Teknike Kantieri

Studenti:

TABELA E LIBREZES SE MASAVE


Volumi sipas projektit
Nr.

Data

Pershkrimi I punimeve

njesi

Niveli I sheshit te ndertimit sipas kartogrames

m3

57

57

Volumi sipas faktit


sasi

Diferenca
sasi

2651

Germim dheu dhe transport me buldozer


Ho=1/4*9[(27.66+29.6+24.18+21.21)+2(28.2+28.93+27.45+25.4+23.33+22.5+23.57+25.72)+4(26.19+26.66+24.18+24.7)]=25.55m
V=361/4[(2.11+4.05+4.34+1.37)+2(2.65+3.38+0.17+1.9+1.98+0.15+3.05+2.22)+4(0.64+1.11+1.37+0.85)]=5302m3
Vg=Vmb=5302/2=2651m3
Germim dheu per themele
Aksi 1-1
Aksi 2-2
Aksi 3-3
Aksi 4-4 (cope 2)
Aksi 5-5
Aksi 6-6
Aksi A-A
Aksi A-A
Aksi C-C
Aksi c-c
Aksi D-D (cope 2)
Aksi D-D
Pa aks
Pa aks
Pa aks

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

9.24
10.24
2.78
6.3
13.95
11.71
5.69
2.7
7.86
2.7
12.3
2.7
8.18
2.87
1.65

0.9
0.9
0.7
0.7
0.9
0.9
1
0.7
1.2
0.7
1
0.7
0.7
1
0.5

1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
0.5

10.8
11.98
2.53
11.47
16.32
13.7
7.4
2.46
12.26
2.46
31.54
2.46
7.44
3.73
0.41
=137

10.8
11.98
2.53
11.47
16.32
13.7
7.4
2.46
12.26
2.46
31.54
2.46
7.44
3.73
0.41
Totali= 137m3

Teknike Kantieri

Studenti:

Mure guri per themele


Aksi 1-1
Aksi 2-2
Aksi 3-3
Aksi 4-4 (cope 3)
Aksi 5-5
Aksi 6-6
Pa aks
Pa aks
Aksi A-A
Aksi A-A
Aksi c-c (cope 2)
Aksi C-C
Aksi D-D
Aksi D-D
Pa aks
Aksi E-E
Brez betoni 15cm ne kuoten -0.04m
Aksi 1-1
Aksi 2-2
Aksi 3-3
Aksi 4-4 (cope 3)
Aksi 5-5
Aksi 6-6
Pa aks
Pa aks
Aksi A-A
Aksi A-A (cope 2)
Aksi c-c (cope 2)
Aksi C-C
Aksi D-D
Aksi E-E
Pa aks
Pa aks

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

7.84
9.64
1.5
6.3
11.17
10.51
5.05
1.65
4.83
2.7
2.7
7.86
11.43
4.83
2.17
12.13

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

9.24
10.24
2.78
6.3
14.25
11.71
5.05
1.65
5.57
2.7
2.7
7.86
11.43
11.13
2.17
1.09

1.17
1.17
1.1
1.1
1.17
1.17
1.1
0.5
1.375
1.1
1.1
1.47
1.47
1.375
1.375
1.375
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6

9.17
11.28
1.65
20.79
13.06
12.29
5.55
0.83
6.64
2.97
5.94
11.55
16.8
6.64
2.98
16.68

0.15
0.83
0.15
0.92
0.15
0.25
0.15
1.71
0.15
1.28
0.15
1.05
0.15
0.45
0.15
0.12
0.15
0.5
0.15
0.48
0.15
0.48
0.15
0.7
0.15
1.03
0.15
1
0.15
0.19
0.15
0.1
Totali= 11.09 m3

9.17

Teknike Kantieri

Studenti:

Brez betoni 10 cm , kuota -0.65


Aksi 1-1
Aksi 2-2
Aksi 3-3
Aksi 4-4 (cope 3)
Aksi 5-5
Aksi 6-6
Pa aks
Aksi A-A

m3
m3
m3
m3
m3
m3
m3
m3

9.24
10.24
2.78
6.3
14.25
11.71
5.05
5.57

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6

0.1
0.554
0.1
0.614
0.1
0.614
0.1
1.134
0.1
0.855
0.1
0.703
0.1
0.303
0.1
0.334
Totali= 5.111 m3