing the construction and building the proposed two storey building .this stage also will be implementing a safety first for the worker to avoid accident during work. Interior After the installation of the electrical connections testing must be done right away. And also preparing the building by painting and designing the interior building. Let the building on touched within one month to let it dry the cement before it will fully occupied.

3.Construction

4.Electrical Designing

Installation\testing\

5.Finishing

F. IMPLEMENTATION The following activities and schedule shall be considered Activities to be implemented 2013 Year April May June July Month 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 x x x x x x x x x x x x x x x x x x x x x x

Site Survey Clearing and Excavation Construction Electrical Installation\testing\interior Designing Finishing

Full Operation August

1 x G.ESTEMATED BUDGET QTY Unit 1 2 Description

2 x

3 x

4 x

Unit Cost 2,000 250 Sub Total 1,500 250 Sub Total 1,300 200 250 300 200 12 25 1,000 65 365

Total Cost 2,000 1,000 3,000 4,500 3,000 7,500 71,500 77,000 27,500 2,400 11,000 32,160 7,500 8,000 1,950 1825

Site Survey Geodetic Engineering (3day) Laborer(2days) Clearance and Excavation Civil engineering(3day) Laborer(3day) Construction Civil Engineering(55days) Laborer or Carpenters (55days) Mason(55days) Welder(8days) Forman (55 days) Hallow Blocks Welding rod Welding machine(8days) Assorted nails Door knob

1 4

1 7 1 1 1 2680 300 1 30 5

pcs pcs pcs kg pcs

96 204 18 1 85 34 17 22 25

sack pcs pcs pc pcs pcs cu.m. cu.m. cu.m

Port land cement 6mm(.6x.2) Jalousie Window Jalousie Frame Plastic door 12mm dia. Steel bar 10mm dia. Steel bar Fine Aggregate Coarse aggregate Gravel

400 125 200 3240 250 150 900 900 650 Sub Total 35 250 700 80 150 200 250 Sub Total 650 550 45 95 200 Grand Total

38,420 25,500 3,600 3240 21,250 5,085 15,300 19,800 16,159 389,189 350 3,500 700 80 450 200 14,250 19,530 3,250 6,600 90 285 8,000 18,225 437,444

Electrical Installation\testing\design 11 Lighting outlet 14 Duplex Convenience outlet 1 Panel board 2 Single pole wall switch 3 Duplex pole wall switch 1 Triple pole wall witch 57 m Electrical wire Paint 5 gallons 12 gallons 2 pcs 3 pcs 4 Sub Total Blue paint White paint Paint brush Paint roller Painter\Laborer(10days)

SUMMARY A B C D E ACTIVITIES Site Survey Clearance and Excavation Construction Electrical Installation\testing\designing Paint Grand Total COST 3,000 7,500 389189 19530 18225 437,444