GS BATTERY VIET NAM EXTENSION FACTORY 4&5 PROJECT

THE METHOD STATEMENT FOR ELECTRICAL WORKS

GS BATTERY

TODA

TODA CORPORATION HITACHI PLANT TECHNOLOGIES,.LTD


NOV-2011

CONTENTS
ELECTRICAL SERVICES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Method Statement for Installation of underground piping Method Statement for Installation of HV Switchgears Method Statement for Installation of LV Switchgears Method Statement for Installation of Oil Type Transformer Method Statement for Installation of Cable Pulling of HT Cable and Testing Method Method Statement for Installation of MSB/ FDB/PDB/MCC Method Statement for Installation of Cable Ladder, Tray and Trunking Method Statement for Electrical Installation Testing Form Method Statement for Earth Pit (Double Flange) Installation

Method Statement for the Procedures of Continuity and Earth Value Testing Method Statement for Installation of Recessed Downlights

Method Statement for Installation of Surface Mounted Batten Lightings Method Statement for Installation of Recessed/ Surface Mounted Exit Lights Method Statement for Installation of Power Point Outlet (Surface & Conceal & Isolator (Surface Only) Method Statement for Installation of Fireman Switch

16 17 18

Method Statement for Installation of Box Speaker Method Statement for Installation of Recessed Ceiling Speaker Method Statement for Installation of Cable Pulling of LT Cable and Testing Method

Method Statement for Installatio underground piping

1. .1

GENERAL DESCRIPTION

The heavy telecommunication . 2 STANDARDS All Singapore as

All Telecommunication Telecommunication 1.3 UNDERGROUND Underground Drawings. ipeworks Pipeworks Underground below Factory to 2. .1 vertical

INSTALLATION GENERAL The Distribution

.2

UNDERGROUND All at a throughout by not

.3

CABLE TRAYS, TRUNKINGS AND CONDUIT A be rubber Vertical support nylon/polyethylene

Unless trays be above than Sub .4

otherwise where mounted the 3.3m Contract

TELEPHONE The Telecommunication shown 4-pair shall telephone the Where approved For polyethyene Terminal landed/strata Sub

multi-core run Sub Contract telephone

Method Statement for the Installation

Objective The objective of this method statement is to describe the procedures for the installation of the HV Switchgear. Preliminaries The HV Switchgear delivered & installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of the HV Switchgear, area for HV Switchgear to be cleared of debris & obstruction. Plinths (if applicable) are to be ready.

The HV Switchgear supplier shall be involved in the complete delivery and installation of the HV Switchgears at its respective locations. The approved or latest revision drawing must be provided to the installation terms for installation works. Procedures 1. 2.

Ensure that site access and location is cleared and free of debris and obstruction. Ensure that height clearance for hoisting of HV switchgear is catered all the respectively destined floor where the switchgear to be off-loaded. Mark out all relevant positions or locations shown on the working drawings for installation to proceed.

3.

4. 5.

Prior to assembly of the switchgear, the panel will be check in section with 1, 2, 3 as reference to the approved drawings. Position the panel section on the plinth (if applicable) follow by 1, 2, 3 from right to left.

6.

Tighten the switchgear panel to the plinth (if applicable) using the following bolts and nuts.

7.

Jointing the busbar section by section and all nuts must be properly torque with markings as follows:

Type of Connection Bolt Size

Torque Values (Nm) M6 8 M8 20 Bolt & nuts c/w spring washers M10 40 M12 M16 70 140

8.

Cleanliness within the switchgear are to be achieved. All installation debris are to be removed from Switchboard upon completion of installation.

9.

To ensure that the HV Switchgear room is lockable at all times after th complete installation.

Safety Precautions 1. To barricade all work areas relating to the works inclusive of the designated areas for parking of lorry crane and unloading of the switchgears. To wear proper protection equipment (PPE) for personal safety. To confirm that the documentation for the lifting gear equipment is valid.

2. 3.

Method Statement for the Installation

LV Switchgears

Objective The objective of this method statement is to describe the procedures for the installation of the LV Switchgear. Preliminaries The LV Switchgear delivered & installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of the LV Switchgear, area for LV Switchgear to be cleared of debris & obstruction. Plinths (if applicable) are to be ready. The LV Switchgear supplier shall be involved in the complete delivery and installation of the LV Switchgears at its respective locations. The approved or latest revision drawing must be provided to the installation terms for installation works. Procedures 1.

Ensure that site access and location is cleared and free of debris and obstruction.

2. 3.

Ensure that height clearance for hoisting of LV switchgear is catered all the respectively destined floor where the switchgear to be off-loade Mark out all relevant positions or locations shown on the working drawings for installation to proceed.

4. 5. 6.

Prior to assembly of the switchgear, the panel will be check in section with 1, 2, 3 as reference to the approved drawings.

Position the panel section on the plinth (if applicable) follow by 1, 2, 3 from right to left. Tighten the switchgear panel to the plinth (if applicable) using the

following bolts and nuts.

7.

Jointing the busbar section by section and all nuts must be properly torque with markings as follows:

Type of Connection Bolt Size

Torque Values (Nm) M6 8 M8 20 Bolt & nuts c/w spring washers M10 40 M12 70 M16 140

8.

Cleanliness within the switchgear are to be achieved. All installation debris are to be removed from Switchboard upon completion of installation.

9.

To ensure that the LV Switchgear room is lockable at all times after th complete installation.

Safety Precautions 1. To barricade all work areas relating to the works inclusive of the designated areas for parking of lorry crane and unloading of the switchgears. 2. 3. To wear proper protection equipment (PPE) for personal safety.

To confirm that the documentation for the lifting gear equipment is va

Method Statement for the Installation

Oil Type Transformers

Objective The objective of this method statement is to describe the procedures for the installation of the Oil Type Transformers. Preliminaries The Oli Type Transformers delivered & installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of the Oil Type Transformers, area for Oil Type Transformers to be cleared of debris & obstruction. Plinths (if applicable) are to be ready. Check the nameplate ratings of the transformers, and any special instructions concerning auxiliary apparatus with those on the approved drawings. The approved or latest revision drawing must be provided to the installation terms for installation works. Procedures 1. Prior installation and hoisting, check for possible damage or contamination during shipment or storage.

2. 3.

Ensure that site access and location is cleared and free of debris and obstruction.

Ensure that height clearance for hoisting of Oil Type Transformers catered at all the respectively destined floor where the Transformer to off-loaded. Mark out all relevant positions or locations shown on the working drawings for installation to proceed.

4. 5. 6.

Position the transformer enclosure on the plinth (if applicable) and tig the enclosure to the plinth (if applicable) using floor anchor and bolts. Inspect the transformer and auxiliary equipment for alignment and tightness of foundation bolts and fixings in general.

7. 8.

Jointing of the busbars or cables and all nuts must be properly torque with markings. Inspect the earthing bolts and connections to the earth bar.

9.

Inspect the bolting to the neutral connection and ensure transformer neutral correctly connected to earth as per TT or TN-S system. Confirm the transformer tap changer ratio. Verify that the transformer phasing matches the incoming busduct or cable phasing.

10. 11.

12.

Cleanliness within the transformer enclosure is to be achieved. All installation debris are to be removed from transformer upon completio of installation. All interior are to be vacuum cleaned thoroughly and th enclosure is closed before energisation.

13.

Prior energizing of transformer, carry out a visual check on the confor of tightening, at the joints and the connections to the transformers and switchboards.

14.

Transformer supplier to conduct relevant transformer tests (E.g. wind resistance test, winding insulation test, winding pressure test, transfor auxiliary equipment test, etc) Engage a Licensed Electrical Worker to energize the transformer. Transformers when operating correctly will have a moderate hum. Excessive noise may be an indication of hardware that has not been tightened correctly or of metal parts that have been improperly assembled.

15.

16.

Occurrence of sparking at any point of the transformer is not a norma condition. De-energize the transformer immediately and correct the

cause immediately. Replace faulty parts and re-conduct an insulation resistance test again before attempting to energize again.

Safety Precautions

1.

To barricade all work areas relating to the works inclusive of the designated areas for parking of lorry crane and unloading of the switchgears.

2. 3.

To wear proper protection equipment (PPE) for personal safety.

To confirm that the documentation for the lifting gear equipment is va

Method Statement for the Installation

Cable pulling of HT Cable & Testing Method

Objective The objective of this method statement is to describe the preparation, delivery and installation of Cable pulling of HT Cable & Testing Method

Preliminaries

The cables delivered and installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of cables, all cable support system must be checked and clean. Ensure all cable supports are clear of debris etc. for installation of HT cables. The approved or latest revision drawing must be provided to the installation teams for the installation works. Procedures 1. 2. 3. 4. 5. 6. 7. 8.

Check insulation of HT Cables using HT Insulation tester before layin cables Use proper cable drum s jack & stand to hold cable drum Ensure that one worker is stationed at every existing bend Use cable roller every 2M for pulling of HT Cable Cable clamps to be used before entering to board & transformer

Labeling of cables using Yellow slotted label with cable tie on every c Engage EMA licensed cable jointer to terminate cable

Prior testing of HV cables, all cleatings, supports, backfilling of trench shall be completed. Earth connections must have been completed an tested.

9.

Engage EMA tester to conduct injection test to HT cables c/w PE endorsement. All results are to be in accordance to relevant manufac specifications, code of practice or standard.

Method Statement for the Installation

MSB/MCC/ FDB/ DBP

Objective The objective of this method statement is to describe the preparation, delivery and installation of LSB, MB, DB & LSBs (wall mounted)

Preliminaries The panels delivered and installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of panels, the walls or ceiling soft-fit shall be plastered and painted if required before installation of panels. The riser/ switch room shall be completed with lockable door before panels can be installed for safety reasons. The approved or latest revision drawing must be provided to the installation teams for the installation works.

Procedures 1. 2. 3. 4. Mark on wall where MSB,MCC, FDB, DPB required to install on slap. Install Unistruct with M10 Drop-in Anchor on wall Install Panel on unistruct with M10 spring, washer & bolt.

Ensure all equipment installed in switchboard is in good condition and finishes are undamaged. Ensure that all relays and meters are in goo condition and correct for duty. Ensure that appropriate warning labels

fitted to appropriate cover, components and terminals and that any sa shrouds or covers are correctly fitted and undamaged. 5.

Ensure that all withdrawable or moving portion mechanisms operate smoothly and without distortion. Ensure that all panel doors open and

smoothly and that all gaskets, rubber lining and seals are in good con and correctly seated. 6. Refer to shop drawing.

Method Statement for the Installation

Cable ladder, tray and trunking installation

Objective The objective of this method statement is to describe the preparation, delivery and Cable ladder, tray and trunking installation

Preliminaries The cable trays/ trunkings/ ladders delivered and installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of cable supports, the walls or ceiling soft-fit shall be plastered and painted if required before installation of cable support. The approved or latest revision drawing must be provided to the installation teams for the installation works.

Procedures 1. 2. 3. 4. For basement area, use unistruct supports as hanger

For other corridor area, use M8 threaded rod & unistruct for general s for cable ladder, tray & trunking Use original fittings or joints during installation.

Ensure that all cut ends of cable trays/ trunkings/ ladders are free from and edges smoothened. All cut ends will be treated with a layer of anti-corrosion paint finish and a layer of epoxy paint finishing similar t original cable trays/ trunkings/ ladders color.

5. 6. 7.

Ensure that copper earth links are used at all joints.

When branching out of final circuits from trunking to conduit, use junc boxes

Engraved labels to be used to identify cable supports at every 3 mete interval

8.

Refer to attach shop drawing.

TABLE B Pipe Support would be summarized as follows :PIPE SIZE (mm) VERTICAL DISTANCE (m)

o25 ~ o40 o50 o65 ~ o80 o100 o150 o200 o250 & ABOVE

2.5 2.7 3.6 4.0 4.5 5.0 5.0

3.0 3.0 3.6 4.0 4.5 5.0 5.0

TABLE C S/N 1 2 TYPE OF CONNECTION Pipe to Pipe / Pipe Fitting Pipe to Valve Connection PIPE SIZE 50mmo and below 50mmo and below

Pipe to Dry Tank

50mmo and below

Pipe to Fuel Pump

50mmo and below

Method Statement For Electrical Installation Testing Form

Objective The objective of this method statement is to describe the procedures for testing

of any general electrical installation. Preliminaries The materials delivered & installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to testing of the electrical installation, all materials are to be cleaned & properly labeled. The approved or latest revision drawing must be provided to the installation terms for installation works. Procedures

1.

Prior to testing of the electrical installation, all installation are to be installed in accordance to relevant methods of statement, manufactur installation guide, code of practice or standard. Refer to shop drawing. All test results are to be in accordance to relevant manufacturer installation guide, code of practice or standard.

2. 3.

Method Statement For Earth Pit (Double Flange) Installation

Objective The objective of this method statement is to describe the procedures for earth pit (double flange) installation. Preliminaries The materials delivered & installed is to be accordance to the relevant specifications as detailed in the approved technical submission. The approved or latest revision drawing must be provided to the installation terms for installation works. Procedures 1. To below subsoil To form position subsoil level thermo an earth the level. at weld mesh.

2.

3. 4.

To with To

conduct OC slot the

and

lean-concrete 5. 6. Waterproofing To housing engaged extend

7.

To position obstruction tube. The using circular can seal adhesive formation bed

8.

9. 10. 11.

Lean-concrete Builder Bottom The the slab seal depth SL) secure remove seal

s layer

12. 13.

To wire. To main

14.

To extend seal-housing assembly To connect inspection the PVC To the two top assemble gland adjoining layer

15.

16.

17.

To and the

ensure the earth

sealing

18.

To housing. bottom

assemble To of

19.

To assemble component rod with To To gaps during replace fit the will the

the

20. 21.

22.

Concrete

casting

Method Statement for the Procedure

Continuity and Earth Value Testing

Objective The objective of this method statement is to describe the procedures for

continuity and earth value testing Preliminaries The materials to be tested are to be in accordance to the relevant specifications as detailed in the approved technical submission. The approved or latest revision drawing must be provided to the installation teams for installation works. Procedures Continuity Test Procedures 1. 2. 3. All testing shall be done in accordance to CP 5 Appendix 6(L).

Ensure that testing points are clean and free from debris, mud, oil and water.

Using a calibrated digital ohmmeter, test all points where joints (e.g. r cable, cableclamp, thermo-welds etc) are present to ensure electrical continuity.

4.

If no electrical continuity is found, disconnect the joint and remedy the problem before reconnection and testing.

5.

Testing will be done in the presence of the contractor

Earth Value Test Procedures 1. 2. 3. 4. All testing shall be done in accordance to CP 5 Appendix 6(L). A calibrated Earth Electrode Tester shall be used. The Earth Electrode Tester test spikes shall be placed in location in accordance to the tester manual

Earth electrode value to be taken in the presence of the endorsing P.

and contractor (Test Form and layout sketches shall be submitted together before the inspection on site)

Method Statement for the Installation

Recessed Downlights

Objective The objective of this method statement is to describe the preparation, delivery and installation of Recessed Downlights

Preliminaries Prior to installation of light fitting on the required areas, all builder works including the false ceiling must be completed. The approved or latest revision drawing must be provided to the installation teams for the installation works.

Procedures 1. 2. 3. 4. Marking of downlight location on plaster ceiling. Opening of plaster ceiling according to downlight size (By Builder)

Fix 2 nos. of ceiling grid hanger to ceiling soft fit with anchor wall plug support of fitting

If battery pack exist, secure the battery pack to a unistruct as per deta drawing

5.

Connection of lighting points from conduit end box to fittings using PV

coated metal flexible conduit 6. 7.

Fix downlights onto opening and secure them with clips provided & ha Refer to shop drawing.

Method Statement for the Installatio

Surface Mounted Batten Lightings

Objective The objective of this method statement is to describe the preparation, delivery and installation of Surface Mounted Batten Lightings Preliminaries The fitting delivered and installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of light fittings, the walls or ceiling soft-fit shall be plastered and painted if required before installation of fittings. The approved or latest revision drawing must be provided to the installation teams for the installation works.

Procedures 1.

At basement, use unistruct to mount suspended batten fitting due to s constraint

2. 3.

Anchor unistruct to ceiling soft-fit using appropriate anchor bolt

Connection of lighting points from conduit end box to fittings using PV coated metal flexible conduit Fix lamps/ Fluorescent Tubes to fitting Refer to shop drawing.

4. 5.

Method Statement for the Installation Of Recessed/ Surface Mounted Exit Lights

Objective The objective of this method statement is to describe the preparation, delivery and installation of Exit Lights

Preliminaries

Prior to installation of recessed fitting on the required areas, all builder works including the false ceiling must be completed. For surface-mount type, all walls must be plastered or painted before installation of fitting. The approved or latest revision drawing must be provided to the installation teams for the installation works.

Procedures 1. 2. Fix M5 threaded rod to ceiling soft-fit for support of fitting

Fix recessed fitting to false ceiling and secure threaded rod to fitting For surface mounted Exit lights, use unistruct to support as per detail drawing

3.

Connection of lighting points from conduit end box to fittings using PV coated metal flexible conduit

4. 5. 6.

For suspended surface-mounted type, fix 2 Nos. of 20mm G.I. condui conduit end box secured onto ceiling soft-fit. Fix lamps & diffuser / louver to fitting Refer to shop drawing.

Method Statement for the Installation

Power point outlet (Surface & conceal) & Isolator (Surface Only)

Objective The objective of this method statement is to describe the preparation, delivery and installation of Power point outlet (Surface & Concealed) & Isolators (Surface only) Preliminaries The receptacles delivered and installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of receptacles, the walls or ceiling soft-fit shall be plastered and painted if required before installation of receptacles. The approved or latest revision drawing must be provided to the installation teams for the installation works. Procedures (Surface Mounted) 1. 2. 3. Install GI conduit & surface box Ensure surface box is 300/1400mm away from FFL Connection & Install Socket outlet

4. Refer to shop drawing

Procedures (Concealed) 1. 2. 3. Cut & Hack brick wall Install GI conduit & Box inside Cover the GI conduit with cement (final finishing by others)

4. 5. 6.

Ensure box is 300/1400mm away from FFL Connection & Install Socket outlet Refer to shop drawing

Procedures (Concealed in Dry Wall) 1.

Coordinate with Partition contractor, ensure one side of the partition is installed

2. 3. 4.

Install GI conduit & Box on the partition wall Ensure box is 300/1400mm away from FFL Coordinate with Partition contractor, ensure the other side of the partition is installed Connection & Install Socket outlet Refer to shop drawing

5. 6.

Method Statement for the Installation

Fireman Switch

Objective The objective of this method statement is to describe the preparation, delivery and installation of Fireman Switch

Preliminaries The fireman switch delivered and installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of receptacles, the walls or ceiling soft-fit shall be plastered and painted if required before installation of receptacles.

The approved or latest revision drawing must be provided to the installation teams for the installation works. Procedures (Surface Mounted) 1. 2. 3. 4. 5. Install GI conduit.

Install anchor bolt on the wall and secure Fireman Switch onto the bo Ensure Fireman Switch is installed at 2500mm away from FFL. Connection & Install Fireman Switch.

Refer to shop drawing . (The Fireman Switch location proposed to be FCC room / outside Retail Shops)

Method Statement for the Installation

Horn Speaker

Objective The objective of this method statement is to describe the preparation, delivery

and Horn Speaker. Preliminaries The speakers delivered and installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of horn speaker, the walls or ceiling soft-fit shall be plastered and painted if required before installation of horn speaker. The approved or latest revision drawing must be provided to the installation teams for the installation works.

Procedures 1. 2. 3. 4. Install GI conduit & conduit box Install anchor bolt on the wall and secure the speaker onto the bolt Ensure the installed speaker is installed at 2500mm away from FFL. Connection of speaker cable to the speaker

5. Refer to shop drawing

Method Statement for the Installation

Box Speaker

Objective

The objective of this method statement is to describe the preparation, delivery and Box Speaker. Preliminaries The speakers delivered and installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of horn speaker, the walls or ceiling soft-fit shall be plastered and painted if required before installation of horn speaker. The approved or latest revision drawing must be provided to the installation teams for the installation works.

Procedures 1. 2. 3. Install GI conduit & conduit box Install anchor bolt on the wall and secure the speaker onto the bolt Ensure the installed speaker is installed at 2500mm away from FFL.

4. 5.

Connection of speaker cable to the speaker Refer to shop drawing

Method Statement for the Installation

Recessed Ceiling Speaker

Objective The objective of this method statement is to describe the preparation, delivery and Recessed Speaker.

Preliminaries The speakers delivered and installed is to be accordance to the relevant specifications as detailed in the approved technical submission.

Prior to installation of light fitting on the required areas, all builder works including the false ceiling must be completed. The approved or latest revision drawing must be provided to the installation teams for the installation works. Procedures 1. 2. 3. 4. Marking of speaker location on plaster ceiling.

Opening of plaster ceiling/ceiling panel to be provided according to sp size. (By Builder)

Fix 1 nos. of ceiling grid hanger to ceiling soft fit with anchor wall plug support of speaker

Connection of speaker points from conduit end box to fittings using P coated metal flexible conduit

5. 6.

Fix speaker onto opening and secure them with clips provided & hang Refer to shop drawing

Method Statement for the Installation

Cable pulling of LT Cable & Testing Method

Objective The objective of this method statement is to describe the preparation, delivery and installation of Cable pulling of LT Cable & Testing Method

Preliminaries The cables delivered and installed is to be accordance to the relevant specifications as detailed in the approved technical submission. Prior to installation of cables, all cable support system must be checked and cleaned. Ensure all cable supports are clear of debris etc. for installation of LT cables. The approved or latest revision drawing must be provided to the installation teams for the installation works. Procedures 1. 2. 3. 4. 5. 6. Use proper cable drum s jack & stand to hold cable drum Ensure that one worker is stationed at every existing bend

Insert soft insulation in trunking, tray or ladder where sharp corner exi Arrange cable in proper order and secure them using cable ties

Labeling of cables using Yellow slotted label with cable tie on every c

Prior to testing of the LV cabling, all cables are to be cleaned & prope labeled. All conductors and cable lugs properly terminated. All cable g and shrouds fitted properly.

7.

Continuity test of protective conductors including Main & Supplement Equipotential Bonding to be conducted by the appropriate LEW.

8.

Conduct insulation resistance test on cables using calibrated insulatio

tester. All indicating lights, electronic devices should be disconnected avoid damage. Test voltage & minimum insulation resistance as per C 1998, Table 71A 9. Phase sequence test to be conducted (if applicable)

Y 4&5

MENT FOR

AL WORKS

HITACHI

CONTENTS

erground piping

Switchgears

ype Transformer e Pulling of HT Cable and Testing

/ FDB/PDB/MCC

e Ladder, Tray and Trunking on Testing Form Flange) Installation

Continuity and Earth Value Testing essed Downlights

ace Mounted Batten Lightings essed/ Surface Mounted Exit Lights er Point Outlet (Surface & Concealed)

essed Ceiling Speaker e Pulling of LT Cable and Testing

ment for Installation

round piping

Sub

Contractor duty

uPVC :

equipment, well as or all British local

aspects

of

pipeworks shall from pipes ground made plane. for bend linked the

: Sub-Contractor Installation

underground minimum the other less services than 1:6. whole

pipework 1

YS, TRUNKINGS AND CONDUITS in prevent trays each

ylon/polyethylene provided caps cable system.

stated installed a cable from Drawings WIRING Contractor on from riser the works Sub twisted approved each Drawings. wiring outlet fully the landed filled Gate minimum tray. finished

to

telephone

to

ibe the procedures for the

accordance to the relevant al submission.

HV Switchgear to be ble) are to be ready.

he complete delivery and locations.

provided to the installation

s cleared and free of debris and

ing of HV switchgear is catered at re the switchgear to be

tions shown on the working

he panel will be check in section oved drawings.

h (if applicable) follow by 1, 2,

inth (if applicable) using the

and all nuts must be properly

to be achieved. All installation board upon completion of

m is lockable at all times after the

the works inclusive of the rane and unloading of the

(PPE) for personal safety. the lifting gear equipment is

Of

chgears

ibe the procedures for the

ccordance to the relevant al submission.

LV Switchgear to be cleared

o be ready.

e complete delivery and

provided to the installation

s cleared and free of debris and

ing of LV switchgear is catered at re the switchgear to be off-loaded.

tions shown on the working

he panel will be check in section oved drawings.

h (if applicable) follow by 1, 2, 3

inth (if applicable) using the

and all nuts must be properly

to be achieved. All installation board upon completion of

m is lockable at all times after the

the works inclusive of the

rane and unloading of the

(PPE) for personal safety. the lifting gear equipment is valid.

he Installation

Of Transformers

ibe the procedures for the

s to be accordance to the d technical submission.

area for Oil Type Transformers plicable) are to be ready. and any special instructions

approved drawings.

provided to the installation

or possible damage or

s cleared and free of debris and is

ing of Oil Type Transformers d floor where the Transformer to be

tions shown on the working

the plinth (if applicable) and tighten le) using floor anchor and bolts.

equipment for alignment and gs in general.

all nuts must be properly torque

tions to the earth bar.

ection and ensure transformer s per TT or TN-S system.

atches the incoming busduct or

closure is to be achieved. All rom transformer upon completion cuum cleaned thoroughly and the

out a visual check on the conformity nections to the transformers and

ant transformer tests (E.g. winding t, winding pressure test, transformer

to energize the transformer. y will have a moderate hum. of hardware that has not been at have been improperly

f the transformer is not a normal r immediately and correct the

rts and re-conduct an insulation g to energize again.

the works inclusive of the

rane and unloading of the

(PPE) for personal safety. the lifting gear equipment is valid.

of

sting Method

ibe the preparation, delivery sting Method

ance to the relevant al submission.

stem must be checked and s etc. for installation of HT

provided to the installation

HT Insulation tester before laying

d to hold cable drum every existing bend

f HT Cable

ing to board & transformer

d label with cable tie on every cables. terminate cable

s, supports, backfilling of trenches etc. s must have been completed and

on test to HT cables c/w PE accordance to relevant manufacturer

he Installation of

C/ FDB/ DBP

ibe the preparation, delivery

ance to the relevant al submission.

oft-fit shall be plastered and

kable door before panels can

provided to the installation

DPB required to install on slap.

hor on wall

ring, washer & bolt.

chboard is in good condition and paint all relays and meters are in good that appropriate warning labels are

ts and terminals and that any safety and undamaged.

g portion mechanisms operate re that all panel doors open and close

lining and seals are in good condition

he Installation of installation

ibe the preparation, delivery

nstalled is to be accordance proved technical submission.

ceiling soft-fit shall be n of cable support.

provided to the installation

ports as hanger

ded rod & unistruct for general supports

/ trunkings/ ladders are free from burrs will be treated with a layer of of epoxy paint finishing similar to

ed at all joints.

om trunking to conduit, use junction cable supports at every 3 meter

HORIZONTAL DISTANCE (m)

ROD SIZE (mm)

M10 or equivalent M10 or equivalent M10 or equivalent M10 or equivalent M10 or equivalent M10 or equivalent M10 or equivalent

DESCRIPTION REMARK Shall be made of by means of screwed connection Shall be jointed by means of butt flange connection Shall be jointed by means of butt flange connection

0mmo and below

0mmo and below

0mmo and below

0mmo and below

Statement

esting Form

ibe the procedures for testing

ance to the relevant

al submission.

erials are to be cleaned &

provided to the installation

ation, all installation are to be ethods of statement, manufacturer

e to relevant manufacturer

Statement

e) Installation

ibe the procedures for earth

ance to the relevant al submission.

provided to the installation

Earth t the 86.05)

rod (To

in reference coordinate of bare

to with copper

connections

a COW. seal

continuity tube

shall membrane the and up the (stones, tube earth ensure to the earth

proceed

rod bottom seal concrete,

should mastic. so without casting

down

works. of tube of t re-bar length 87.278

the the housing. the ensuring and a pit tubes horizontal using

whole seal (Store earth the seal pipe should the inspection ensure by

length cap,

nut. component of rebar

(To

steel

the rod in

earth area this

rod within area)

the

the also exposed top and recessed

bottom locate earth compression must cap pit taped-up. of for the the main main-slab be face and lid

the

seal

inspection be fully pouring

ent for the Procedures

ibe the procedures for

e to the relevant specifications

provided to the installation

e to CP 5 Appendix 6(L).

nd free from debris, mud, oil and

est all points where joints (e.g. rod are present to ensure electrical

onnect the joint and remedy the

of the contractor

e to CP 5 Appendix 6(L).

hall be used.

s shall be placed in location in

he presence of the endorsing P.E

sketches shall be submitted

he Installation Of

d Downlights

ibe the preparation, delivery

reas, all builder works

provided to the installation

o downlight size (By Builder)

ling soft fit with anchor wall plug for

y pack to a unistruct as per detail

duit end box to fittings using PVC

re them with clips provided & hangers

ent for the Installation Of

d Batten Lightings

ibe the preparation, delivery

nce to the relevant

al submission.

ing soft-fit shall be plastered

provided to the installation

suspended batten fitting due to space

g appropriate anchor bolt

duit end box to fittings using PVC

he Installation

Exit Lights

ibe the preparation, delivery

red areas, all builder works

d or painted before installation

provided to the installation

or support of fitting

d secure threaded rod to fitting unistruct to support as per detail

duit end box to fittings using PVC

, fix 2 Nos. of 20mm G.I. conduits to

he Installation of

face & conceal) &

(Surface Only)

ibe the preparation, delivery oncealed) & Isolators

ccordance to the relevant

al submission.

ling soft-fit shall be plastered

provided to the installation

way from FFL

al finishing by others)

nsure one side of the partition is

nsure the other side of the

he Installation of Switch

ibe the preparation, delivery

e accordance to the relevant al submission.

ling soft-fit shall be plastered

provided to the installation

ure Fireman Switch onto the bolt. 2500mm away from FFL.

Switch location proposed to be at

he Installation Of

ibe the preparation, delivery

ordance to the relevant

al submission.

eiling soft-fit shall be plastered

provided to the installation

ure the speaker onto the bolt

ed at 2500mm away from FFL.

he Installation of

Box Speaker

ibe the preparation, delivery

ordance to the relevant al submission.

eiling soft-fit shall be plastered

provided to the installation

ure the speaker onto the bolt

ed at 2500mm away from FFL.

he Installation of

ibe the preparation, delivery

ordance to the relevant al submission.

reas, all builder works

provided to the installation

el to be provided according to speaker

ling soft fit with anchor wall plug for

nduit end box to fittings using PVC

them with clips provided & hangers

he Installation of

sting Method

ibe the preparation, delivery sting Method

ance to the relevant al submission.

stem must be checked and

bris etc. for installation of LT

provided to the installation

d to hold cable drum every existing bend

or ladder where sharp corner exist

cure them using cable ties

d label with cable tie on every cable.

ables are to be cleaned & properly s properly terminated. All cable glands

s including Main & Supplementary d by the appropriate LEW.

cables using calibrated insulation

devices should be disconnected to m insulation resistance as per CP5: (if applicable)

shall pipes, distribution

supply Telecom installation

materials Standards statutory

and obligations

the Facilities PIPEWORK

installation Authority in Building. : and Fire manholes alarm

first shall drainlines shall

manhole be be 1 and used 5 0mmo sewers.

shall as PIPEWORK

supply indicated : including

metre pipe under

below length. crossing

the

rope pipe entry where installed

of facilitate of

4-core earth

elsewhere horizontally Under or : shall Contract pair of the is complete houses, cable Pillar. engage and Drawings. telephone type telephone required the concrete clearance no floor Specification.

the shall circumstances level

where

IDF

to with Sub-Contractor

in

HV Switchgears

the the

pile-cap

and Builder wires to

punch works the

test onto

and the

under by and that both seal at the etc.) be that causing till works should below t 86.35 for be main the adhered (The the Builder engage ends housing. required

mastic grooved radial

of gland all rod that tube PVC socket allow for loose and is

seal nut

both fully tube a pit onto debris/stones

that faces). wires.

is

below the

seal

compression ring rod.

over

ring the

screwed downwards) hand and (This

ring over tighten secure

over

the the only.

is slab). by

to

with prevent

Builder

of

and

install manholes, as

all shown

workmanship or

an

acceptable and

shall of

Vi

be Nam

shall manholes shall comply when UPVC there extend and one with a

labour in

and the Sub-Contract

joints final No deep ground S culverts,

and bend

or cable debris in the

multi-strand or telephone pulling. cement.

Sub be of be

supported 300mm

Contract

shall allowed

Drawings by from the unless

open horizontal

an specified, For cable (supplied outlets run recessed haunched to

profecssional shall supply internal approved and installed or tenants individual socket shall 50mm

ub-Contractor

Of

earth

the below rod

rod

to

earth installed

value earth

Builder s works the are

works. on

seal clean

site within to the layer bottom breaks level main adjusted slab level. and slab by bottom should or

location at

and waterproofing by cutting (about

tube compression parts engage the engaged. & minimum to suitable the

to

the

re-bar

safely, the components PVC pipe concrete the seal housing are tube

The

inspection

the housing

bottom

face is

and earth

O rod

and

ring

into position

earth threaded

rod.

(This portion

is of

the

two the

screws. ingress

All of

work.

cable cable on

trays, Sub

shall regulations.

comply equivalent

in

accordance and

Singapore

be

provided from metre SS pipe 90 and upturn, 272 manholes beyond : shall

material

to Drawings.

bends level. allowed. the : type

shall Pipes pipes shall

All riser

with ends duct

or the otherwise type ceiling 'L' cable

Specification, or slab

contractor and works, Vietnam by distribution point, mounted supply uPVC

pre the the

wire wiring Telecoms.

they on and pipe

shall a install

acceptance rod and

the tube before

cast into

and the face be face leakage bottom of applied of the the

aterproofing Builder. to 172mm a

by rings until seal required) tube are at cement. covering and not pit trapped will be the and

of clean,

the thus

the

seal at

the

threaded the

earth

exposed concrete

trunkings, sealing Contract

conduits, facilities, Drawings.

with international

with Code

the

as

shown to the roadside Unplasticized encased changing MDF

on

1983 be i.e.

in from

install

the

Telecommunication

water-tight. shall In the be

be event laid

installed of in

overall of shall be pipe mounted

diameter shall

ceiling ' or tray stated brackets any and other mounted elsewhere

to all shall Sub Contractor) points be flush 1 from the

carry telephone be The

minimum

shown terminated face 5 internal

plate. pair

test casting

together of

lean-concrete. the the bottom seal tube

ensure of seal in seal paths) membrane

that the housing a housing

heavy

length below

equal main

galvanised O rings

into clean size The wall position of secure between secured

the prior of 50mm. using to

inspection no damage

pit

underground etc.

for

the

the

appropriate standard

requirements of Practice

of for

the Room/risers. drain.

Sub-Contract

PVC concrete. the horizontal

pipes

elecommunication

Pipes obstruction gradual

shall in

be straight posed gradient

laid run of

be

of plugged an

6mm

shall with approved

cable shall services more in

the

out points wirings in

the

the in an

in 0.5mm Block

the

seal is

no seal

by

to

steel from

top to the of

the the

lid to