Professional Documents
Culture Documents
4
STEP 0 Define system level to be analyzed
Yes
Accepted ? Yes
No STEP 3 1. Information collection for future operation 2. RISK assessment Repair/ upgrade? No Accepted ? Yes
STEP 5 Implementation
10
11
12
13
14
15
Yes
No STEP 3 1. Information collection for future operation 2. RISK assessment Repair/ upgrade? No Accepted ? Yes
STEP 5 Implementation
16
Monitoring
n Monitoring process and operation parameters is an important mitigation action for the pipeline, riser and subsea system.
Pressure Temperature Content of solids (sand) Fluid composition (inclusive water content) Stress, strain, movement
n For rotating equipment: vibration analysis n Corrosion monitoring n Sand detection and/or erosion monitoring
17
Maintenance
n The output from the LE analysis can also be an update of the maintenance program.
Testing
n Pressure testing can be used to verify that the systems fulfill the defined pressure requirement. Pressure testing is frequently used to control the integrity of the flexible pipes. Testing is also used to control the functionality of valves (e.g. safety valves).
New barriers
n Most likely not applicable
18
n Reliable corrosion monitoring system for installed pipelines n Hydrogen Induced Stress Cracking
- Bolting material - Flowlines/pipelines - High strength materials