You are on page 1of 17

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

Munger Sewerage Scheme


Bill Of Quantities with Rates
S.No.

SOR Ref 15 06 2011

Item of Work

Unit

Departmental
Quantity Rate (Rs.)

Cartage Rate
Net Rate (Rs.)
(Rs.)

Amount (Rs.)

(A) SEWERAGE NETWORK


1

15.58

2
BCD 2.6.1 + analysis
enclosed for additional
lift of 1.5m

3
3.1
3.2
3.3
3.4
3.5

2.16

2.16.1
2.16.2
2.16.3
Interpolated

Providing sal ballah barricading with departmental


sal ballah average 150 dia. And 2M long sal ballah
post at interval of 2.5 M C/C fixed 0.5 M average
below ground, packed with earth and Brick bats, well
watered and rammed with three rows of average
100mm dia. Sal ballah horizontal runners fixed with
iron spikes and wires, white washing one coat to
exposed surface, dismantling the barricade after
function, filling the holes, excluding carriage of sal
ballah from and to godown up to 5K.M. lead,
stacking them in countable stacks in godown
including cost of all labour and materials and taxes
all complete job as per specification and direction of
Engineer In-charge
RM

35732.00

92.30

92.30

3298063.60

Earth work in excavation below G. L. upto depth as


specified below for laying of sewers, in all kinds of
soil in trenches, including getting out of excavated
soil and disposal of surplus earth as directed within
a lead of 50 m.
(a) 0 0.00 to 01.50 m
(b) 01.50 to 03.00 m
(c) 03.00 to 04.50 m
(d) 04.50 to 06.00 m
(e) 0 6.00 to 07.50 m
(f) 07.50 to 09.00 m

m
m
m
m
m
m

206228.82
109252.42
60443.37
35092.47
17855.29
1858.30

130.00
149.00
168.00
187.00
206.00
225.00

130.00
149.00
168.00
187.00
206.00
225.00

26809746.60
16278610.58
10154486.16
6562291.89
3678189.74
418117.50

Close timbering over areas including strutting,


shoring and packing, cavities (wherever required)
etc. complete (Measurements to be taken of the face
area timbered):
Depth not exceeding 1.5 m.
Depth exceeding 1.5 m but not exceeding 3 m
Depth exceeding 3 m but not exceeding 4.5 m.
Depth exceeding 4.5 but not exceeding 6.0 mtr.
Depth exceeding 6.0 but not exceeding 7.5 mtr.

m
m
m
m
m

67579.50
67579.50
45107.48
24199.66
9447.12

74.00
76.70
79.40
82.10
84.80

83.40
85.50
90.50
98.00
108.00

5636130.30
5778047.25
4082226.71
2371566.36
1020289.07

Page 1 of 17

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

S.No.

SOR Ref 15 06 2011

3.6
4
BCD2.19

5
BCD2.21

6
BCD2.23

AOR of UPJN Vol-III


1996

Item of Work

Unit

Depth exceeding 7.5but not exceeding 9 mtr.


Planking, stuffing and packing materials for cavities
(in close timbering) if required to be left permanently
in position (Face area of timber permanently left to
be measured

m
m

Open timbering in trenches including strutting and


shoring complete (Measurements to be taken of the
face area timbered).
Depth not exceeding 1.5
Depth exceeding 1.5 but not exceeding 3 mtr.
Planking, stuffing and packing materials for cavities
(in open timbering) if required to be left permanently
in position (Face area of timber permanently left to
be measured

Analysis Enclosed

a)
b)

Amount (Rs.)

75526.89

7316.69

1128.30

1128.30

8255418.80

79911.00
24607.72

41.90
43.30

41.90
43.30

3348270.90
1065514.27

1230.39

566.80

566.80

697382.78

10076.51

1775.00

1775.00

17885808.36

2061.96

12938389.14
9768979.17

Provided all materials for driving sheet piling in


trenches upto followin depth below G.L. in sub soil
water consisting of 5 mm (thk.) M.S. sheets
75mmx75mmx10mm angle irons 150mmx150mmx
5mm M.S plate hooks and 75mmx75mmx10mm
angle iron cleats for strutting 150mm dia sal ballies
including supply of all T&P such as monkey hammer
wire rope crab winch pulley etc. complete and taking
out same.(Both side of trenches will be taken as one
side for the purpose of payment and measurements
i.e. area equal to LxD of trenches. Dismantled
material will be the property of contractor)
6.00 to 9.00 m depth

m
m

Departmental Cartage Rate


Quantity Rate (Rs.)
Net Rate (Rs.)
(Rs.)
629.39
87.50
120.00

Providing of all materials & Laying in position


following type of Bedding in accordance with
relevant IS Code,
Grannular bedding with hard crusher broken stone of
100% passing through20 mm sieve,20% to 50%
passing 10 mm
PCC bedding 1:4:8 ( with 40mm nominal size grit)

Page 2 of 17

1044.08
6274.79

1017.89

2542.61

2830.40

1011.71

3842.11

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

S.No.

d)

9
2.26BCD

b)
c)
d)

10
Directorate of
Industries, Kanpur

10.3

5920.12
3105.49
13434.37
4376.69

42.90
42.90
42.90
42.90

42.90
42.90
42.90
42.90

253973.15
133225.52
576334.47
187760.00

NP-2
150
200
250
300
350
400
450
500
600
1000
1100

m
m
m
m
m
m
m
m
m
m
m

106027.00
8839.00
6363.00
4264.00
4659.00
3348.00
1908.00
979.00
1256.00
338.00
383.00

158.29
186.92
220.62
291.36
365.00
376.24
470.54
574.23
721.96
1910.14
2126.82

158.29
186.92
220.62
291.36
365.00
376.24
470.54
574.23
721.96
1910.14
2126.82

16783247.09
1652192.95
1403800.61
1242341.56
1700518.69
1259642.82
897799.48
562170.88
906780.00
645628.10
814570.91

NP-3
1000
1100

m
m

180.00
273.00

3360.46
3991.90

3360.46
3991.90

604882.87
1089788.40

NP-4
700
800

m
m

536.00
132.00

2494.33
2944.84

2494.33
2944.84

1336961.04
388718.55

Amount (Rs.)

4256352.82
4071315.11

Filling available excavated earth (excluding rock) in


trenches, plinth, sides of foundations etc. in layers
not exceeding 20 cm in depth: consolidating each
deposited layer by ramming and watering lead
Carefully tamped backfill
Lightly tamped backfill
Lightly Compacted Back fill
Carefully Compacted Back fill

a)

10.2

m
m
m
m

Unit

RCC 1:1.5:3 bedding with 0.4 % reinforcement


RCC 1:1.5:3 bedding with 1 % reinforcement

c)

10.1

m
m

Departmental Cartage Rate


Quantity Rate (Rs.)
Net Rate (Rs.)
(Rs.)
975.82
681.69
5268.00
6243.82
976.32
464.16
7795.05
8771.36

Item of Work

SOR Ref 15 06 2011

Supply of following class and sizes of spigotted and


socketed RCC non pressure pipes confirming to IS458: 2003 ( with latest ammendment if any) complete
with rubber ring ( joint Type 2) confirming to IS 5382
: 1985 (1st revision) with latest ammendments if any,
duly ISI marked (Dia. in mm ).

Page 3 of 17

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

S.No.

Item of Work

SOR Ref 15 06 2011

1000
1200
1400
11

Analysed Rate as per


DSR Skelton

11.1

11.2

11.3

11.4

m
m
m

Departmental Cartage Rate


Quantity Rate (Rs.)
Net Rate (Rs.)
(Rs.)
673.00
4319.11
4319.11
1055.00
5770.28
5770.28
1715.00
8044.37
8044.37

m
m
m
m
m
m

43439.00
46767.00
13054.00
2511.00
145.00
111.00

27.68
29.46
31.29
33.23
36.41
40.45

27.68
29.46
31.29
33.23
36.41
40.45

1202277.86
1377876.23
408450.29
83432.24
5279.39
4490.01

m
m
m
m
m
m

559.00
2971.00
3286.00
1472.00
548.00
111.00

36.82
39.20
41.63
44.20
48.44
53.81

36.82
39.20
41.63
44.20
48.44
53.81

20582.45
116448.43
136780.27
65066.18
26543.41
5973.20

m
m
m
m
m
m

541.00
1409.00
1523.00
1663.00
1071.00
156.00

45.96
48.93
51.96
55.18
60.46
67.17

45.96
48.93
51.96
55.18
60.46
67.17

24865.92
68938.82
79136.65
91761.74
64757.12
10479.26

m
m
m

62.00
313.00
1633.00

48.77
51.91
55.13

48.77
51.91
55.13

3023.61
16248.90
90030.74

Unit

Amount (Rs.)

2906759.08
6087649.94
13796095.24

Carting of RCC Hume pipes (Class - NP2) and


specials from store to the site of work, lowering the
same into trenches in depth up to specified depth
below ground level true to alignment and jointing
with rubber ring as specified in IS-783 : 1985 with its
latest amendment, including excavation of earth
below invert level of pipe, cost of all jointing
materials, testing etc. complete but excluding of
excavation and refilling of trenches from ground level
to the invert level of pipes.
150 mm dia pipe
00.00 -0 1.50 m
01.50 -0 3.00 m
03.00 - 04.50 m
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
200 mm dia pipe
00.00 -0 1.50 m
01.50 -0 3.00 m
03.00 - 04.50 m
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
250 mm dia pipe
00.00 -0 1.50 m
01.50 -0 3.00 m
03.00 - 04.50 m
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
300 mm dia pipe
00.00 -0 1.50 m
01.50 -0 3.00 m
03.00 - 04.50 m

Page 4 of 17

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

S.No.

11.5

11.6

11.7

11.8

11.9

11.10

11.11

Item of Work

SOR Ref 15 06 2011

04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
350 mm dia pipe
01.50 -0 3.00 m
03.00 - 04.50 m
04.50 - 06.00 m
06.00 - 07.50 m
400 mm dia pipe
01.50 -0 3.00 m
03.00 - 04.50 m
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
450 mm dia pipe
01.50 -0 3.00 m
03.00 - 04.50 m
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
500 mm dia pipe
01.50 -0 3.00 m
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
600 mm dia pipe
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
1000 mm dia pipe
01.50 -0 3.00 m
03.00 - 04.50 m
1100 mm dia pipe
01.50 -0 3.00 m
03.00 - 04.50 m

Unit
m
m
m

Departmental Cartage Rate


Quantity Rate (Rs.)
Net Rate (Rs.)
(Rs.)
966.00
58.55
58.55
1261.00
64.15
64.15
156.00
71.27
71.27

Amount (Rs.)

56555.31
80898.41
11118.79

m
m
m
m

671.00
584.00
1524.00
1880.00

53.71
57.05
60.58
66.38

53.71
57.05
60.58
66.38

36042.54
33314.30
92319.70
124794.64

m
m
m
m
m

200.00
658.00
1103.00
1364.00
23.00

56.42
59.91
63.62
69.72
77.46

56.42
59.91
63.62
69.72
77.46

11283.39
39423.99
70178.12
95097.54
1781.52

m
m
m
m
m

54.00
354.00
91.00
1329.00
80.00

59.12
62.78
66.67
73.06
81.17

59.12
62.78
66.67
73.06
81.17

3192.44
22225.79
6067.18
97095.52
6493.40

m
m
m
m

206.00
169.00
518.00
86.00

62.98
71.03
77.84
86.47

62.98
71.03
77.84
86.47

12974.77
12004.26
40318.77
7436.76

m
m
m

56.00
1044.00
156.00

96.22
105.43
117.14

96.22
105.43
117.14

5388.20
110074.02
18273.30

m
m

323.00
15.00

160.43
170.38

160.43
170.38

51820.49
2555.73

m
m

360.00
23.00

193.60
205.60

193.60
205.60

69694.88
4728.80

Page 5 of 17

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

S.No.
12

Analysed Rate as per


DSR Skelton

12.1

12.2

NP-3

NP-3

13

Analysed Rate as per


DSR Skelton

13.1
13.2
13.3

13.4

13.5

Departmental
Quantity Rate (Rs.)

Item of Work

Unit

Carting of RCC Hume pipes (NP3-class) and


specials from store to the site of work, lowering the
same into trenches in depth up to specified depth
below ground level true to alignment and jointing
with rubber ring as specified in IS-783 : 1985 with its
latest amendment, including excavation of earth
below invert level of pipe, cost of all jointing
materials, testing etc. complete but excluding of
excavation and refilling of trenches from ground level
to the invert level of pipes.
1000 mm dia pipe
03.00 - 04.50 m

180.00

326.57

326.57

58781.82

1100 mm dia pipe


03.00 - 04.50 m

273.00

363.75

363.75

99304.84

536.00

218.96

218.96

117362.80

132.00

263.20

263.20

34743.03

m
m
m

189.00
476.00
8.00

326.57
346.79
380.01

326.57
346.79
380.01

61720.91
165070.35
3040.05

m
m
m

523.00
400.00
132.00

449.18
492.20
546.83

449.18
492.20
546.83

234919.18
196881.75
72181.74

m
m

221.00
1494.00

590.65
656.20

590.65
656.20

130532.60
980359.33

SOR Ref 15 06 2011

Cartage Rate
Net Rate (Rs.)
(Rs.)

Amount (Rs.)

Carting of RCC Hume pipes (Class - NP4) and


specials from store to the site of work, lowering the
same into trenches in depth up to specified depth
below ground level true to alignment and jointing
with rubber ring as specified in IS-783 : 1985 with its
latest amendment, including excavation of earth
below invert level of pipe, cost of all jointing
materials, testing etc. complete but excluding of
excavation and refilling of trenches from ground level
to the invert level of pipes.
700 mm dia pipe
07.50 - 09.00 m
800 mm dia pipe
07.50 - 09.00 m
1000 mm dia pipe
03.00 - 04.50 m
04.50 - 06.00 m
06.00 - 07.50 m
1200mm dia pipe
04.50 - 06.00 m
06.00 - 07.50 m
07.50 - 09.00 m
1400 mm dia pipe
06.00 - 07.50 m
07.50 - 09.00 m

Page 6 of 17

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

S.No.

SOR Ref 15 06 2011

14
BCD Vol-1-2.28

15
BCD Vol-1-2.25

16
Detailed Estimate
Enclosed

16.1
BCD 2.6.1 + analysis
enclosed for additional
lift of 1.5m

Item of Work

Unit

Filling in temporary passage / kuchcha road with


local
sand
including
watering,
ramming,
consolidating and dressing complete for smooth
passage of traffic assuming 20% length of sewer
length will require passage strengthening.

cum

Pumping out water caused by springs, tidal or river


seepage, broken water mains or drains and the like

4.5.8

16.3
Analysed rate

16079.4

135.34

43073.07

31710.84
21632.82
11556.30
5791.45
3134.42
453.80

Cartage Rate
Net Rate (Rs.)
(Rs.)

162.46

Amount (Rs.)

297.80

4788445.32

39.000

39.00

1679849.61

130.00
149.00
168.00
187.00
206.00
225.00

130.00
149.00
168.00
187.00
206.00
225.00

4122408.83
3223290.18
1941458.40
1083001.15
645690.52
102105.00

2888.51

14716421.41

3106.76

16877981.82

KL

Construction of Manholes (5341 Nos.) of different


Sizes & depth as specified in drawings and as der
direction of Engineer In-charge, consisting of
following items
Earth work in excavation below G. L. upto depth as
specified below for construction of Manholes, in all
kinds of soil , including getting out of excavated
soil and disposal of surplus earth as directed within
a lead of 50 m.

(a) 00.00 to 01.50 m


(b) 01.50 to 03.00 m
(c) 03.00 to 04.50 m
(d) 04.50 to 06.00 m
(e) 06.00 to 07.50 m
(f) 07.50 to 09.00 m
16.2

Departmental
Quantity Rate (Rs.)

Cum
Cum
Cum
Cum
Cum
Cum

Providing and Laying in position cement concrete of Cum


1:4:8 grade with 40mm nominal size approved stone
ballast in bedding, including supply of all materials,
labour, T and P etc. required for proper completion
of work.
Providing and Laying in position cement concrete of Cum
1:4:8 grade with 20mm nominal size approved stone
ballast in base foundation, including supply of all
materials, labour, T and P etc. required for proper
completion of work.

1011.71

5094.82

1011.71

5432.66

Page 7 of 17

1876.80

2095.05

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

S.No.

SOR Ref 15 06 2011

16.4
4.5.3

16.5
6.1A

16.6

16.7

16.8

16.9

16.10

5.1.2

Item of Work

Unit

Providing and Laying in position cement concrete of Cum


1:2:4 grade with 20mm nominal size approved stone
ballast , including supply of all materials, labour, T
and P etc. required for proper completion of work.
Brickwork with bricks of class designation of 100A in Cum
1:4 cement and coarse sand mortar in foundation
and plinth including supply of all material, labour,
T&P required for proper completion of work.
Providing and laying in position specified grade of
Cum
reinforced cement concrete (1:1.5:3) in working
plateform excluding the cost of centring, shuttering,
finishing and reinforcement-All work puto plinth
level

6.1.12A

Brickwork with class designation of 100A in 1:4


Cum
cement and coarse sand mortar in arching including
supply of all material, labour, T&P required for
proper completion of work.

5.1.2

5.29.7 c

13.18

Providing and laying in position specified grade of


reinforced cement concrete (1:1.5:3) in slab of
Manhole excluding the cost of centring, shuttering,
finishing and reinforcement-All work puto plinth
level

Cum

Reinforcement for R.C.C. work including


straightening, cutting, bending, placing in position
and binding all complete.

Tonnes

Departmental
Quantity Rate (Rs.)

Amount (Rs.)

1010.47

2037.93

2830.40

3840.87

7827417.38

3422.49

52960710.31

4328.10
0.00

6707.92

3422.49
0.00

82447.97

4328.10
0.00

6747335.24

61081.96

13701338.28

129.08

10051703.07

314.79

15474.31

3107.70
975.50

1.55

3352.60
314.79

24.09

3107.70
975.50

1558.96

3352.60
81.96

224.31

61000.00

15 mm thick cement plaster 1:3 (1 cement: 3 coarse Sqm.


sand ) finished with a floating coat of neat cement
on the rough side of single or half brick wall.
including supply of all materials, labour, T&P etc.
required for proper completion of the work with
neat cement.

10.68

77872.79

Page 8 of 17

Cartage Rate
Net Rate (Rs.)
(Rs.)

118.40

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

S.No.

16.11

Market Rate

16.12
PHED 3.19A.3.1

16.13

Analysed rate

16.14

2.21.2

Departmental
Quantity Rate (Rs.)

Cartage Rate
Net Rate (Rs.)
(Rs.)

Amount (Rs.)

Providing and fixing CI foot-steps in proper position Nos.


as per direction of the Engineer incharge.

36639.11

195.00

195.00

7144626.72

Supply and fixing of heavy pattern 60x60cm


manhole cover complete as per Bihar PHED
Specifications.

Nos.
10682.00

1161.03

1161.03

12402122.46

Disposal of excavated surplus earth by mechanical


means upto 5 Kms lead.

Cum
32286.63

168.00

168.00

5424153.72

42951.38
8999.42

35.70
38.00

35.70
38.00

1533364.19
341977.96

36269.94
33018.82
17363.86
9199.43
3977.49
177.95

84.90
89.60
94.60
99.60
104.60
109.60

84.90
89.60
94.60
99.60
104.60
109.60

3079318.27
2958486.27
1642621.16
916263.23
416045.45
19503.32

Depth not exceeding 1.5 m


Depth exceeding 1.5 m but not exceeding 3 m
Close timbering in case of shafts, wells, cesspits,
manholes and the like including strutting, shoring
and packing cavities (wherever required) complete
(Measurements to.be taken of the face area
timbered):

16.15

17

Unit

Open timbering in case of shafts, wells, cesspits,


manholes and the like including strutting and
shoring complete (measurements to be taken of the
face area timbered)
2.21.1

a
b
c
d
e
f

Item of Work

SOR Ref 15 06 2011

2.17.1
2.17.2
2.17.3

Unit Estimate
Enclosed

18
18.1
RCD 15.07.2010 Item
2.6

00.00 to 01.50 m
01.50 to 03.00 m
03.00 to 04.50 m
04.50 to 06.00 m
06.00 to 07.50 m
07.50 to 09.00 m
Construction of Sewer connecting chambers as per Nos
specified drawing and as per direction of Engineer Incharge.
Demolishing of Pavements
Demolishing 150mm thick cement concrete
pavement by mechanical means using pneumatic
tools and disposal of demolished material up to a
lead of 1000 M

1089.93
5341

13910.00

14999.93

80114617.04

42830.32

826.00

826.00

35377842.75

cum

Page 9 of 17

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

S.No.
18.2

19
19.1

SOR Ref 15 06 2011


RCD 15.07.2010 Item
2.5(i) A=B

Analysis as per RCD


2010

19.2
--do--

20

Approved rates

21
Approved rates

22
Unit Est Enclosed

23

Unit Est Enclosed

Item of Work

Unit

Dismantling of flexible pavement and disposal of


dismantled material up to a lead of 1000 M
(assuming 200 mm thick pavement)

cum

Reinstatement ofPavements
Reinstatement of demolished flexible (bituminous) Sq.M.
pavement as per drawing and RCD Bihar
specifications
Reinstatement of demolished rigid (Cement Sq.M.
concrete) pavement as per drawing and RCD Bihar
specifications
Pushing M.S. casing pipe by trenchless method by
hydraulic jacking and smooth controlled pushing
method under running traffic conditions as per N.H.
standards including carrying out survey work at the
job site for determining underground cable trenches
like telephone, power cable, water & sanitary lines
and resistivity test for finding the soil strata using
necessary equipments for completion of work,
mobilising of machineries and specialized crew at
the job site, etc. complete in all respects, including
driving in all type of soils including excavation of
Driven pit and Exit pit with proper protection at the
three sides with shoring sheets & ISMB's. Providing
and casting M.S. cutting edges for front shield and
constructing thrust bed at designated level as
directed by the Engineer In-charge.

per m
dia.
Per m
length

Provision for shifting and reinstatement of electric


and telephone cable etc. during excavation and
laying of sewer lines.

Temporary shifting of existing water supply mains


falling in the alignment of sewer during excavation
and the restoring utilities / services to its original
condition.

Crossing of drains falling in the alignment of sewer


lines.
( a ) Small Drains
( b ) Large Drains

No
No

Page 10 of 17

Departmental
Quantity Rate (Rs.)

Cartage Rate
Net Rate (Rs.)
(Rs.)

Amount (Rs.)

57107.09

612.00

612.00

34949539.57

285535.45

1685.00

1685.00

481127239.99

285535.45

1538.00

1538.00

439153528.25

50.00

27260.00

27260.00

1363000.00

1000.00

100.00

100.00

100000.00

1000.00

833.00

833.00

833000.00

5
3

8000.00
25000.00

8000.00
25000.00

40000.00
75000.00

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

S.No.
24

SOR Ref 15 06 2011


Analysed rates

25
Quotation Enclosed

26
Quotation Enclosed

Item of Work

Unit

Disposal of excavated surplus earth by mechanical


means upto 5 Kms lead.

m3

Supply of Water Tankers (3000 litres capacity) with


Tractor ( Eicher or equivalent make) with water filling
arrangement for flushing of sewers as per
requirement.

No.

Supply of truck mounted combined high pressure


jetting and sewage suction machine of standard
make with Truck chasis of 16 Tonnes GVW with two
seaters driver's cabin and side PTO BS-III, including
all taxes and transportation upto work site.

No.

Page 11 of 17

Departmental
Quantity Rate (Rs.)

Cartage Rate
Net Rate (Rs.)
(Rs.)

Amount (Rs.)

29408.11

168.00

168.00

4940562.48

3.00

627000.00

627000.00

1881000.00

3.00

3712700.00

3712700.00

11138100.00

Munger SEW BOQ 2011 07 15 D R Singh: BOQ

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

Munger Sewerage Scheme


Analysis of rate for cartage of materials

Analysis
Enclosed

a)
b)
c)
d)

8
BCD Vol-1-2.28

10

Analysed Rate

4.5.3

6.1.12A

5.1.2

Net Cartage rate (Rs.)

Bricks

Local sand

Steel

Grit (Cum) (40mm)

Grit (Cum) (20mm)

C. sand (Cum)

Cement (Tonnes)

Bricks

THS

Local sand

Cum

Steel

Bricks

tonnes

Grit (Cum) (40mm)

Local sand

Cum

Grit (Cum) (20mm)

Steel

Cum

C. sand (Cum)

Grit (Cum) (40mm)

Cum

Cement (Tonnes)

Grit (Cum) (20mm)

tonnes

Materialwise Cost of Cartage

THS

Bedding, with hard crushed broken stone of 100% passing


through 20 mm sieve, 20% to 50% passing 10 mm

Grannular bedding
PCC bedding 1:4:8
RCC (1:1.5:3) bedding with 0.4% r/f
RCC (1:1.5:3) bedding with 1% r/f
Filling in temporary passage /kuchcha road with local sand
including watering ramming consolidating and dressing
complete for smooth passage of traffic assuming 20%
length of sewer length will require passage strenghing.

MANHOLE of Various Dia & depth

4.5.8

C. sand (Cum)

Sewerage Network

Rate of Cartage including loading & un-loading

Cement (Tonnes)

Quanitiy

Unit

Item of Work

S.No.

SOR Ref 15 06 2011

Consumption

m
m
m
m

1
1
1
1

cum

0.17
0.40
0.40

0.47
0.43
0.43

1.25
0.00
0.85
0.85

0.89
0.00
0.00

0.004
0.01

81.96
81.96
81.96
81.96

541.26
541.26
541.26
541.26

835.26
835.26
835.26
835.26

835.26
835.26
835.26
835.26

81.96
81.96
81.96
81.96

162.5
162.5
162.5
162.5

327.83
0
327.83 13.9332
327.83 32.784
327.83 32.784

0 1044.08
0
0
254.392
0 743.381
0
232.742 709.971
0 0.328
232.742 709.971
0 0.82

0
0
0
0

0
0
0
0

1044.1
1011.7
975.8
976.3

81.96

541.26

835.26

835.26

81.96 162.5

327.83

0 162.5

162.5

81.96

541.26

835.26

835.26

81.96 162.5

327.83 13.9332

254.392

1011.7

81.96
81.96

541.26
541.26

835.26
835.26

835.26
835.26

81.96 162.5
81.96 162.5

327.83 13.9332
327.83
0

254.392 743.381
0
0

0
0

0
0

0
0

0
0

1011.7
0.0

81.96

541.26

835.26

835.26

81.96 162.5

327.83 26.2272

240.861 743.381

1010.5

81.96

541.26

835.26

835.26

81.96 162.5

327.83

7.7862

145.058

161.9

314.8

81.96

541.26

835.26

835.26

81.96 162.5

327.83

32.784

232.742 709.971

975.5

81.96

541.26

835.26

835.26

81.96

541.26

835.26

835.26

81.96 162.5

327.83

7.7862

145.058

161.9

314.8

81.96 162.5

327.83

32.784

232.742 709.971

975.5

81.96

541.26

835.26

835.26

81.96 162.5

327.83

0 81.96

82.0

81.96

541.26

835.26

835.26

81.96 162.5

327.83 0.71715

9.96135

10.7

Nos

P.C.C. soling with 40mm gauge approved stone


ballast coarse sand cement in proportion of 8:4:1
including supply of all materials, labour, T and P etc.
required for proper completion of work.
cum

0.17

0.47

cum

0.17

0.47

0.89

cum

0.32

0.445

0.89

1st class brick work in 1:4 cement and coarse sand


mortar in foundation and plinth including supply of
all material, labour, T&P required for proper
completion of work.

cum

0.095

0.268

0.85

0.89

0 743.381

P.C.C. 1:4:8 with cement coarse sand and approved


stone ballast of 20mm gauge including supply of all
materials, labour, T&P etc. required for proper
completion of the work.

P.C.C. 1:2:4 with cement coarse sand and approved


stone ballast of 20mm gauge including supply of all
materials, labour, T&P etc. required for proper
completion of the work.

Working Platform in RCC- M 20 of 10 mm thick

cum

0.4

0.43

6.1.12A

Brick arching in 1:4

cum

0.095

0.268

5.1.2

R.C.C. Work in M 20 in slab of manhole

cum

0.4

0.43

0.85

5.29.7 c

M.S. or iron work


Tonnes

15mm thickPlaster 1:3 cement and coarse sand


mortar including supply of all materials, labour, T&P
etc. required for proper completion of the work with
Sqm
neat cement.

1 0.00875 0.018404

0.494

0.494

0
Page 12 of 18

Munger SEW BOQ 2011 07 15 D R Singh: cartage calculation

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

Unit Estimate
Enclosed

11

Construction of Sewer connecting chambers as per


enclosed unit estimate and statement of cost.
Nos

0.37

0.86

0.27

0.00

0.00

0.00

0.17

0.47

0.89

5.1.2

RCC works with cement approved coarse sand and 2


cm (3/4") gauge approved stone ballast in the
proportion 1:1.5:3 (M20) in lintels of doors and
windows excluding supply of reinforcement and its
bending the same with 24 B WG binding wire and
necessary centering and shuttering etc, and also
including supply of all materials labours and tools
and plants etc. required for proper completion of
works strength of the concrete shall not be less than
M-150.
Cum

0.4

0.43

0.85

5.29.7B

Providing reinforcement tor steel

M.T.

6.1.14A + 6.3 A

Class-150 brick work in 1:6 cement and fine sand of


1.25 fineness modulous mortar in foundation and
plinth including supply of all materials, labour and
tools and plants etc. required for proper completion
of the work.
Cum

0.0625

0.268

13.12.4

Providing 15mm thick plaster with C/S in (1:6) inside


the Pump House
Sqm

0.0043 0.018404

13.11.4

Providing 12mm thick plaster with C/S in (1:6)


outside the Pump House

Sqm

0.0036

0.015

4.5.8

Apron
75mm thick PCC 1:4:8 in base Apron arround the
pump house & ramp

Cum

0.17

0.47

0.89

Rate worked out


on basis of BCD
11.4.2

25mm thick CC flooring 1:2:4 finishrd with a floating


coat of neat cement including cement slurry.
Sqm

0.008 0.011125 0.02225

1.14

81.96

541.26

835.26

835.26

81.96 162.5

327.83 30.1137

464.347 223.014

372.5

1089.9

81.96

541.26

835.26

835.26

81.96 162.5

327.83 13.9332

254.392

0 743.381

1011.7

81.96

541.26

835.26

835.26

81.96 162.5

327.83

32.784

232.742 709.971

975.5

81.96

541.26

835.26

835.26

81.96 162.5

327.83

0 81.96

82.0

81.96

541.26

835.26

835.26

81.96 162.5

327.83

5.1225

145.058

161.9

312.1

81.96

541.26

835.26

835.26

81.96 162.5

327.83 0.35243

9.96135

10.3

81.96

541.26

835.26

835.26

81.96 162.5

327.83 0.29506

8.1189

8.4

81.96

541.26

835.26

835.26

81.96 162.5

327.83 13.9332

254.392

0 743.381

1011.7

81.96

541.26

835.26

835.26

81.96 162.5

327.83 0.65568

6.02152 18.5845

25.3

Pumping stations

P.C.C. 1:4:8

8
12
a
b

0.494

Floor of pumphouse

13

BCD 11.4.2

PCC 1:2:4 , 40mm thick with( 20mm nominal size


aggregate) for inside flooring of Pump House

Sqm

0.0128

0.0178

0.0356

81.96

541.26

835.26

835.26

81.96 162.5

327.83 1.04909

9.63443 29.7353

40.4

Unit Estimate

Providing boundary wall all around the pumping


station site

Rm

0.09

0.25

0.07

0.00

0.00

0.00

0.13

81.96

541.26

835.26

835.26

81.96 162.5

327.83 7.11959

133.505 55.7536

42.9

239.3

No.

0.236

0.628

0.039

0.373

0.000

0.000

0.514

81.96

541.26

835.26

835.26

81.96 162.5

327.83

19.378

339.899 32.1887 311.728

168.4

871.6

Cu.M.

0.4

0.43

0.85

81.96

541.26

835.26

835.26

81.96 162.5

327.83

32.784

232.742 709.971

975.5

27

cum

RISING MAIN
6

Unit estimate
Enclosed

BCD 5.1.3

Supply of all matrials, labour, T&P and constructing


masonary type sluice valve/air valve chamber

RCC works in thrust block with cement approved


coarse sand and 2 cm (3/4") gauge approved stone
ballast in the proportion 1:2:4 (1 cement : 6
aggregate) in lintels of doors and windows excluding
supply of reinforcement and its bending the same
with 24 B WG binding wire and necessary centering
and shuttering etc, and also including supply of all
materials labours and tools and plants etc. required
for proper completion of works strength of the
concrete shall not be less than M-150.

Page 13 of 18

Munger SEW BOQ 2011 07 15 D R Singh: cartage calculation

DPR OF SEWERAGE SCHEME OF MUNGER TOWN OF BIHAR

BCD 5.29.7( Providing reinforcement Tor Steel including bending,


tieng etc.
A)

Tonnes

MLD
MLD

1
1

81.96

541.26

835.26

835.26

81.96 162.5

327.83

81.96
81.96

541.26
541.26

835.26
835.26

835.26
835.26

81.96 162.5
81.96 162.5

327.83 1175.76
327.83 459.684

0 81.96

82.0

17899.1 10245.6 46592.4 101.8


6181.87 5529.07
0 65.13

0
0

3657
3552

79672.0
15788.0

Septic tanks
1
Unit estimate
Enclosed

Construction of Septic tank with Dispersion Trench /


Soak Pits, connecting chamber and all appurtenant
works, site development works etc.
0.03 MLD
0.02 MLD

14.345
5.609

33.069
11.421

12.266
6.620

55.782
0.000

1.243
0.795

0.000
0.000

11.155
10.834

Page 14 of 18

Munger SEW BOQ 2011 07 15 D R Singh: cartage calculation

Analysis of Rate for Carriage of Materials


(As per Skelton and Rates of BCD 15.06.2011)
By Mechanical Transport including loading, un-loading and stacking
1
2
3
4
5

Hire Charges of Truck per day


Beldar per day
Coolie per Day
Diesel per litre
Mobil Oil per Litres

Rs.
Rs.
Rs.
Rs.
Rs.

1008
125
125
44
200

Coarse sand
Stone Ballast

60
100
8
8
8
10

from Qiul
from Sheikhpura
Local
Local
Local

Bricks
Cement
Steel
Local sand

Kms

Kms
Kms
Kms
Kms
Kms

Table-1
Lead in
Kms (L)

Average Speed No. of


No of
Diesel
Per liter
(S) Km/hr
Trips in Kms done (litres)
cost of
Kms [N= in 1 day consume Diesel
8 / {(2L / ( 2NL+6) d @
(Rs.)
S) + 1}]
5Kms /
litres

1
2
3
4
5
6
7
8
9
10

16
17
17.5
18
18.5
19
19.5
20
20.5
21

7.11
6.48
5.96
5.54
5.19
4.9
4.66
4.44
4.26
4.1

20.22
31.92
41.76
50.32
57.9
64.8
71.24
77.04
82.68
88

4.04
6.38
8.35
10.06
11.58
12.96
14.25
15.41
16.54
17.6

44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00

Cost of
Diesel
(Rs.)

177.76
280.72
367.40
442.64
509.52
570.24
627.00
678.04
727.76
774.40

Mobil Oil Per liter Cost of Cost of 6 Hire


Total
Cost per
(litres)
cost of
Mobil Oil nos
Charges of Cost
Trip (Rs.)
consume Mobil Oil (Rs.)
13/3
beldars Truck (Rs.) (Rs.)
(7+10+11+1
d@
(Rs.)
(Rs.)
2)
140Kms /
litres
8

0.144
0.228
0.298
0.359
0.414
0.463
0.509
0.55
0.591
0.629

10

200
200
200
200
200
200
200
200
200
200

28.80
45.60
59.60
71.80
82.80
92.60
101.80
110.00
118.20
125.80

11

750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00

12

13

1008
1008
1008
1008
1008
1008
1008
1008
1008
1008

1964.56
2084.32
2185.00
2272.44
2350.32
2420.84
2486.80
2546.04
2603.96
2658.20

14

276.31
321.65
366.61
410.19
452.86
494.05
533.65
573.43
611.26
648.34

Increase in
Average Cost
Cost per Km per additional
over
Km after first
pervious Km 5, 10 & 20 Kms

15

16

41.19
39.60
39.78
37.83
37.08

39.10

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

21.5
22
22.5
23
23.5
24
24.5
25
25.5
26
26.5
27
27.5
28
28.5
29
29.5
30
30.5
31

3.95
3.83
3.71
3.61
3.51
3.43
3.35
3.28
3.21
3.15
3.09
3.04
2.99
2.95
2.9
2.86
2.83
2.79
2.76
2.73

92.9
97.92
102.46
107.08
111.3
115.76
119.9
124.08
127.98
132
135.78
139.76
143.54
147.6
151
154.72
158.82
162.24
166.08
169.8

18.58
19.58
20.49
21.42
22.26
23.15
23.98
24.82
25.6
26.4
27.16
27.95
28.71
29.52
30.2
30.94
31.76
32.45
33.22
33.96

44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00

817.52
861.52
901.56
942.48
979.44
1018.60
1055.12
1092.08
1126.40
1161.60
1195.04
1229.80
1263.24
1298.88
1328.80
1361.36
1397.44
1427.80
1461.68
1494.24

0.664
0.699
0.732
0.765
0.795
0.827
0.856
0.886
0.914
0.943
0.97
0.998
1.025
1.054
1.079
1.105
1.134
1.159
1.186
1.213

200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200

132.80
139.80
146.40
153.00
159.00
165.40
171.20
177.20
182.80
188.60
194.00
199.60
205.00
210.80
215.80
221.00
226.80
231.80
237.20
242.60

750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00
750.00

1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008
1008

2708.32
2759.32
2805.96
2853.48
2896.44
2942.00
2984.32
3027.28
3067.20
3108.20
3147.04
3187.40
3226.24
3267.68
3302.60
3340.36
3382.24
3417.60
3456.88
3494.84

685.65
720.45
756.32
790.44
825.20
857.73
890.84
922.95
955.51
986.73
1018.46
1048.49
1079.01
1107.69
1138.83
1167.96
1195.14
1224.95
1252.49
1280.16

37.31
34.80
35.87
34.12
34.76
32.53
33.11
32.11
32.56
31.22
31.73
30.03
30.52
28.68
31.14
29.13
27.18
29.81
27.54
27.67

Table-2
S. No.

Material

Capacity
per Trip

Net
Unit
Quantity
payble
after
deduction
for
losseness

C.P. &
Over
Heads
@15%

1Km

Sand, Stone
Aggregate (upto
1 40mm size)
2 Bricks
3 Cement
4 Steel

5.4
2000
8
8

4.59 Cum
2000 nos
8 Tonnes
8 Tonnes

15%
15%
15%
15%

Beyond 5 Beyond
Kms upto 10 Kms
10Kms per upto
Km
20Kms
per Km

Cost per Trip per Unit

69.23
158.88
39.72
39.72

2Kms

80.59
184.95
46.24
46.24

3Kms

91.85
210.8
52.7
52.7

4Kms

102.77
235.86
58.96
58.96

5Kms

113.46
260.39
65.1
65.1

Beyond 20 Remarks
Kms per
additional
Kms

upto
upto 10Kms 20kms

9.8
22.48
5.62
5.62

8.48
19.46
4.86
4.86

7.35
16.87
4.22
4.22

33.84

29.34

Table-3 ( Per Km Cartage rate for a specific distance)


Cartage Rate
S. No.

1
2
3
4
5
6

Material

Unit

Distance
(Kms) 1Km

2Kms

3Kms

4Kms

5Kms

Beyond 5 Beyond
Kms upto 10 Kms
10Kms
upto
per Km
20Kms
per Km

Beyond 20
Kms per
additional
Kms

Net
cartage
rate (Rs.)

Coarse Sand

Cum

60

69.23

80.59

91.85

102.77

113.46

9.8

8.48

7.35

541.26

Stone Aggregate
(upto 40mm
size)
Bricks
Cement
Steel
Local sand

Cum
THS
Tonnes
Tonnes
Cum

100
8
8
8
10

69.23
158.88
39.72
39.72
69.23

80.59
184.95
46.24
46.24
80.59

91.85
210.8
52.7
52.7
91.85

102.77
235.86
58.96
58.96
102.77

113.46
260.39
65.1
65.1
113.46

9.8
22.48
5.62
5.62
9.8

8.48
19.46
4.86
4.86
8.48

7.35
16.87
4.22
4.22
7.35

835.26
327.83
81.96
81.96
162.46

You might also like