TG GUINGONA III
Kulasihan 1.Construction of Multi- 1,000,000.00 CDF-30M-2T-04 A-04-03888 DPWH I- DEO MOA w/ Brgy. TURNED-OVER/
purpose Bldg. (Covered 05.08.07
Court)
Kaatuan Construction of Multi- 500,000.00 1.CDF-10M-1T-0 1.A-05-01415/ 1.DPWH Contractor Phase I Completed
Purpose Bldg. 4 03.09.05 *waiting for
(Brgy Office) additional fund for
continuation
2. Construction of
Multi-purpose bldg. 1,500,000 CDF-20M-1T-08 A-08-06303/ 08.27.08 DPWH I- DEO Pre-implementation
(Covered Court) activity
2
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE ISSUED AGENCY IMPLEMENTOR
Victory
Poblacion Construction of Multi- 1,000,000.00 CDF-30M-2T-04 A-04-03888 DPWH I- DEO Contractor TURNED-OVER
purpose Bldg.
(Covered Court) Phase I
Continuation of the
Construction of Multi- CDF-20M-3T-05
purpose Bldg. (Covered 600,000.00 ROCS-05-06927/12.1 DPWH I- DEO
Court)Phase II 4.05
Purchase of 1 computer
set for Lantapan DepEd-Division of DepEd-Division of Turned-over
National High School Bukidnon Bukidnon
3
Cawayan Construction of Multi- 500,000.00 CDF-20M-3T- A-05-06489/ 12.12.05 DPWH I-DEO Contractor Phase I Completed
purpose Bldg (Covered 05
Court)
A-08-06303/ 08.27.08
Continuation of Covered 1,000,000.00 CDF-20M-1T-08 DPWH I-DEO Pre-implementation
Court activity
Basac
MUNICIPALITY OF IMPASUGONG
Financial assistance
to LGU 400,000.00 CDF-20M-3T-05 LGU LGU Implemented
Capitan Bayong 1. Construction of 1. 400,000.00 1. DPWH-CO-04 1.A-04-04701 / 1.DPWH I- DEO 1. MOA w/ LGU Phase I Completed
Multi-purpose Bldg. (Minority) 12.15.04
(Covered Court) Phase
I
2. Continuation of the 2. 500,000.00 2. CDF-20M-3T-06 2. 2.DPWH I- DEO Phase II Completed
Construction of Multi- A-05-06489/12.12.05
purpose Bldg
(Covered Court) Phase
II
Impalutao Spring Dev’t. Project 700000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO Admin. Phase I Completed
12.14.04 * waiting for additional
fund for continuation
4
Kibenton Construction of Water 1. 500,000.00 1.CDF-30M-2T-04 1.A-04-03888 / 1.DPWH I- DEO 1. Admin. Project Completed
System 12.13.04
Cawayan Construction of 400000.00 CDF-10M-2T-05 A-05-03889/ DPWH I-DEO MOA w/ LGU Completed as per
School Building 08.25.05 amount programmed
Hagpa
NIA-5M-06 Implemented
Rehabilitation of La 1,000,000.00 (thru the initiative
Fortuna Communal of Cong.
irrigation System Guingona)
5
Poblacion Construction of 200,000.00 Villar-05 Budget A-05-02689/ DPWH I-DEO Turned-over
Pathway at Continuing 07.1.05
Impasugong Central Appropriations
Elemntary School
Bulonay
6
MUNICIPALITY OF CABANGLASAN
7
Iba 1. Completion of 300,000.00 CDF- Sen. A-05-02689/ DPWH I- DEO Contractor TURNED-OVER
Multi-purpose Bldg. Villar-04 07.01.05
(Brgy Office)
2.Rehabilitation of
Capinonan 400,000.00 NIA-5M-06 NIA Implemented
Communal Irrigation
System
8
Anlugan Construction of 300,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor TURNED-OVER
Add’l. Water System 12.13.04 04.04.06
Mandahican
9
Lambagan Building Capabilities 120,000.00 DSWD REG X LMI Completed
of % Women
Organizations to (125 women
Implement and microrentrepreneurs)
Sustain SEA-K
( Sinanglanan, San
Martin, Malaybalay,
Imbatug, Cabulohan,
Lambagan,
Cabanglasan)
Construction of
Multi-purose Bldg.
(Brgy Office) 500,000.00
CDF-1T-10M-07 A-07-07323/10.18.0 DPWH-I-DEO Turned Over/ 12.10.08
7
10
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
Imbatug Completion of Brgy 500,000.00 CDF- 3T-05 DPWH I- DEO Project Completed as
Office per amount program
Completion of Brgy
office 300,000.00
11
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
Mauswagon Construction of 200,000.00 CDF-20M-3T-05 ROCS-05-06855/ LGU LGU TURNED-OVER
Squash Sotrage Bldg 12.14.05 10.21.06
for Capinon,
Freedom,
Mauswagon Multi-
purpose Cooperative
Construction of CDF-20M-1T-08
Multi-purpose Bldg. 1,000,000.00 A-08-06303/ DPWH I- DEO Pre-implementation
08.27.08 activity
Dalacutan
Jasaan Construction of 500000.00 DA-5M-08 A-08-02485/ DPWH I- DEO MOA w/ LGU On the process of
Footbridge (thru the initiative 03.12.08 preparing the MOA
of Cong.
Guingona)
Mandaing Construction of 500000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO Admin. TURNED-OVER
Add’l. Water System 12.14.04 04.04.06
for Mandaing Proper
12
MUNICIPALITY OF SAN FERNANDO
Sacramento Valley Water System Dev’t. 500000.00 CDF-30M-2T-0 A-04-03888 DPWH I- DEO Admin. TURNED-OVER
Project 4 04.06.06
14
Sto. Domingo
Implemented
Promoting Farm based 700,000 DSWD-REG X LMI
enterprise through Goat (6 community
Production based organizations
(Namnam,
Magkalungay,Halapitan,
Malayanan, Cayaga
Kibongkog Construction of Water 150,000.00 CDF- Sen. A-04-04628 / DPWH I- DEO Admin TURNED-OVER
System Angara -04 12.15.04 04.06.06
San Jose
Magkalungay Promoting Farm 511,567.10 CDF-05 DSWD REG X LMI On-going
Enterprise through goat (6 community
production based operation)
(Namnam,
Magkalungay,cayaga
Halapitan, Malayanan,
15
Dao Construction of Health 500000.00 CDF-1T-10M-0 A-07-07323/ DPWH-I-DEO Project completed
Center 7 10.18.07
Nacabuklad Const. of Farm to Market 700000.00 DAR-07 DPWH-I-DEO Lease contract with Project Completed
Road LGU of San Fernando
Iglugsad
Candelaria
Palacpacan Electrification 1006200.00 DOE N/A FIBECO FIBECO Project Completed
16
CITY OF VALENCIA
17
LGU 1.Turn-over of Guns N/A PNP-CO Turned-over
4.Financial Assistance
to LGU( Valencia City
Fire Department) for
Purchase of Fire CDF-20M-3T-05
Extinguisher for 31
barangays of Valencia 700,000.00 LGU Valencia City Fire Turned-over
Department
18
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
LGU 5. Installation of Fire 300,000.00 CDF-20M-3T-05 LGU Valencia City Water Turned-over
Hydrants to selected District
areas (Purok
3,5,7,11,12 and
Hagkol) and Purchase
of Two-way radios
19
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
9. Livelihood project 291,000,000 CDF-1T-07 DTI BUK Turned-over/
for Market Vendors 08.01.08
Assoc. of Valencia
20
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
21
Poblacion 1.Well Drilling at New 2,000,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH-I-DEO MOA w/ Valencia Project Completed
Deep Well Site (near 12.14.04 Water District
Alemars Area) Project Completed
CDF-20M-3T-05
2.Completion of 500,000.00 A-05-06489/ 12.12.05 DPWH-I-DEO Contractor
Valencia City Central
Elementary School
Multi-purpose Bldg CDF-3T-05 Implemented
22
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
Sinayawan 1. Construction of 500,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor Phase I Completed
Multi-purpose Bldg. 12.13.04
(Covered Court) Phase
I CDF-20M-3T-05 Phase II
2. Construction of 500,000.00 A-05-06489/ 12.12.05 DPWH I- DEO Completed
Multi-purpose Bldg Completed
(Phase II) 38 women and
men rice farmers
3.Marketing Support to 150,000.00
organic rice producers
in Valencia 3 FARMERS
(MAKAKABUS) ORGANIZATIO
N Implemented
4.PRIME- promoting 344,000.00
Entrepreneurship and Sinayawan and
market enhancement AFARBAMMCO
program-capacity CDF-3T-05
Building for PO’s
Implemented
5.Sinayawan CES- 35,000.00 CDF-20M-1T-08
Perimeter Fence
A-08-06303/ 08.27.08 Pre-
3. Construction of 1,000,000.00 DPWH I- DEO implementation
Covered Court activity
(PhaseIII)
Bagontaas Construction of Bgy. 1700000.00 CDF-10M-2T A-05-03889/ 08.25.05 DPWH I-DEO Contractor Phase I Completed
Office
23
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
24
Guinoyuran 1. Construction of 850,000.00 CDF- 5M-2T-04 ROX-04-251 / DPWH I- DEO Contractor 1.TURNED-OVER
Concrete Flood Control 11.18.04 04.03.06
2.Phase II
2. Construction of DPWH-CO-04 Completed
Multi-purpose Building 500,000.00 (Minority) A-04-04701 / DPWH I- DEO Contractor *waiting for
(Covered Court) 12.15.04 additional fund for
completion
3. Construction of Solar
Drier at Sitio Lake Apo 3.TURNED-OVER
CDF-05 04.03.06
100,000.00 A-05-02689/ DPWH I- DEO Contractor
4. Livelihood program 07.01.05
for federation of Sitios -Implemented
& purok leaders of CDF-05
Guinoyuran 50,000.00 DSWD REG X LMI
5. Purchase of 1
computer set for
Guinoyuran ES Turned-over
Sen. Villar
50,000.00
25
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
Guinoyuran 6. Procurement of 100 pcs. CDF-05 Youth DSWD REG X Turned-over
monoblock chairs for project c/o
Guinoyuran NHS- Deewai
Annex
26
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
Batangan 1. Community 91,000.00 1.DSWD-CO-04 N/A 1.DSWD-Reg.X DSWD-Reg.X Project Completed
Electrification (Purok6)
27
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
Laligan 1. Construction of 500,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO Admin. TURNED-OVER
Water System 12.14.04 09.23.05
Kahaponan Day Care Facilities 15,000.00 DSWD-CO-04 N/A DSWD-Reg.X DSWD-Reg.X TURNED-OVER
(Charity DCC) 11.25.05
Construction of Multi- 1,000,000.00 CDF-1T-10M- A-07-07323/ 10.18.07 DPWH I-DEO -Project Completed-
purpose Bldg. 07 ready for turn-over
(Covered Court)
Signing of MOA
Livelihood project for 120,000.00 CDF-1T/2T-07 DTI-BUK
AFARBAMCO
Mailag Construction of Multi- 300,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor Phase I completed
purpose Bldg. 12.13.04 *waiting for
(Senior Citizen Bldg.) additional fund for
continuation
Mailag ES- Renovation CDF-3T-05
of Classrooms 50,000.00 Implemented
Continuation of Multi-
purpose Bldg. CDF-20M-1T-08
(Senior Citizen Bldg.) 500,000.00 A-08-06303/ 08.27.08 DPWH I- DEO Pre-implementation
activity
28
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
Catumbalon 1. Expansion of Brgy. 300,000.00 1.CDF-30M-2T-0 1. ROCS-04-04186 / 1.DPWH I- DEO 1. Admin. TURNED-OVER
Water System at P5 4 12.14.04 09.23.05
29
BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS
FUNDING AND DATE AGENCY IMPLEMENTOR
ISSUED
Dagat Kidavao Electrification of Purok 500000.00 CDF-1T-15M NEA FIBECO Waiting for the
Katipunan 07 (Soft) SARO
Maapag Construction of Multi- 500,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor Phase I Completed
purpose Bldg. 12.13.04 *waiting for
additional fund for
continuation
CDF-3T-05
Implemented
Maapag ES- Const. of 50,000.00
Stage
Colonia 1.Day Care Facilities 30,000.00 1. DSWD-CO-04 1. N/A 1.DSWD-Reg.X 1.DSWD-Reg.X TURNED-OVER
(Alpha DCC, Omega 11.25.06
DCC)
CDF-3T-05 Implemented
2. Colonia ES- School 50,000.00
Covered Court
Lilingayon Construction of School 450,000.00 CDF- Sen. A-04-04628 / DPWH I- DEO MOA w/ LGU Project Completed
Building 1 Classroom Angara-04 12.15.04 -ready for turn-
over
30
Nabag-o 1. Construction of 500,000.00 CDF-20M-3T-05 A-05-06489/ 12.12.05 1.DPWH I- DEO Contractor Phase I Completed
Multi-purpose Bldg
(Barangay Office) CDF-3T-05 Implemented
2. Nabag-o ES- Const. 30,000.00 DepEd-Valencia DepEd Valencia
of Cemented Pathway
& Flower Boxes
3. Construction of CDF-1T-10M-07 A-07-07323/10.18.07 Project completed
Multi-purpose Bldg 500,000.00 DPWH-I-DEO
(Barangay Office-Phase
II)
32
Vintar 1. Completion of 250,000.00 1.CDF- Sen. 1. A-05-02689/ 1.DPWH I-DEO Contractor TURNED-OVER
Multi-purpose Bldg. Villar-04 07.01.15
33
CITY OF MALAYBALAY
34
LGU 1.Construction of 500,000.00 CDF-10M-2T-05 A-05-03889/ DPWH-I-DEO Contractor Project Completed as
DepEd Training 08.25.05 per amount
Center programmed
5.Financial assistance
to LGU for 300,000.00 LGU Association of Turned-over
installation of fire Barangay Captains
extinguishers to all (ABC)of Malaybalay
barangays CDF-05 Turned-over
6.Financial assistance
for DPWH-1st 1,400,000.00 LGU LGU
District Engineering (1M goes to the Turned-over
Office vehicle, the
remaining 400k
goes to the Crisis
Intervention Program
& Livelihood
35
BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS
FUNDING NUMBER AND AGENCY IMPLEMENTOR
DATE ISSUED
LGU 7.Hinabol Handicraft 50,000.00 LMI Implemented
Production by
FEDWOMB
Malaybalay chapter
8. Financial
assistance to LGU 500,000.00 CDF-1T-15M-07 LGU Waiting for the
SARO
9. Financial CDF-2T-5M-07
assistance to LGU 750,000.00 LGU Implemented
36
BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS
FUNDING NUMBER AND AGENCY IMPLEMENTOR
DATE ISSUED
LGU 12. Construction of 1,000,000.00 CDF-20M-1T-08 A-08-06303/ DPWH I-DEO Pre-implementation
Training Center of 08.27.08 activity
DepEd Division,
Bukidnon
CDF-20M-1T-08
13. Construction of 3,500,000.00 A-08-06303/ DPWH I-DEO Pre-implementation
Alumni Center & 08.27.08 activity
Museum of BSU CDF-1T-20M-08
CDF-20M-3T-05
Social Microcredit 100,000.00 LGU-Malaybalay LGU-DSWD Implemented
and Savings
Mobilization
(Womens) Sen. Villar-06
LGU-Malaybalay Barangay Government Implemented
Spring Dev’t for Sitio 50,000.00
Binatunan
37
Linabo 1. Rehabilitation of 200,000.00 NIA-5M-06 NIA Implemented
Paiwaig Communal
Irrigation System
2. Construction of 2,000,000 CDF-1T-10M-07 A-07-07323/ Implemented
Water System DA-5M-08 10.18.07
3. Const. of Spillway 2,500,000 A-08-02485/03.12 DPWH I-DEO Signing of MOA
.08
38
Dalwangan Rehabilitation of 500,000.00 NIA-5M-07 NIA Implemented
New Ilocos
Communal Irrigation
System
39
Apo Macote Construction of Farm 1,000,000.00 DAR Funded E-05-07630/ DPWH I- DEO Lease contract with Phase I Completed
to Market Road Apo project 12.29.05 the LGU of San
Macote-Malayanan Fernando
Construction of Farm
to Market Road Apo 1,000,000.00 DA Funded DPWH I- DEO Lease contract with Project On-going
Macote-Malayanan project the LGU of San
Fernando
Social Microcredit
and Savings
Mobilization 100,000.00 CDF-20M-3T-05 DPWH I- DEO LGU-Malaybalay Implemented
(Womens)
Construction of
Water System CDF-20M-1T-08
850,000.00 A-08-06303/ DPWH I- DEO Pre-implementation
08.27.08 activity
40
BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS
FUNDING NUMBER AND AGENCY IMPLEMENTOR
DATE ISSUED
Bangcud Construction of 1,000,000.00 CDF-10M-2T A-05-03889/ DPWH I- DEO Contractor Phase I Completed
Bridge at Purok 7 08.25.05
Social credit and 300,000.00 Sen. Cayetano DSWD REG X LMI Implemented
micro-
entrepreneurship
(Bangcud, Aglayan,
Laguitas, Magsaysay)
Pre-implementation
Construction of
1,900,000.00 CDF-20M-1T-08 A-08-06303/ DPWH-I-DEO activity
Bridge at Purok 7 –
08.27.08
Phase II
41
San Martin 1. Construction of 1 450,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO Contractor Project Completed as
unit Classroom at 120,000.00 12.14.04 per program
San Martin Elem. (125 * waiting for
Sch. microentrepreneurs additional fund
279,000.00
2. Building Plus 50,000 DSWD- REG X LMI Completed
Capabilities of %
Women
Organizations to
Implement and
Sustain SEA-K
(Sinanglanan, San
Martin, Imbatug,
Cabulohan,
Lambagan)
42
Simaya Construction of 500,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor Project Completed as
Multi-Purpose Bldg. 12.13.04 per amount program
(Barangay Office) *waiting for
additional fund for
continuation
CDF-05 Implemented
Livelihood project DA-LGU of
for LASSCIA 1,000,000.00 DA Region X Malaybalay
Miglamin
Busdi Construction of 1,000,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor TURNED-OVER
Spillway (Busdi 12.13.04
River)
CDF-20M-3T-05 Check issued
Financial assistance 150,000
to LGU for the Tribal
Council ofSitio Bendum,
Busdi, Malaybalay,City
43
BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS
FUNDING NUMBER AND AGENCY IMPLEMENTOR
DATE ISSUED
Sto. Nino Construction of 1000000.00 CDF-20M-3T- A-05-06489/12.12 DPWH I- DEO By Admin Project Completed
Water System .05
Maligaya
Kibalabag Electrification 1890289.00 NEA-04 / LGU N/A BUSECO 1. BUSECO COMPLETED
Imbayao
Mapayag Construction of 300000.00 CDF-1T-10M-07 A-07-07323/ DPWH I- DEO Project Completed
Multi-purpose Bldg. 10.18.07
Capitan Angel
Caburacanan
Casisang Books for 5 DCC 50,000.00 1. DSWD-C0-04 1. N/A 1.DSWD 1.DSWD TURNED-OVER/
(P2,5,8,9,10) 01.23.06
44
BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS
FUNDING NUMBER AND AGENCY IMPLEMENTOR
DATE ISSUED
Barangay 11 Land problem of Legislative Office of Manila Their case has already
Brgy 10 & Brgy 11 in coordination with Mayor been settled at the
(BATMIRNA & Flores DENR Central Office
MIRNABE) for action
Barangay 3
Barangay 7 Construction of 500,000.00 CDF-20M-3T-05 A-05-06489/ DPWH I- DEO Phase I Completed
Multi-purpose Bldg 12.12.05
CDF-20M-1T-08
Continuation of 1,000,000.00 A-08-06303/ DPWH I- DEO Pre-implementation
Multi-purpose Bldg 08.27.28 activity
Can-ayan Repair of Water 10000.00 Implemented
System at Sitio Kiito
Barangay 2 Purchase of Gas 50000.00 Implemented
Range & Oven, meat
grinder & 50 pcs
monobloc
Barangay 4 Completion of 150000.00 CDF- A-05-02689/ DPWH I- DEO Contractor Project Completed
Elevated Sidewalk Sen.Villar-04 07.01.05
45
BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS
FUNDING NUMBER AND AGENCY IMPLEMENTOR
DATE ISSUED
Sinanglanan 1.Installation of 500,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I-DEO Admin TURNED-OVER
Water System for P7 12.14.04 01/13/06
and P8
46
BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS
FUNDING NUMBER AND AGENCY IMPLEMENTOR
DATE ISSUED
Barangay 10 Land problem of Legislative Office of Manila Their case has
Brgy 10 & Brgy 11 in coordination with Mayor already been
(BATMIRNA & Flores settled at the
MIRNABE) DENR Central
Office for action
Aglayan Purchase of 2 50,000.00 CDF-20M-3T-05 Turned-over
computer units for
Aglayan ES
Sen.
Financial assistance 500,000.00 Magasaysay-07 Turned-over
to Malaybalay
Livestock Market
Assoc.
47
BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS
FUNDING NUMBER AND AGENCY IMPLEMENTOR
DATE ISSUED
Manalog Electrification 2575902.00 N/A BUSECO BUSECO COMPLETED
Mapulo
Laguitas Construction of 1000000.00 CDF-20M-3T- A-05-06489/12.12 DPWH I- DEO By Admin Project
Water System .05 Completed
Patpat
Magsaysay Social Microcredit 300,000 DSWD REG X LMI Implemented
and Savings
Mobilization
(Womens) 80 women
(Bangcud, Aglayan, microentrepreneurs
Laguitas,
Magsaysay)
St. Peter
Cabangahan
Kalasungay Financial assistance 250,000.00 CDF-20M-3T-05 LGU Check issued to
to LGU for the the recipients
projects of Barangay
Kalasungay Tribal
48
SOFT PROJECTS
PROJECT BARANGAY AMOUNT SOURCE OF SARO NUMBER NCA NUMBER IMPLEMENTIN PROJECT STATUS
FUNDING AND DATE AND DATE G AGENCY IMPLEMENTOR
ISSUED ISSUED
SCHOLARSHIP 1.450,000.00 1.CDF-5M-2T-04 1. ROX-04237/ 1. 232159-4 Bukidnon State Bukidnon State Implemented
11.09.04 College College
Bukidnon State
4. 550,000.00 4.CDF-10M-1T-05 4.ROCS-05-01386/ 258738-4/09.24.0 College Bukidnon State Implemented
03.07.05 5 College
5.CDF-10M-1T-05 CMU
5. 300,000.00 5. ROCS-05-01387/ 5. 258559-0 CMU Implemented
6.CDF-10M-1T-05 03.07.05 08.15.05
TESDA-
6. 300,000.00 7. CDF-20M-3T-05 6. ROCS-05-01388/ 6. BUKIDNON TESDA-BUKIDNON Implemented
03.07.05 258740-6/09.24.0
CDF-20M-3T-05 5 Bukidnon State Bukidnon State
7. 740,000.00 7. College College Implemented
ROCS-05-06857/12 7. 321959-1/
CDF-20M-3T-05 .14.05 02.14.06 CMU CMU
8. 260,000.00 Implemented
8.321958-0/
ROCS-05-06857/12 02.14.06 TESDA- TESDA-BUKIDNON
9. 260,900 .14.05 BUKIDNON Implemented
321957-6/
ROCS-05-06857/12 02.14.06
.14.05
49
PROJECT BARANGAY AMOUNT SOURCE OF SARO NUMBER NCA NUMBER IMPLEMENTIN PROJECT STATUS
FUNDING AND DATE AND DATE G AGENCY IMPLEMENTOR
ISSUED ISSUED
SCHOLARSHIP 217,500.00 CDF-1T-07 ROCS-07-08752/ TESDA- TESDA-BUKIDNON Waiting for the NCA
11.09.07 BUKIDNON
CMU
400,000.00 CDF-1T-07 ROCS CMU Waiting for the NCA
BSU
1,182,500.00 CDF-1T-07 BSU Waiting for the NCA
50
CIDSS 1. 200,000.00 1.CDF-5M-2T-04 1. B-04-03513/ 1. 232146-5 1. DSWD- 1. DSWD- REGION 1.IMPLEMENTED
12.10.04 REGION –X –X
PROJECT BARANGAY AMOUNT SOURCE OF SARO NUMBER NCA NUMBER IMPLEMENTIN PROJECT STATUS
FUNDING AND DATE AND DATE G AGENCY IMPLEMENTOR
ISSUED ISSUED
51
CIDSS b.259281-1 b. DSWD- b. DSWD- b. IMPLEMENTED
5,382,500.00 CDF-1T-07 ROCS-07-08749/ DSWD-REG X DSWD-REG X For Implementation
11.09.07 DSWD-Central DSWD-Central
Office (500k) Office
* note
-Projects funded by other agencies were all the initiative of Cong. Guingona