You are on page 1of 7

DAILY COMPLETED PILES RECORD

SUNWAY CONSTRUCTION SDN BHD


(Co. No. 27175-V)
Project Code:

18916379

Name of Project:

DIA.
.. DIA.
.. DIA.
Pile No. BORED CONC. BORED CONC. BORED CONC.
LENGTH LENGTH LENGTH LENGTH LENGTH LENGTH

Zone

TMN DESA - PHASE 1

Date:

REINFORCEMENT

..

.. .. ..

ROCK
QTY

REMARKS INCLUDING
OBSTRUCTION AND DELAYS

TOTAL

SITE REPRESENTATIVE:-

Revision No: 0

CLIENT / CONSULTANT'S REPRESENTATIVES:-

SIGNATURE:

SIGNATURE:

NAME:

NAME:

Issue No: 1

Effective Date: 01/07/2009

RIN
SUNWAY CONSTRUCTION SDN BHD (Co. No. 27175-V)

Page No.:

Level 8, Menara Sunway, Jalan Lagoon Timur,

Tel No.:
Fax No.:

Bandar Sunway, 46150 Petaling Jaya,


Selangor Darul Ehsan.

03-5639 9333
03-5639 9533

REQUEST FOR INSPECTION


Project Code:
1891 6379
Project:
FABER UNION, TAMAN DESA
PHASE 1

Ref.: RIN/FUP1/
Date:.

Kindly be informed that the following item(s) are


ready for inspection.

10/16/2010

Submitted by:

ROSASMAN

Date / Time:

16/10/10 - 11.00AM

Requisition Received By:


Date / Time:
Requisition Date / Time: 18//10/10 - 8.00 AM
Location: FROM POINT S17 TO S22

INSPECTION COMMENTS
We have received the items above and found that:
(
)
Acceptable. You may proceed.
(
)
Not acceptable. Please rectify item below and re-submit request for inspection.

Inspection Commencement:
Inspection End:
Attended by:

Checked by:

Sunway Construction Sdn Bhd Rep.


Name:
MD. NIZAR HASAN

Client / Consultant Rep.


Name:

Revision No: 0

Issue No: 1

Effective Date: 01/07/2009

Section:
Structure No.:
BORING PLANT (
)
Boring (Soil) Time Start
Boring (Soil) Time End
Boring (Rock) Time Start
Boring (Rock) Time End
Concrete Time Start
Concrete Time End
Piling Platform Level
Depth of Bore (from P. P. L.)
Top of Casing Level
Cut-off Level
TOE Level
Empty Bore Depth (P.P.L. to C.O.L.)
Pile Length
Rock Socket Length
Stability Method
Total Casing Length
Main Reinforcement Content
Helical / Spiral Reinforcement
Total Cage Length
Time Start Cage Installation
Time End Cage Installation
Concrete Grade
Concrete Slump
Direct / Tremie Discharge
No. of Test Cubes
Actual Concrete Volume
Theoritical Concrete Volume
Actual Concrete Level

Revision No: 0

PILE BORE LOG


Dwg No.:
Pile No.:

hrs
hrs
hrs
hrs
hrs
hrs
m
m
m
m
m
m
m
m
m

m
hrs
hrs
mm
Tremie
nos
m3
m3
m3

DEPTH
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_

PILE BORE LOG


Date:
Pile Diameter:
DESCRIPTION

TOOL
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_

Section:
mm Structure No.:
TIME

Dwg No.:
Pile No.:

BORING PLANT (
)
Boring (Soil) Time Start
Boring (Soil) Time End
Boring (Rock) Time Start
Boring (Rock) Time End
Concrete Time Start
Concrete Time End
Piling Platform Level
Depth of Bore (from P. P. L.)
Top of Casing Level
Cut-off Level
TOE Level
Empty Bore Depth (P.P.L. to C.O.L.)
Pile Length
Rock Socket Length
Stability Method
Total Casing Length
Main Reinforcement Content
Helical / Spiral Reinforcement
Total Cage Length
Time Start Cage Installation
Time End Cage Installation
Concrete Grade
Concrete Slump
Direct / Tremie Discharge
No. of Test Cubes
Actual Concrete Volume
Theoritical Concrete Volume
Actual Concrete Level

Issue No: 1

Date:
Pile Diameter:
DEPTH

hrs
hrs
hrs
hrs
hrs
hrs
m
m
m
m
m
m
m
m
m
m

m
hrs
hrs
mm
Tremie
nos
m3
m3
m3

DESCRIPTION
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_

TOOL

mm
TIME

_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_

Effective Date: 01/07/2009

CONCRETE PROGRESS CURVE


SUNWAY GEOTECHNICS (M) SDN BHD (Co. No . 414014-W)
Level 8, Menara Suway, Jalan Lagoon Timur, Bandar Sunway, 46150 Petaling Jaya Selangor.
Tel: 03-5639 9333

PROJECT CODE:
PILE REF.:
TYPE:
PILE SIZE:

Fax: 03-5639 9533

18916426

10

11

12

13

14

15

Depth (m)

TRUCK NO.
1
2
3
VOLUME
6.0 6.0 4.0
CUM. VOLUME
6.0 12.0 16.0
ACTUAL DEPTH 16.0 9.0 topping

PROJECT:
Lt 28 - Hap Seng (JTR)
THEO. VOLUME:
m3
ACTUAL VOLUME:
m3
OVERBREAK:
#VALUE!
PERCENTAGE:
#VALUE!

Volume (m3)

Revision No: 0

Issue No: 1

Effective Date: 01/07/2009

CONCRETE PROGRESS RECORD


SUNWAY CONSTRUCTION SDN BHD (Co. No. 27175-V)
Level 8, Menara Suway, Jalan Lagoon Timur, Bandar Sunway, 46150 Petaling Jaya, Selangor.
Tel: 03-5639 9333

Fax: 03-5639 9533

Project Code:

Project:

Date of Concreting:

Pile No.:

Depth:
Casing Lavel:
Cut-Off Level:
G.L. to C.O.L.:
Pile Length:
Depth
(m)

m
mRL
mRL
mbTOC
mRL

Concrete Mix Design:


Theoritical Volume:
Actual Volume:
Over Consumption:

Tremie Concrete Concrete Poured


Level (m)
(m3)
Truck
Cum.

Measuring Theoritical
Height
(m)

m3
3
m
m3
%
Actual
Height
(m)

Cube No.

Recorded by:

Verify by:

Verify by:

Date:

Main Con. Rep.


Date:

Client Rep.
Date:

Revision No: 0

Issue No: 1

Slump
(mm)

Effective Date: 01/07/2009

Pile Size :

1500

Depth (m) Theo. Volume


0
0.00
1
1.77
2
3.53
3
5.30
4
7.07
5
8.84
6
10.60
7
12.37
8
14.14
9
15.91
10
17.67
11
19.44
12
21.21
13
22.98
14
24.74
15
26.51
16
28.28
17
30.05
18
31.81
19
33.58
20
35.35
21
37.11
22
38.88
23
40.65
24
42.42
25
44.18
26
45.95
27
47.72
28
49.49
29
51.25
30
53.02
31
54.79
32
56.56
33
58.32
34
60.09
35
61.86
36
63.63
37
65.39
38
67.16
39
68.93
40
70.70
41
72.46
42
74.23
43
76.00
44
77.76
45
79.53

Pile Size :

1350

Depth (m) Theo. Volume


0
0.00
1
1.43
2
2.86
3
4.29
4
5.73
5
7.16
6
8.59
7
10.02
8
11.45
9
12.88
10
14.32
11
15.75
12
17.18
13
18.61
14
20.04
15
21.47
16
22.91
17
24.34
18
25.77
19
27.20
20
28.63
21
30.06
22
31.49
23
32.93
24
34.36
25
35.79
26
37.22
27
38.65
28
40.08
29
41.52
30
42.95
31
44.38
32
45.81
33
47.24
34
48.67
35
50.11
36
51.54
37
52.97
38
54.40
39
55.83
40
57.26
41
58.69
42
60.13
43
61.56
44
62.99
45
64.42

Pile Size :

1200

Depth (m) Theo. Volume


0
0.00
1
1.13
2
2.26
3
3.39
4
4.52
5
5.66
6
6.79
7
7.92
8
9.05
9
10.18
10
11.31
11
12.44
12
13.57
13
14.70
14
15.84
15
16.97
16
18.10
17
19.23
18
20.36
19
21.49
20
22.62
21
23.75
22
24.88
23
26.02
24
27.15
25
28.28
26
29.41
27
30.54
28
31.67
29
32.80
30
33.93
31
35.06
32
36.20
33
37.33
34
38.46
35
39.59
36
40.72
37
41.85
38
42.98
39
44.11
40
45.24
41
46.38
42
47.51
43
48.64
44
49.77
45
50.90

Pile Size :

1050

Depth (m) Theo. Volume


0
0.00
1
0.87
2
1.73
3
2.60
4
3.46
5
4.33
6
5.20
7
6.06
8
6.93
9
7.79
10
8.66
11
9.53
12
10.39
13
11.26
14
12.12
15
12.99
16
13.86
17
14.72
18
15.59
19
16.45
20
17.32
21
18.19
22
19.05
23
19.92
24
20.78
25
21.65
26
22.52
27
23.38
28
24.25
29
25.11
30
25.98
31
26.85
32
27.71
33
28.58
34
29.44
35
30.31
36
31.18
37
32.04
38
32.91
39
33.77
40
34.64
41
35.51
42
36.37
43
37.24
44
38.10
45
38.97

Pile Size :

900

Depth (m) Theo. Volume


0
0.00
1
0.64
2
1.27
3
1.91
4
2.55
5
3.18
6
3.82
7
4.45
8
5.09
9
5.73
10
6.36
11
7.00
12
7.64
13
8.27
14
8.91
15
9.54
16
10.18
17
10.82
18
11.45
19
12.09
20
12.73
21
13.36
22
14.00
23
14.63
24
15.27
25
15.91
26
16.54
27
17.18
28
17.82
29
18.45
30
19.09
31
19.72
32
20.36
33
21.00
34
21.63
35
22.27
36
22.91
37
23.54
38
24.18
39
24.81
40
25.45
41
26.09
42
26.72
43
27.36
44
28.00
45
28.63

Pile Size :

750

Depth (m) Theo. Volume


0
0.00
1
0.44
2
0.88
3
1.33
4
1.77
5
2.21
6
2.65
7
3.09
8
3.53
9
3.98
10
4.42
11
4.86
12
5.30
13
5.74
14
6.19
15
6.63
16
7.07
17
7.51
18
7.95
19
8.40
20
8.84
21
9.28
22
9.72
23
10.16
24
10.60
25
11.05
26
11.49
27
11.93
28
12.37
29
12.81
30
13.26
31
13.70
32
14.14
33
14.58
34
15.02
35
15.46
36
15.91
37
16.35
38
16.79
39
17.23
40
17.67
41
18.12
42
18.56
43
19.00
44
19.44
45
19.88