Professional Documents
Culture Documents
Item of Work
Unit
Departmental
Quantity Rate (Rs.)
Cartage Rate
Net Rate (Rs.)
(Rs.)
Amount (Rs.)
15.58
2
BCD 2.6.1 + analysis
enclosed for additional
lift of 1.5m
3
3.1
3.2
3.3
3.4
3.5
2.16
2.16.1
2.16.2
2.16.3
Interpolated
35732.00
92.30
92.30
3298063.60
m
m
m
m
m
m
206228.82
109252.42
60443.37
35092.47
17855.29
1858.30
130.00
149.00
168.00
187.00
206.00
225.00
130.00
149.00
168.00
187.00
206.00
225.00
26809746.60
16278610.58
10154486.16
6562291.89
3678189.74
418117.50
m
m
m
m
m
67579.50
67579.50
45107.48
24199.66
9447.12
74.00
76.70
79.40
82.10
84.80
83.40
85.50
90.50
98.00
108.00
5636130.30
5778047.25
4082226.71
2371566.36
1020289.07
Page 1 of 17
S.No.
3.6
4
BCD2.19
5
BCD2.21
6
BCD2.23
Item of Work
Unit
m
m
Analysis Enclosed
a)
b)
Amount (Rs.)
75526.89
7316.69
1128.30
1128.30
8255418.80
79911.00
24607.72
41.90
43.30
41.90
43.30
3348270.90
1065514.27
1230.39
566.80
566.80
697382.78
10076.51
1775.00
1775.00
17885808.36
2061.96
12938389.14
9768979.17
m
m
Page 2 of 17
1044.08
6274.79
1017.89
2542.61
2830.40
1011.71
3842.11
S.No.
d)
9
2.26BCD
b)
c)
d)
10
Directorate of
Industries, Kanpur
10.3
5920.12
3105.49
13434.37
4376.69
42.90
42.90
42.90
42.90
42.90
42.90
42.90
42.90
253973.15
133225.52
576334.47
187760.00
NP-2
150
200
250
300
350
400
450
500
600
1000
1100
m
m
m
m
m
m
m
m
m
m
m
106027.00
8839.00
6363.00
4264.00
4659.00
3348.00
1908.00
979.00
1256.00
338.00
383.00
158.29
186.92
220.62
291.36
365.00
376.24
470.54
574.23
721.96
1910.14
2126.82
158.29
186.92
220.62
291.36
365.00
376.24
470.54
574.23
721.96
1910.14
2126.82
16783247.09
1652192.95
1403800.61
1242341.56
1700518.69
1259642.82
897799.48
562170.88
906780.00
645628.10
814570.91
NP-3
1000
1100
m
m
180.00
273.00
3360.46
3991.90
3360.46
3991.90
604882.87
1089788.40
NP-4
700
800
m
m
536.00
132.00
2494.33
2944.84
2494.33
2944.84
1336961.04
388718.55
Amount (Rs.)
4256352.82
4071315.11
a)
10.2
m
m
m
m
Unit
c)
10.1
m
m
Item of Work
Page 3 of 17
S.No.
Item of Work
1000
1200
1400
11
11.1
11.2
11.3
11.4
m
m
m
m
m
m
m
m
m
43439.00
46767.00
13054.00
2511.00
145.00
111.00
27.68
29.46
31.29
33.23
36.41
40.45
27.68
29.46
31.29
33.23
36.41
40.45
1202277.86
1377876.23
408450.29
83432.24
5279.39
4490.01
m
m
m
m
m
m
559.00
2971.00
3286.00
1472.00
548.00
111.00
36.82
39.20
41.63
44.20
48.44
53.81
36.82
39.20
41.63
44.20
48.44
53.81
20582.45
116448.43
136780.27
65066.18
26543.41
5973.20
m
m
m
m
m
m
541.00
1409.00
1523.00
1663.00
1071.00
156.00
45.96
48.93
51.96
55.18
60.46
67.17
45.96
48.93
51.96
55.18
60.46
67.17
24865.92
68938.82
79136.65
91761.74
64757.12
10479.26
m
m
m
62.00
313.00
1633.00
48.77
51.91
55.13
48.77
51.91
55.13
3023.61
16248.90
90030.74
Unit
Amount (Rs.)
2906759.08
6087649.94
13796095.24
Page 4 of 17
S.No.
11.5
11.6
11.7
11.8
11.9
11.10
11.11
Item of Work
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
350 mm dia pipe
01.50 -0 3.00 m
03.00 - 04.50 m
04.50 - 06.00 m
06.00 - 07.50 m
400 mm dia pipe
01.50 -0 3.00 m
03.00 - 04.50 m
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
450 mm dia pipe
01.50 -0 3.00 m
03.00 - 04.50 m
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
500 mm dia pipe
01.50 -0 3.00 m
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
600 mm dia pipe
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
1000 mm dia pipe
01.50 -0 3.00 m
03.00 - 04.50 m
1100 mm dia pipe
01.50 -0 3.00 m
03.00 - 04.50 m
Unit
m
m
m
Amount (Rs.)
56555.31
80898.41
11118.79
m
m
m
m
671.00
584.00
1524.00
1880.00
53.71
57.05
60.58
66.38
53.71
57.05
60.58
66.38
36042.54
33314.30
92319.70
124794.64
m
m
m
m
m
200.00
658.00
1103.00
1364.00
23.00
56.42
59.91
63.62
69.72
77.46
56.42
59.91
63.62
69.72
77.46
11283.39
39423.99
70178.12
95097.54
1781.52
m
m
m
m
m
54.00
354.00
91.00
1329.00
80.00
59.12
62.78
66.67
73.06
81.17
59.12
62.78
66.67
73.06
81.17
3192.44
22225.79
6067.18
97095.52
6493.40
m
m
m
m
206.00
169.00
518.00
86.00
62.98
71.03
77.84
86.47
62.98
71.03
77.84
86.47
12974.77
12004.26
40318.77
7436.76
m
m
m
56.00
1044.00
156.00
96.22
105.43
117.14
96.22
105.43
117.14
5388.20
110074.02
18273.30
m
m
323.00
15.00
160.43
170.38
160.43
170.38
51820.49
2555.73
m
m
360.00
23.00
193.60
205.60
193.60
205.60
69694.88
4728.80
Page 5 of 17
S.No.
12
12.1
12.2
NP-3
NP-3
13
13.1
13.2
13.3
13.4
13.5
Departmental
Quantity Rate (Rs.)
Item of Work
Unit
180.00
326.57
326.57
58781.82
273.00
363.75
363.75
99304.84
536.00
218.96
218.96
117362.80
132.00
263.20
263.20
34743.03
m
m
m
189.00
476.00
8.00
326.57
346.79
380.01
326.57
346.79
380.01
61720.91
165070.35
3040.05
m
m
m
523.00
400.00
132.00
449.18
492.20
546.83
449.18
492.20
546.83
234919.18
196881.75
72181.74
m
m
221.00
1494.00
590.65
656.20
590.65
656.20
130532.60
980359.33
Cartage Rate
Net Rate (Rs.)
(Rs.)
Amount (Rs.)
Page 6 of 17
S.No.
14
BCD Vol-1-2.28
15
BCD Vol-1-2.25
16
Detailed Estimate
Enclosed
16.1
BCD 2.6.1 + analysis
enclosed for additional
lift of 1.5m
Item of Work
Unit
cum
4.5.8
16.3
Analysed rate
16079.4
135.34
43073.07
31710.84
21632.82
11556.30
5791.45
3134.42
453.80
Cartage Rate
Net Rate (Rs.)
(Rs.)
162.46
Amount (Rs.)
297.80
4788445.32
39.000
39.00
1679849.61
130.00
149.00
168.00
187.00
206.00
225.00
130.00
149.00
168.00
187.00
206.00
225.00
4122408.83
3223290.18
1941458.40
1083001.15
645690.52
102105.00
2888.51
14716421.41
3106.76
16877981.82
KL
Departmental
Quantity Rate (Rs.)
Cum
Cum
Cum
Cum
Cum
Cum
1011.71
5094.82
1011.71
5432.66
Page 7 of 17
1876.80
2095.05
S.No.
16.4
4.5.3
16.5
6.1A
16.6
16.7
16.8
16.9
16.10
5.1.2
Item of Work
Unit
6.1.12A
5.1.2
5.29.7 c
13.18
Cum
Tonnes
Departmental
Quantity Rate (Rs.)
Amount (Rs.)
1010.47
2037.93
2830.40
3840.87
7827417.38
3422.49
52960710.31
4328.10
0.00
6707.92
3422.49
0.00
82447.97
4328.10
0.00
6747335.24
61081.96
13701338.28
129.08
10051703.07
314.79
15474.31
3107.70
975.50
1.55
3352.60
314.79
24.09
3107.70
975.50
1558.96
3352.60
81.96
224.31
61000.00
10.68
77872.79
Page 8 of 17
Cartage Rate
Net Rate (Rs.)
(Rs.)
118.40
S.No.
16.11
Market Rate
16.12
PHED 3.19A.3.1
16.13
Analysed rate
16.14
2.21.2
Departmental
Quantity Rate (Rs.)
Cartage Rate
Net Rate (Rs.)
(Rs.)
Amount (Rs.)
36639.11
195.00
195.00
7144626.72
Nos.
10682.00
1161.03
1161.03
12402122.46
Cum
32286.63
168.00
168.00
5424153.72
42951.38
8999.42
35.70
38.00
35.70
38.00
1533364.19
341977.96
36269.94
33018.82
17363.86
9199.43
3977.49
177.95
84.90
89.60
94.60
99.60
104.60
109.60
84.90
89.60
94.60
99.60
104.60
109.60
3079318.27
2958486.27
1642621.16
916263.23
416045.45
19503.32
16.15
17
Unit
a
b
c
d
e
f
Item of Work
2.17.1
2.17.2
2.17.3
Unit Estimate
Enclosed
18
18.1
RCD 15.07.2010 Item
2.6
00.00 to 01.50 m
01.50 to 03.00 m
03.00 to 04.50 m
04.50 to 06.00 m
06.00 to 07.50 m
07.50 to 09.00 m
Construction of Sewer connecting chambers as per Nos
specified drawing and as per direction of Engineer Incharge.
Demolishing of Pavements
Demolishing 150mm thick cement concrete
pavement by mechanical means using pneumatic
tools and disposal of demolished material up to a
lead of 1000 M
1089.93
5341
13910.00
14999.93
80114617.04
42830.32
826.00
826.00
35377842.75
cum
Page 9 of 17
S.No.
18.2
19
19.1
19.2
--do--
20
Approved rates
21
Approved rates
22
Unit Est Enclosed
23
Item of Work
Unit
cum
Reinstatement ofPavements
Reinstatement of demolished flexible (bituminous) Sq.M.
pavement as per drawing and RCD Bihar
specifications
Reinstatement of demolished rigid (Cement Sq.M.
concrete) pavement as per drawing and RCD Bihar
specifications
Pushing M.S. casing pipe by trenchless method by
hydraulic jacking and smooth controlled pushing
method under running traffic conditions as per N.H.
standards including carrying out survey work at the
job site for determining underground cable trenches
like telephone, power cable, water & sanitary lines
and resistivity test for finding the soil strata using
necessary equipments for completion of work,
mobilising of machineries and specialized crew at
the job site, etc. complete in all respects, including
driving in all type of soils including excavation of
Driven pit and Exit pit with proper protection at the
three sides with shoring sheets & ISMB's. Providing
and casting M.S. cutting edges for front shield and
constructing thrust bed at designated level as
directed by the Engineer In-charge.
per m
dia.
Per m
length
No
No
Page 10 of 17
Departmental
Quantity Rate (Rs.)
Cartage Rate
Net Rate (Rs.)
(Rs.)
Amount (Rs.)
57107.09
612.00
612.00
34949539.57
285535.45
1685.00
1685.00
481127239.99
285535.45
1538.00
1538.00
439153528.25
50.00
27260.00
27260.00
1363000.00
1000.00
100.00
100.00
100000.00
1000.00
833.00
833.00
833000.00
5
3
8000.00
25000.00
8000.00
25000.00
40000.00
75000.00
S.No.
24
25
Quotation Enclosed
26
Quotation Enclosed
Item of Work
Unit
m3
No.
No.
Page 11 of 17
Departmental
Quantity Rate (Rs.)
Cartage Rate
Net Rate (Rs.)
(Rs.)
Amount (Rs.)
29408.11
168.00
168.00
4940562.48
3.00
627000.00
627000.00
1881000.00
3.00
3712700.00
3712700.00
11138100.00
Analysis
Enclosed
a)
b)
c)
d)
8
BCD Vol-1-2.28
10
Analysed Rate
4.5.3
6.1.12A
5.1.2
Bricks
Local sand
Steel
C. sand (Cum)
Cement (Tonnes)
Bricks
THS
Local sand
Cum
Steel
Bricks
tonnes
Local sand
Cum
Steel
Cum
C. sand (Cum)
Cum
Cement (Tonnes)
tonnes
THS
Grannular bedding
PCC bedding 1:4:8
RCC (1:1.5:3) bedding with 0.4% r/f
RCC (1:1.5:3) bedding with 1% r/f
Filling in temporary passage /kuchcha road with local sand
including watering ramming consolidating and dressing
complete for smooth passage of traffic assuming 20%
length of sewer length will require passage strenghing.
4.5.8
C. sand (Cum)
Sewerage Network
Cement (Tonnes)
Quanitiy
Unit
Item of Work
S.No.
Consumption
m
m
m
m
1
1
1
1
cum
0.17
0.40
0.40
0.47
0.43
0.43
1.25
0.00
0.85
0.85
0.89
0.00
0.00
0.004
0.01
81.96
81.96
81.96
81.96
541.26
541.26
541.26
541.26
835.26
835.26
835.26
835.26
835.26
835.26
835.26
835.26
81.96
81.96
81.96
81.96
162.5
162.5
162.5
162.5
327.83
0
327.83 13.9332
327.83 32.784
327.83 32.784
0 1044.08
0
0
254.392
0 743.381
0
232.742 709.971
0 0.328
232.742 709.971
0 0.82
0
0
0
0
0
0
0
0
1044.1
1011.7
975.8
976.3
81.96
541.26
835.26
835.26
81.96 162.5
327.83
0 162.5
162.5
81.96
541.26
835.26
835.26
81.96 162.5
327.83 13.9332
254.392
1011.7
81.96
81.96
541.26
541.26
835.26
835.26
835.26
835.26
81.96 162.5
81.96 162.5
327.83 13.9332
327.83
0
254.392 743.381
0
0
0
0
0
0
0
0
0
0
1011.7
0.0
81.96
541.26
835.26
835.26
81.96 162.5
327.83 26.2272
240.861 743.381
1010.5
81.96
541.26
835.26
835.26
81.96 162.5
327.83
7.7862
145.058
161.9
314.8
81.96
541.26
835.26
835.26
81.96 162.5
327.83
32.784
232.742 709.971
975.5
81.96
541.26
835.26
835.26
81.96
541.26
835.26
835.26
81.96 162.5
327.83
7.7862
145.058
161.9
314.8
81.96 162.5
327.83
32.784
232.742 709.971
975.5
81.96
541.26
835.26
835.26
81.96 162.5
327.83
0 81.96
82.0
81.96
541.26
835.26
835.26
81.96 162.5
327.83 0.71715
9.96135
10.7
Nos
0.17
0.47
cum
0.17
0.47
0.89
cum
0.32
0.445
0.89
cum
0.095
0.268
0.85
0.89
0 743.381
cum
0.4
0.43
6.1.12A
cum
0.095
0.268
5.1.2
cum
0.4
0.43
0.85
5.29.7 c
1 0.00875 0.018404
0.494
0.494
0
Page 12 of 18
Unit Estimate
Enclosed
11
0.37
0.86
0.27
0.00
0.00
0.00
0.17
0.47
0.89
5.1.2
0.4
0.43
0.85
5.29.7B
M.T.
6.1.14A + 6.3 A
0.0625
0.268
13.12.4
0.0043 0.018404
13.11.4
Sqm
0.0036
0.015
4.5.8
Apron
75mm thick PCC 1:4:8 in base Apron arround the
pump house & ramp
Cum
0.17
0.47
0.89
1.14
81.96
541.26
835.26
835.26
81.96 162.5
327.83 30.1137
464.347 223.014
372.5
1089.9
81.96
541.26
835.26
835.26
81.96 162.5
327.83 13.9332
254.392
0 743.381
1011.7
81.96
541.26
835.26
835.26
81.96 162.5
327.83
32.784
232.742 709.971
975.5
81.96
541.26
835.26
835.26
81.96 162.5
327.83
0 81.96
82.0
81.96
541.26
835.26
835.26
81.96 162.5
327.83
5.1225
145.058
161.9
312.1
81.96
541.26
835.26
835.26
81.96 162.5
327.83 0.35243
9.96135
10.3
81.96
541.26
835.26
835.26
81.96 162.5
327.83 0.29506
8.1189
8.4
81.96
541.26
835.26
835.26
81.96 162.5
327.83 13.9332
254.392
0 743.381
1011.7
81.96
541.26
835.26
835.26
81.96 162.5
327.83 0.65568
6.02152 18.5845
25.3
Pumping stations
P.C.C. 1:4:8
8
12
a
b
0.494
Floor of pumphouse
13
BCD 11.4.2
Sqm
0.0128
0.0178
0.0356
81.96
541.26
835.26
835.26
81.96 162.5
327.83 1.04909
9.63443 29.7353
40.4
Unit Estimate
Rm
0.09
0.25
0.07
0.00
0.00
0.00
0.13
81.96
541.26
835.26
835.26
81.96 162.5
327.83 7.11959
133.505 55.7536
42.9
239.3
No.
0.236
0.628
0.039
0.373
0.000
0.000
0.514
81.96
541.26
835.26
835.26
81.96 162.5
327.83
19.378
168.4
871.6
Cu.M.
0.4
0.43
0.85
81.96
541.26
835.26
835.26
81.96 162.5
327.83
32.784
232.742 709.971
975.5
27
cum
RISING MAIN
6
Unit estimate
Enclosed
BCD 5.1.3
Page 13 of 18
Tonnes
MLD
MLD
1
1
81.96
541.26
835.26
835.26
81.96 162.5
327.83
81.96
81.96
541.26
541.26
835.26
835.26
835.26
835.26
81.96 162.5
81.96 162.5
327.83 1175.76
327.83 459.684
0 81.96
82.0
0
0
3657
3552
79672.0
15788.0
Septic tanks
1
Unit estimate
Enclosed
14.345
5.609
33.069
11.421
12.266
6.620
55.782
0.000
1.243
0.795
0.000
0.000
11.155
10.834
Page 14 of 18
Rs.
Rs.
Rs.
Rs.
Rs.
1008
125
125
44
200
Coarse sand
Stone Ballast
60
100
8
8
8
10
from Qiul
from Sheikhpura
Local
Local
Local
Bricks
Cement
Steel
Local sand
Kms
Kms
Kms
Kms
Kms
Kms
Table-1
Lead in
Kms (L)
1
2
3
4
5
6
7
8
9
10
16
17
17.5
18
18.5
19
19.5
20
20.5
21
7.11
6.48
5.96
5.54
5.19
4.9
4.66
4.44
4.26
4.1
20.22
31.92
41.76
50.32
57.9
64.8
71.24
77.04
82.68
88
4.04
6.38
8.35
10.06
11.58
12.96
14.25
15.41
16.54
17.6
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
Cost of
Diesel
(Rs.)
177.76
280.72
367.40
442.64
509.52
570.24
627.00
678.04
727.76
774.40
0.144
0.228
0.298
0.359
0.414
0.463
0.509
0.55
0.591
0.629
10
200
200
200
200
200
200
200
200
200
200
28.80
45.60
59.60
71.80
82.80
92.60
101.80
110.00
118.20
125.80
11
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
12
13
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1964.56
2084.32
2185.00
2272.44
2350.32
2420.84
2486.80
2546.04
2603.96
2658.20
14
276.31
321.65
366.61
410.19
452.86
494.05
533.65
573.43
611.26
648.34
Increase in
Average Cost
Cost per Km per additional
over
Km after first
pervious Km 5, 10 & 20 Kms
15
16
41.19
39.60
39.78
37.83
37.08
39.10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
21.5
22
22.5
23
23.5
24
24.5
25
25.5
26
26.5
27
27.5
28
28.5
29
29.5
30
30.5
31
3.95
3.83
3.71
3.61
3.51
3.43
3.35
3.28
3.21
3.15
3.09
3.04
2.99
2.95
2.9
2.86
2.83
2.79
2.76
2.73
92.9
97.92
102.46
107.08
111.3
115.76
119.9
124.08
127.98
132
135.78
139.76
143.54
147.6
151
154.72
158.82
162.24
166.08
169.8
18.58
19.58
20.49
21.42
22.26
23.15
23.98
24.82
25.6
26.4
27.16
27.95
28.71
29.52
30.2
30.94
31.76
32.45
33.22
33.96
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
817.52
861.52
901.56
942.48
979.44
1018.60
1055.12
1092.08
1126.40
1161.60
1195.04
1229.80
1263.24
1298.88
1328.80
1361.36
1397.44
1427.80
1461.68
1494.24
0.664
0.699
0.732
0.765
0.795
0.827
0.856
0.886
0.914
0.943
0.97
0.998
1.025
1.054
1.079
1.105
1.134
1.159
1.186
1.213
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
132.80
139.80
146.40
153.00
159.00
165.40
171.20
177.20
182.80
188.60
194.00
199.60
205.00
210.80
215.80
221.00
226.80
231.80
237.20
242.60
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
2708.32
2759.32
2805.96
2853.48
2896.44
2942.00
2984.32
3027.28
3067.20
3108.20
3147.04
3187.40
3226.24
3267.68
3302.60
3340.36
3382.24
3417.60
3456.88
3494.84
685.65
720.45
756.32
790.44
825.20
857.73
890.84
922.95
955.51
986.73
1018.46
1048.49
1079.01
1107.69
1138.83
1167.96
1195.14
1224.95
1252.49
1280.16
37.31
34.80
35.87
34.12
34.76
32.53
33.11
32.11
32.56
31.22
31.73
30.03
30.52
28.68
31.14
29.13
27.18
29.81
27.54
27.67
Table-2
S. No.
Material
Capacity
per Trip
Net
Unit
Quantity
payble
after
deduction
for
losseness
C.P. &
Over
Heads
@15%
1Km
Sand, Stone
Aggregate (upto
1 40mm size)
2 Bricks
3 Cement
4 Steel
5.4
2000
8
8
4.59 Cum
2000 nos
8 Tonnes
8 Tonnes
15%
15%
15%
15%
Beyond 5 Beyond
Kms upto 10 Kms
10Kms per upto
Km
20Kms
per Km
69.23
158.88
39.72
39.72
2Kms
80.59
184.95
46.24
46.24
3Kms
91.85
210.8
52.7
52.7
4Kms
102.77
235.86
58.96
58.96
5Kms
113.46
260.39
65.1
65.1
Beyond 20 Remarks
Kms per
additional
Kms
upto
upto 10Kms 20kms
9.8
22.48
5.62
5.62
8.48
19.46
4.86
4.86
7.35
16.87
4.22
4.22
33.84
29.34
1
2
3
4
5
6
Material
Unit
Distance
(Kms) 1Km
2Kms
3Kms
4Kms
5Kms
Beyond 5 Beyond
Kms upto 10 Kms
10Kms
upto
per Km
20Kms
per Km
Beyond 20
Kms per
additional
Kms
Net
cartage
rate (Rs.)
Coarse Sand
Cum
60
69.23
80.59
91.85
102.77
113.46
9.8
8.48
7.35
541.26
Stone Aggregate
(upto 40mm
size)
Bricks
Cement
Steel
Local sand
Cum
THS
Tonnes
Tonnes
Cum
100
8
8
8
10
69.23
158.88
39.72
39.72
69.23
80.59
184.95
46.24
46.24
80.59
91.85
210.8
52.7
52.7
91.85
102.77
235.86
58.96
58.96
102.77
113.46
260.39
65.1
65.1
113.46
9.8
22.48
5.62
5.62
9.8
8.48
19.46
4.86
4.86
8.48
7.35
16.87
4.22
4.22
7.35
835.26
327.83
81.96
81.96
162.46