You are on page 1of 78

ABSTARCT COST

VDB Willow Farm

Sl No .

ITEM DESCRIPTION

Amount

Remarks

A CIVIL AND ALLIED WORKS 1 2 3 4 5 6 7 8 9 MASONRY WORKS PLASTERING WORKS FLOORING AND CLADDING WORKS DOORS & WINDOWS PAINTING WORKS MISCELLANEOUS WORKS STRUCTURAL PODIUM INFRASTRUCTURE

SUB TOTAL

Professional Consultants

DESCRIPTION

1.00

MASONRY

Providing and constructing 200mm thick Solid concrete block work in walls, piers and architectural features at all levels using approved Solid blocks of minimum strength 50 kgs/sqcm in cement mortar 1:6 including curing, steel scaffolding, steel staging, leads and lifts. Cost to include drilling the column and fixing 200mm long, 50 x 4mm thk. 1.01 MS Flat, bent to shape with anchor bolts, at every fifth course. GI Expanded Metal mesh shall be placed and tied in position between masonry and MS Flat, bent to shape, with anchor bolts at every fifth course. The rate is inclusive of cost of fabrication of reinforcement steel with all leads and lifts and as directed by Architect/Engineer in charge.

Providing and constructing 150mm thick Solid concrete block work in walls, piers and architectural features at all levels using approved Solid blocks of minimum strength 50 kgs/sqcm in cement mortar 1:6 including curing, steel scaffolding, steel staging, leads and lifts. Cost to include drilling the column and fixing 200mm long, 50 x 4mm thk. 1.02 MS Flat, bent to shape with anchor bolts, at every fifth course. GI Expanded Metal mesh shall be placed and tied in position between masonry and MS Flat, bent to shape, with anchor bolts at every fifth course. The rate is inclusive of cost of fabrication of reinforcement steel with all leads and lifts and as directed by Architect/Engineer in charge.
Page 2 of 78

Professional Consultants

Providing and constructing 100mm thick Solid block work at all levels in walls, piers and architectural features using approved solid blocks of minimum strength 50 kgs/sqcm in cement mortar 1:4 including curing, steel scaffolding, steel staging, leads and lifts and a concrete band 75mm thick. with 2nos. Tor 8 longitudinal bars and Tor 8 at 200c/c transverse reinforcement. at every fifth course with M15 1.03 grade concrete mix including steel shuttering, steel staging, curing etc., complete, including drilling the column & fixing 200mm long 50 x 4mm thick MS flat bent to shape, with anchor bolts at every fifth course, with all leads and lifts and as directed by Architect/Engineer in charge. The rate is inclusive of reinforcement steel and cost of steel fabrication of reinforcement steel with all leads and lifts and as directed by Architect/Engineer in charge.

MASONRY WORKS Sub-total -1 : 2.00 PLASTERING WORKS Prepare the surface and plaster the ceiling, soffit of staircase etc., in cement mortar 1:4, 12 mm thick with smooth finish to line and level with lime rendering at all 2.01 levels including lead and lift of materials, hydrating the lime 24 hours before starting of work with necessary scaffolding , curing , etc., complete.

Page 3 of 78

Professional Consultants

Prepare the surface and plaster all internal RCC / Masonry surface, walls, etc., in cement mortar 1:5 , 15 mm thick , smooth finished to line and plumb with lime rendering at all levels rounding of corners wherever required complete with necessary scaffolding, curing etc, complete.including lead and lifts hydrating the lime for 24 hours before starting of work.at all levels rounding of corners wherever required 2.02 complete with necessary scaffolding, curing etc, complete..Cost to include supplying and Fixing Plaster Mesh/Corner Bead made out of galvanized iron of nominal thickness 0.35mm with a zinc coating of 120 gms / Sqm of Arpitha make at the concrete and masonry junctions,Column corners, wall corners, with Galvanised nails etc., wherever called for required size.

Prepare the surface and plaster all internal RCC / Masonry surface, walls to receive dadoo backing, in cement mortar 1:5 , 15 mm thick , rough finished to line and plumb at all levels rounding of corners wherever required complete with necessary scaffolding, curing etc, complete.including lead and lifts hydrating the lime for 24 hours before starting of work.at all levels rounding of corners wherever required 2.03 complete with necessary scaffolding, curing etc, complete.Cost to include supplying and Fixing Plaster Mesh/Corner Bead made out of galvanized iron of nominal thickness 0.35mm with a zinc coating of 120 gms / Sqm of Arpitha make at the concrete and masonry junctions,Column corners, wall corners, with Galvanised nails etc., wherever called for required size.

Page 4 of 78

Professional Consultants

Providing rough plastering 15mm thick in CM 1:6 on walls at all levels & lifts, including rough finishing to line and plumb, cost of scaffolding, curing, etc., complete, with all leads and lifts and as directed by Architect/Engineer in charge. ( In ducts , shafts) with water proofing compound (using approved waterproofing compound added as per 2.04 manufacturers instructions. Cost to include supplying and Fixing Plaster Mesh/Corner Bead made out of galvanized iron of nominal thickness 0.35mm with a zinc coating of 120 gms / Sqm of Arpitha make at the concrete and masonry junctions,Column corners, wall corners, with Galvanised nails etc., wherever called for required size.

Page 5 of 78

Professional Consultants

Providing waterproof plaster to external walls, columns, etc. in waterproof cement mortar 1:4 (using approved waterproofing compound added as per manufacturers instructions) for over all thickness 20mm but applied in two coats, first coat of 14mm thick, second coat of 6mm with water proof compound to be applied after application of first coat, finished to line and level to approved texture, including all leads, lifts, scaffolding and curing complete. 2.05 The rate is inclusive of forming of drip moulds & architectural grooves of size 25x10mm as per the detailed drawing and directions of the Architect/Engineer-incharge.Cost to include supplying and Fixing Plaster Mesh/Corner Bead made out of galvanized iron of nominal thickness 0.35mm with a zinc coating of 120 gms / Sqm of Arpitha make at the concrete and masonry junctions,Column corners, wall corners, with Galvanised nails etc., wherever called for required size.

PLASTERING WORKS Sub-total -2 : 3.00 FLOORING AND CLADDING WORKS 3.00 IPS FLOORING-TERRACE Providing and laying 50mm thick Indian patent stone monolithic flooring (at all levels) 50mm thick of 1 portion of cement, 2 parts of coarse sand and 4 parts of stone aggregate by volume grading of aggregate The floor shall be completed with 1:1 cement sand mortar 12mm thick and cement slurry 2.2kg/sqm including Glass divider strips 45/50x4mm thick set in the flooring including necessary levelling, setting, etc.,. Rate to include curing & protection etc complete., with all lead and lift and as directed Architect/Engineer in charge including necessary Floor a) For average thickness of 50~55 mm. b) For average thickness of 70~75 mm. FLOORING AND CLADDING WORKS Sub-total -3 :
Page 6 of 78

Professional Consultants

Page 7 of 78

Professional Consultants

Page 8 of 78

Professional Consultants

Page 9 of 78

Professional Consultants

Page 10 of 78

Professional Consultants

Page 11 of 78

Professional Consultants

Page 12 of 78

Professional Consultants

United Engineering TOTAL QTY TYPE C1 Type C 1 Rate /Unit QTY. Amount TOTAL QTY TYPE C2

1,874.00

930.00

1,742,820.00

1,874.00

25.00

765
Page 13 of 78

19,125.00

25.00

Professional Consultants

384.00 -

690

264,960.00 2,026,905.00 -

384.00 -

1,251.00

260.00

325,260.00

1,251.00

Page 14 of 78

Professional Consultants

2,930.00 -

270.00

791,100.00 -

2,930.00 -

472.00

260.00

122,720.00

472.00

Page 15 of 78

Professional Consultants

408.00

260.00

106,080.00

408.00

Page 16 of 78

Professional Consultants

2,126.00 -

335.00 -

712,210.00 2,057,370.00 -

2,126.00 -

375.00 RATE ONLY

350.00

131,250.00 131,250.00

375.00 RATE ONLY

Page 17 of 78

Professional Consultants

4,215,525.00

Page 18 of 78

Professional Consultants

Page 19 of 78

Professional Consultants

Page 20 of 78

Professional Consultants

Page 21 of 78

Professional Consultants

Page 22 of 78

Professional Consultants

Page 23 of 78

Professional Consultants

United Engineering Type C 2 Rate /Unit QTY. Amount

United Engineering Type C 3 TO C 8 TOTAL QTY TYPE C3 TO C8 Rate /Unit QTY.

930.00

1,742,820.00 -

11,244.00 -

930.00

765

19,125.00
Page 24 of 78

150.00

765

Professional Consultants

690

264,960.00 2,026,905.00 -

2,304.00 -

690

260.00

325,260.00

7,506.00

260.00

Page 25 of 78

Professional Consultants

270.00

791,100.00 -

17,580.00 -

270.00

260.00

122,720.00

2,832.00

260.00

Page 26 of 78

Professional Consultants

260.00

106,080.00

2,448.00

260.00

Page 27 of 78

Professional Consultants

335.00 -

712,210.00 2,057,370.00 -

12,756.00 -

335.00 -

350.00

131,250.00 131,250.00
Page 28 of 78

2,250.00 RATE ONLY

350.00

Professional Consultants

4,215,525.00

Page 29 of 78

Professional Consultants

Page 30 of 78

Professional Consultants

Page 31 of 78

Professional Consultants

Page 32 of 78

Professional Consultants

Page 33 of 78

Professional Consultants

Page 34 of 78

Professional Consultants

United Engineering Type C 3 TO C 8 Amount TOTAL QTY TYPE D1 & D2

United Engineering Type D1 & D2 Rate /Unit QTY. Amount

10,456,920.00 -

2,675.00 -

930.00

2,487,750.00 -

114,750.00

125.00
Page 35 of 78

765

95,625.00

Professional Consultants

1,589,760.00 12,161,430.00 -

550.00 -

690

379,500.00 2,962,875.00 -

1,951,560.00

2,800.00

260.00

728,000.00

Page 36 of 78

Professional Consultants

4,746,600.00 -

6,025.00 -

270.00

1,626,750.00 -

736,320.00

595.00

260.00

154,700.00

Page 37 of 78

Professional Consultants

636,480.00

545.00

260.00

141,700.00

Page 38 of 78

Professional Consultants

4,273,260.00 12,344,220.00 -

2,560.00 -

335.00 -

857,600.00 3,508,750.00 -

787,500.00 787,500.00

661.00 RATE ONLY


Page 39 of 78

350.00

231,350.00 231,350.00

Professional Consultants

25,293,150.00

6,702,975.00 60,253,587.03

Page 40 of 78

Professional Consultants

Page 41 of 78

Professional Consultants

Page 42 of 78

Professional Consultants

Page 43 of 78

Professional Consultants

Page 44 of 78

Professional Consultants

Page 45 of 78

Professional Consultants

United Engineering TOTAL QTY Club house Club House Rate /Unit QTY. Amount TOTAL QTY

3,748.00

930.00

3,485,640.00 -

21,415.00 -

50.00

765
Page 46 of 78

38,250.00

375.00

Professional Consultants

768.00

690

529,920.00 4,053,810.00 -

4,390.00 -

2,502.00

260.00

650,520.00

15,310.00

Page 47 of 78

Professional Consultants

5,860.00

270.00

1,582,200.00 -

35,325.00 -

944.00

260.00

245,440.00

5,315.00

Page 48 of 78

Professional Consultants

816.00

260.00

212,160.00

4,625.00

Page 49 of 78

Professional Consultants

38,268.00

335.00

12,819,780.00 15,510,100.00 -

57,836.00 -

750.00

350.00

262,500.00 262,500.00
Page 50 of 78

4,411.00 -

Professional Consultants

19,826,410.00

Page 51 of 78

Professional Consultants

Page 52 of 78

Professional Consultants

Page 53 of 78

Professional Consultants

Page 54 of 78

Professional Consultants

Page 55 of 78

Professional Consultants

Page 56 of 78

Professional Consultants

United Engineering Rate Amount QTY. Rate Amount

930.00

19,915,950.00 -

765.00

286,875.00
Page 57 of 78

Professional Consultants

690.00

3,029,100.00 23,231,925.00 -

260.00

3,980,600.00

Page 58 of 78

Professional Consultants

270.00

9,537,750.00 -

260.00

1,381,900.00

Page 59 of 78

Professional Consultants

260.00

1,202,500.00

Page 60 of 78

Professional Consultants

335.00

19,375,060.00 35,477,810.00 -

350.00

1,543,850.00 1,543,850.00
Page 61 of 78

Professional Consultants

60,253,585.00

Page 62 of 78

Professional Consultants

Page 63 of 78

Professional Consultants

Page 64 of 78

Professional Consultants

Page 65 of 78

Professional Consultants

Page 66 of 78

Professional Consultants

Page 67 of 78

Professional Consultants

United Engineering Remarks

Page 68 of 78

Professional Consultants

Page 69 of 78

Professional Consultants

Page 70 of 78

Professional Consultants

Page 71 of 78

Professional Consultants

Page 72 of 78

Professional Consultants

Page 73 of 78

professional consultants consulting structural engineers

SL. NO . I

Description of items

UNIT

1 EARTH WORK EXCAVATION General earthwork excavation in all types of soil for levelling & lowering the ground for lowest basement formation level, footings, raft, rc wall foundations, lift pits, trenches, sump tanks etc. from natural ground level up to the pcc bottom, stacking the excavated earth & disposable material where ever indicated in site, Excluding back filling, but including filling depressions wherever necessary, watering, consolidating, transporting surplus excavated earth / debris away from the site, shoring, bailing out water, etc. complete. Contractor shall get acquainted with site conditions, nature of soil and adopt suitable adequate dewatering system as deemed fit for the nature of soil, prevailing water table and water collected by runoff or rain to get the surface reasonably dry for laying pcc at the time of execution so that execution will not be hampered or delayed. The rate shall include 0.0m upto 1.5m depth cum Cutting of soil up to plinth level: from 0 to 1.5mtr depth cum 0.0 m upto 1.5 m depth a) Isolated footing b) Combined footing 1.5m upto 3.0m depth a) Isolated footing b) Combined footing ii 1.5m upto 3.0m depth a) Combined footing (At Lift) a) All soils: from 0 to 1.5mtr depth cum from 1.5 to 3.0mtr depth cum b) Cutting of soil up to plinth level: from 0 to 1.5mtr depth cum from 1.5 to 3.0mtr depth cum 3.0 m to 4.5 m depth cum c) in Hard rocks with controlled blasting: from 0 to 1.5mtr depth cum from 1.5 to 3.0mtr depth cum 3.0 m to 4.5 m depth cum d) in Hard rocks with Chistelling: from 0 to 1.5mtr depth cum from 1.5 to 3.0mtr depth cum 3.0 m to 4.5 m depth cum cum cum

cum cum cum

A EARTH WORK FOR ROADS Earth work excavation by manual means in ordinary soil involving an average horizontal throw upto 0.5m excavated surface levelled and sides neatly dressed, the disposed earth to be levelled neatly after breaking of clods complete as per specifications.

Excavation in soft rock without blasting for formation of roads including 2 stacking neatly, to uniform line and level with all lead cost of all labour, equipment, complete as per specifications. Compaction of original ground with maximum of 6 passes of 8 to 10 tonnes power roller including filling in depression occuring during rolling 3 including cost of all labour, HOM of machinery complete as per specification. Providing and laying of 250mm thick WBM with 65 to 40mm size 4 aggregates with interstices filled with murram jelly with all necessary lead lift and placing in position. Complete Extra for watering the earth to bring the earth upto required optimum 5 misture content manually including cost of all labour complete as per specifications.

Page 74 of 78

professional consultants consulting structural engineers

Extra for watering the earth to bring the earth upto required optimum 6 moisture content with mechinery including cost of all labour, HOM of machineries complete as per specificatons. Extra for rolling to specification with the use of vibratory roller when earth is at suitable moisture content with desired field density not less than 95% of maximum dry density (Modified heavy proctor test) including HOM of machineries complete as per specifications. Extra for rolling to specification with power roller 8-10 tonne when earth is at suitable moisture content with desired field density not less than 95% of maximum dry density (Ordinary proctor test) including HOM of machineries complete as per sepcifications.

B SUB BASES - BASES (NON BITUMINOUS) AND SHOULDERS Providing, laying, spreading and compaction stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with 3 wheeled steel/ 1 vibratory roller 8-10 tonners in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interestices of coarse aggregate, watering and compacting to the required density. Material Using Scrining Type-A (13.2mm agg.) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by 2 tipper to site, laying in uniform layers with paver in sub-base /base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

SOIL NAILING In addition to the general specification in item 1.0, providing and stabilizing the slope of earth cut during the excavation process to prevent the sliding by driving the rebar's to the required depth in slope to the soil surface as per soil consultant /experts recommendations. The rate shall include the fee payable to the experts for their design and mesh with gunniting.

Smtr

SHORING In addition to the general specification in item 1.0, stabilizing the slope of earth during the excavation process to prevent the sliding by providing suitable shoring. The design of shoring system based on the system and material used. Contractor shall study the soil conditions , depth at which shoring may be required using adequate benching and anchoring at base and various levels. The rate shall include making good shoring and recovering the materials used while back filling.

Smtr

BACK FILLING Earth back filling for sides of foundations, retaining wall, trenches, lift pits, sump tank, above raft slab ( filling upto basement floor finish )and else where as directed by engineer in charge including watering and 4 consolidating in 150mm thick layers, etc., complete as per detailed specification with available earth only and shall be stacked with in the site in OSR.

cum

III

MASONRY 1 SIZE STONE MASONRY IN CM (1:6) Providing and constructing of granite/trap/basalt size stone hammered dressed in courses not less than 20cms high,bond stons of 2 m apart in each coused including cost of materials , labour, curing complete as per specifications. CONCRETE 1 PLAIN CEMENT CONCRETE: Providing & laying M10 concrete using 20mm downsize aggregates 75 thick below Footings, Raft, Retaining walls, Sump Tanks, Drains, Trenches, D.G.Foundations, HSD Storage Tanks, STP etc. a) Isolated footing b) Combined footing c) Retaining wall D.P C - Above SSM woks: Providing & laying M10 concrete using 20mm downsize aggregates 75 thick above SSM using water proofing compound. 2 D.P C - Above SSM woks: Providing & laying M10 concrete using 20mm downsize aggregates 75 thick above SSM using water proofing compound.

cum

III

cum cum cum cum

cum

cum

Page 75 of 78

professional consultants consulting structural engineers

3 REINFORCED CEMENT CONCRETE Important notes in regard to reinforced cement concrete. 1. All concrete used for reinforced concrete work (structural concrete) shall be "Controlled concrete" While quoting for structural concrete work contractors are particularly advised to study the relevant drawings carefully before quoting. Contractors shall submit drawings showing the scheme of form work (shuttering) for beams and slabs, areas which project out at various levels as indicated in drawings and this shall be obligatory. The successful tenderer shall maintain at site, cube testing machine in good working order, sieves, slump cone, graduated cylinder and weights, scales for material testing. NOTE: A qualified mechanic shall always be available during working hours for maintenance of weight batching machines. Providing & laying controlled reinforced cement concrete confirming to grades as specified in (IS 456 - 2000) as per specifications using 20mm down size aggregates at any depth or heights excluding the cost of steel reinforcement centring, shuttering, scaffolding but inclusive of cost For all structural concrete elements post construction dimension and levels shall be documented and submitted Note: Construction joints shall be at pre approved locations only shall be vertical or stepped. Concrete shall be chipped immediately after final setting using mechanical chippers and thoroughly cleaned. Surface shall be given a. A thick coat of slurry if the joint is less than 3 days old b. A thick coat of slurry with latex based admixture if the joint is less than 7 days old c. A coat of epoxy if it is more than 7 days Construction joints in columns, walls shall be horizontal and all the latent concrete shall be removed after final setting and shall be given a coat of thick slurry if the joint is below the floor level and mortar poured The rates shall also include account for any admixtures (approved by the consultants) the contractor may use in order to enhance the workability, to achieve accelerated strength, etc. The rate shall include use of plasticizers and retarders to limit the water/cement ratio to 0.45 and the temperature to 25 degree C at the time of setting. Complete care shall be taken to achieve dense and fully watertight concrete. A Using RMC from outside 1 a) M25 for footings -RMC incl Cement b) M20 for Isolated footings- RMC incl Cement c) M20 for Combined footings- RMC incl Cement RCC COLUMNS : Columns of different sizes and shapes at various levels/heights. a)Below Basement(m-35) b)Basement ot Ground (m-35) c) Ground to First floor (m-35) d) First to Second floor (M-30) e)Second to third floor (M-30) f) Second floor to Terrace ( M-25) g) Third floor to Terrace ( M-25 ) h) Terrace to Staircase head room (M-25) i)Terrace to Staircase head room (M-30) M20 conrete for swimming pool: RCC wall Base slab # M-20 for R.C. Slabs of different thickness including Sunken slabs, etc., a)Ramp- RMC incl Cement b)Grade Slab- RMC incl Cement c) ground floor- RMC incl Cement d) First floor -RMC incl Cement e)Second floor- RMC incl Cement f)Third Floor RMC incl Cement g)Terrace floor- RMC incl Cement h) Staircase head room- RMC incl Cement # M-20 for R.C.Beams (upstand and down stand ) a)Ramp beam RMC incl Cement b) ground floor -RMC incl Cement c) First floor -RMC incl Cement d)Second floor -RMC incl Cement e)Third floor- RMC incl Cement f) Terrace floor- RMC incl Cement cum cum cum cum cum cum cum cum

cum cum cum

cum cum cum cum cum cum cum cum cum

cum cum

cum cum cum cum cum cum

Page 76 of 78

professional consultants consulting structural engineers

g) Staircase head room -RMC incl Cement 1 5 M-20 for R.C.Beams (At plinth level )- RMC incl Cement a iii M25 conrete for RCC retaining wall: RCC wall-RMC incl Cement Base slab-RMC incl Cement M20 conrete for RCC retaining wall: RCC wall-RMC incl Cement Base slab-RMC incl Cement

cum

cum

cum cum cum

cum cum

vi

M-20 for R.C.STAIRCASES at all levels including concrete in steps and midlanding. a) Basement to Ground b) Ground to First floor c) First to Second floor d) Second floor to Third floor e) third floor to Terrace

cum cum cum cum cum

Shearwall a) Basement to Ground (M-35) a) Ground to First floor (M-35) b) First to Second floor (M-30) c) Second floor to Third floor(M-30) c) third floor to Terrace(M-25)

cum cum cum cum cum cum

# M-20 for Lintel

IV

FORMWORK FOR CONCRETE WORKS: Scheme of Formwork including casting slabs to gentle slope, special staging for casting floors of different heights, roof projections at various levels and profiled formwork. Contractors shall submit drawings showing the scheme of formwork including back propping and proper sequence of removal of formwork and back propping so that the structural slab will not be overloaded due to construction loads. Formwork shall be designed for close jointed rigid, durable and shall have adequate strength, water tightness and ensure easy removal etc., Props, shoring and bracings shall be all in steel or Aluminium. Formwork designed with proposed materials (to be approved prior to making) shall be able to retain its shape, line, dimension, level within the allowable limits of variations. Formwork shall facilitate for making holes / recess for leaving dowels embedments etc. at no additional cost and shall be submitted for approval. Necessary arrangement shall be envisaged to provide camber in beams or slabs as per design. Formwork shall have adequate openings for cleaning. Formwork in following items of work at all level For beam bottoms & sides, Arch beams slab, ramp beams, racker beams etc. a)Ramp beam b) Plinth c)Ground Floor d)First floor e) Second floor f)Third Floor g) Terrace floor h) Stair case headroom/Above terrace

Smt Smt Smt Smt Smt Smt Smt Smt

2 M-20 for R.C. Slabs of different thickness including Sunken slabs, etc., a)Ramp a)Ground floor b)First floor c) Second floor d) Third fllor e)Terrace floor f)above terrace floor 3 For Columns of different sizes and shapes at various levels/heights. a)Below basement floor b) Basement ot Ground c) Ground to First floor d) First to Second floor e) Second floor to Third floor Smt Smt Smt Smt Smt Smt Smt Smt Smt Smt Smt Smt

Page 77 of 78

professional consultants consulting structural engineers

f) Third floor to terrace g) Above terrace floor

Smt Smt

4 For R.C.STAIRCASES at all levels including steps & midlanding. a)Basement to Ground floor b) Ground to First floor c) First to Second floor d) Second floor e)third floor

Smtr Smtr Smtr Smtr Smtr

5 For Shear wall of different sizes and shapes at various levels/heights. a) Basement ot Ground b) Ground to First floor c) First to Second floor d) Second floor to Third floor e) Third floor to terrace 6 For Retaining wall of different sizes and shapes at various levels/heights. a)base slab b) Wall Smt Smt Smt Smt Smt

Smt Smt

7 For Plinth beam

Smtr

8 For LINTEL AND CHEJJA

Smtr

VI A) REINFORCING STEEL : Providing & Fixing steel reinforcement for RCC including material, fabricating as per IS-2502, transporting, storing, de-coiling, straightening, cutting, bending, spirally hooping and placing in position at all levels, including all labour, equipments, supplies, incidentals, sampling and testing as prescribed in IS codes including all charges thereon for requisite tests, supervision and binding with approved quality binding wire. The measurement shall be as per IS 1200 Part- and unit weight shall be derived as mentioned in IS 1786. The rolling margin shall be on Contractors own cost. The rate shall include cost of cover blocks, binding wire, chairs, spacers and pins to be provided as per specifications and the same will not be measured separately for payment. Quantity of steel as per drawing and with authorized overlaps only shall be measured and paid for. The quoted rate will include welding of reinforcement with low hydrogen low heat welding electrodes for the welding length mentioned in the drawings in place of conventional laps of larger diameter bars only wherever consultants recommend, for which no extra shall be claimed. Replacing conventional laps with welding splices will be entirely at consultants discretion. Such unclaimed welding will also include welding of reinforcement to already fixed insert plates, structural steel members etc. Shear connectors prepared from the reinforcing steel welded to structural steel members shall be measured in the reinforcement item. The rate also includes protecting the reinforcing bars in their virgin form or in the fabricated form, or when placed and tied up position or as dowels left for future continuation of work or at construction joint against corrosion due to exposure to weather if left exposed and unencased for more than three weeks from the date of delivery to the site. Cement wash shall be given to such bars if they are likely to be exposed for more that three weeks and less than twelve weeks. Process of application of cement slurry shall be repeated after every twelve weeks if the exposure period is stretched. High yield strength deformed bars conforming to IS:1786 with Fy=500N/sq.mm SUB TOTAL - STEEL WORKS Grand Total=

Page 78 of 78