Atlantis The Palm, Dubai 26 Apr 2005 Project 03180 1 1.1 .

1 General WORK INCLUDED

02511 FIRE MAINS Page 1

Provide work of this Section in accordance with the Contract Documents. .1 Fire mains to within 1.5 m of building wall

1.2 .1 .2 .3

RELATED SECTIONS Section 02320: Trenching and Backfill for Site Utilities Section 13110: Cathodic Protection - Underground Piping Section 15300: Fire Protection .1 Fire mains into building

1.3 .1

REFERENCES Conform to the latest edition of the following: ASTM A500 AWW C-651 CSA A23.1 CAN/CSA G164-M CAN/CGSB 1.59-M CSA W59-M CSA W117.2 NFPA 24 Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes American Water Works Association, Disinfecting Drinking Water Mains Concrete Materials and Methods of Concrete Construction Hot Dip Galvanizing of Irregularly Shaped Articles Alkyd, Exterior Gloss Enamel Welded Steel Construction (Metal Arc Welding) Safety in Welding, Cutting and Allied Processes National Fire Protection Association, Standard for the Installation of Private Fire Service Mains and their Appurtenances

1.4 .1 .2

CODES AND REGULATIONS, PERMITS AND FEES Apply for and obtain permits required for the work of this Section and pay any costs levied for permits, inspections and fees. Underwriters Approval .1 .2 All fire protection work requires the approval of the Employer's fire insurance underwriter. If required by Employer's fire insurance underwriter, prepare complete Drawings of the fire protection system. Submit six (6) copies of the plans through the Employer's fire insurance broker for approval. Submit all copies of the Drawings duly approved by the Employer's insurance underwriter to the Employer for final review prior to the commencement or work. Equipment, materials and installation to be in accordance with the above approved Drawings and subject to the inspection and testing requirements of the Employer's Insurance Underwriter.

.3

******SPEC NOTE: THE FOLLOWING APPLIES TO TOYOTA PROJECTS. 1.5 SUBMITTALS .1 NORR Limited Submit shop drawings in accordance with Section 01300. Architects & Engineers

Atlantis The Palm, Dubai 26 Apr 2005 Project 03180 .2 Submit as shop drawings: .1 .2 .3 1.6 .1 Details of hydrants, valves and post indicators. Layout drawings as prepared by Hyprescon Inc. Details of precast and cast-in-place valve chambers.

02511 FIRE MAINS Page 2

CATHODIC PROTECTION Include and be responsible for the cathodic protection system specified in Section 13110. Products MATERIALS .1 .2 Pipe, Valves and Fittings: Conform with Piping Standard 007SW attached to and forming part of this Section. Supervisory Switches .1 .2 .3 .4 ULC listed and labeled 120 volt, normally open switches on P.I.V.'s installed under this Section. Potter Electric Model No. PCVS-2. ULC listed and labeled 120 volt, normally open switches on gate valves installed under this Section, Potter Electric Model No. OSYS-U2.

2 2.1

Tracer Wire: 14 gauge TWH solid copper light plastic coated. Pipe Protection Posts and Rails: Conforming to ASTM A500, schedule 40 standard weight steel pipe, cleaned to SSPC SP3 and shop primed with primer conforming to CISC/CPMA 2.75 (hot dip galvanized to CAN/CSA G164-M.)

USE THE FOLLOWING ONLY FOR HOT DIPPED GALVANIZED PIPE. .5 Pipe Finish: ICI Devoe 5467/5469 or approved equivalent 2-part polyamide epoxy tie coat, and exterior alkyd enamel topcoat conforming to CAN/CGSB-1.59-M. .6 .7 Pipe Finish: Exterior grade alkyd enamel conforming to CAN/CGSB 1.59-M, colour as selected by the Engineer. Concrete: Conforming to CSA-A23.1, Clause 14 and the following requirements: .1 .2 .3 .8 .9 .10 .11 Minimum 28 day compressive strength of 20 MPa 5% to 7% air entrainment Slump of 4" maximum and 1" minimum

Precast Concrete Valve Chamber: Precast circular units which conform to ASTM C478. Cast In Place Valve Chamber: Formwork and concrete in accordance with CSAA23.1 Access to Valve Chamber: 610 mm dia. closed cover standard manhole, Canron DS-579, Wotherspoon JW150, McCoy HM3 or Mueller S-412. Hinged Valve Chamber Cover: 600 mm x 600 mm hinged aluminum checker plate frame and cover suitable for traffic loading and anchoring to precast or cast-in-place concrete chamber.

NORR Limited

Architects & Engineers

Atlantis The Palm, Dubai 26 Apr 2005 Project 03180 2.2 .1 .2 .3 3 3.1 .1 .2 FABRICATION OF PROTECTION POSTS AND RAILS

02511 FIRE MAINS Page 3

Connect pipe components together by the continuous welding method to form postand-rail assemblies. Conform to CSA W48.1-M, CSA W59-M and CSA-W117.2. Grind welds to a uniformly smooth finish. Touch up damaged galvanizing in the field using zinc rich primer. Execution MEASUREMENTS AND DEVIATIONS Where any parts of the work are specifically located by dimensions on the Drawings, check and verify these dimensions on site prior to installation. Examine work of other Trades or Contractors prior to commencement of fire protection installations. Report in writing to the Engineer any discrepancies on the part of other Trades or Contractors which will affect the fire protection installations. Failure to report discrepancies shall be considered acceptance of the conditions. Where site conditions require minor deviations from indicated arrangements or locations, make such changes on approval of the Engineer without additional cost to the Employer. Should any discrepancies occur during installation of the work which will necessitate major revisions, inform Engineer immediately and secure his authorization in writing before proceeding with the work. INSTALLATION OF PIPING

.3

.4

3.2 .1 .2

Conform with applicable requirements of NFPA 24. Lay pipe in true alignment and to design elevations. Make joints in strict accordance with the manufacturer's printed instructions, and carefully bed fittings, hubs, or couplings to ensure constant support of the entire length of pipe. Lay piping in clean dry trenches, take particular care to prevent twigs, stones, or other foreign matter from entering the pipe. Cap or plug open end of pipe at times during which work is not in progress and remove any water, muck, or debris accumulating during periods of temporary cessation of work, prior to the resumption of pipe laying. Anchor 45 degree elbows, 90 degree elbows, and tees in piping, and hydrants with mechanical joint connections, with tie rods and thrust blocks. Install tie rods, clamps, bolts, nut, and washers of approved size and type, in a prescribed manner, utilizing tie rod lugs on the fittings, and with clamps shouldered against fittings or pipe hubs. Where tie rods are required on spigot ends of pipe, install clamp not less than 300 mm from the joint. Coat tie rods, clamps, bolts, and washers with a bitumastic compound after installation, to prevent corrosion. Clean buried parts of post indicator valves, valves and hydrants and coat with same compound. Place thrust blocks of 20 MPa concrete at all bend and tee fittings in piping. Poured in place concrete to provide a bearing face area against undisturbed soil of the trench wall, in accordance with requirements of NFPA 24. Pour concrete in such a way that all connections are capable of being removed for servicing. Do not pour against nuts, bolts or across flanges.

.3

.4 .5

.6

.7

NORR Limited

Architects & Engineers

Atlantis The Palm, Dubai 26 Apr 2005 Project 03180 .8 .9 .10 .11

02511 FIRE MAINS Page 4

Set hydrants on 450 mm square concrete base, 200 mm thick, with 0.75 cu.m of coarse gravel placed around and beneath for drainage. Take precautions not to obstruct drainage holes in base of hydrant. Install gate valve and valve box adjacent to each hydrant. Adjust valve box to finished grade. Install diaper and pour mortar around all assembled joints of concrete pressure pipe in accordance with manufacturers recommendations. Provide pipe manufacturersupplied restrained joints. TRACER WIRE

3.3 .1

Along full length of all buried plastic fire mains, install tracer wire and bring to surface at each termination point valve box, and post indicator, with 900 mm of extra length of coiled wire. Attach tracer wire to pipe with plastic electrical tape. Outside building walls, leave sufficient wire to extend wire to building wall and grade, plus 900 mm of extra length of wire. VALVE CHAMBER

3.4 .1 .2

Construct valve chamber in accordance with details indicated, plumb and true to alignment and grade. Install valves, fittings, pipe and ancillary items in valve chamber in accordance with details on Drawings and as specified in Piping Standard 007SW.

******SPEC NOTE: THE FOLLOWING SHADED TEXT IS JOB SPECIFIC AND IS ADDED TO THIS MASTER SECTION AS GUIDE SPEC ON PROJECTS WITH SIMILAR WORKS ARE TO BE PERFORMED. 3.5 BUMPER POSTS AND RAILS .1 .2 Auger for, and install posts and rail assemblies for all PIV's and hydrants. Form top 100 mm of foundations with "Sonotube" forms. Pour concrete foundations. Fill posts with rampacked concrete. Form top of fill to a crowned smooth finish.

USE THE FOLLOWING FOR HOT DIPPED GALVANIZED STEEL. .3 Wash pipe free of grime and dirt. Let dry. Apply a tie coat of epoxy. Within 48 hours of tie coat application, apply 2 coats of topcoat. Take notice that topcoat must be applied within 48 hours otherwise topcoat will not adhere properly. Apply tie coat/topcoat in a continuous 2-stage operation, i.e. if rain is forecast within 48 hours of tie coat application, postpone such tie coat application. .4 3.6 .1 Wash pipe free of grime and dirt. Let dry. Apply 2 coats of paint to a dry film thickness of 38 - 50.8. FLUSHING OF PIPING Flush piping at a flow rate to conform with requirements of NFPA 24, before connection is made to existing main. Flush sections of line, if necessary, to suit installation procedures. STERILIZATION OF PIPING .1 After flushing of piping is completed, perform 24 hour sterilization treatment of the system, by treating the water with 50 parts of chlorine per million as recommended in AWWA C-651. Flush system to remove chlorine content to an acceptable level. TESTING Architects & Engineers

3.7

3.8 NORR Limited

Atlantis The Palm, Dubai 26 Apr 2005 Project 03180 .1

02511 FIRE MAINS Page 5

Apply hydrostatic test to piping system in accordance with applicable requirements of NFPA 24, and at a minimum test pressure of 1380 kPa (200 psig) for a minimum period of two hours. Furnish pumps, gauges and other equipment required to complete the test. Test in presence of Engineer and Employer's authorized representative. Promptly repair any defects which develop during tests and re-test system to complete satisfaction of authorized inspectors. Submit a certificate covering materials and tests to the Underwriters Inspection Authority, together with a request for inspection and approval. On receipt of approval, forward certificate to the Employer. Fill pipe line and leave in full operational condition and pressure after completion of testing and sterilization. End of Section

.2 .3 .4 .5

.6

NORR Limited

Architects & Engineers