Professional Documents
Culture Documents
79470
Year
Hydro Nuclear Thermal *
Dec-47 Dec-55 Mar-61 Mar-66 Mar-74 Mar-80 Mar-85 Mar-90 Mar-95 Mar-03 Sep-04 Mar-06 508 0 854 940 0 1755 1917 0 2736 4124 0 4903 6905 640 9059 11384 640 16424 14460 1095 27030 18308 1565 43417 20506 1720 57244 26910 2720 78343 29676 2720 80860 32326 3360 88601
Installed Capacity
Renewables 6190 MW
70 65 60 55
1998- 199999 00
2004- 200505 06
MS Pr kg/cm2 42
90 130 &150
1984
Under Const.
170
247
538/538
535/566
Hydro
2007-12 XI Plan 2012-17 XII Plan
Thermal
COAL OTHERS
Nuclear Total
3160 6000 68504 66000
USE OF LARGE UNIT SIZES OF 600 MW & ABOVE SUPERCRITICAL TECHNOLOGY FIRST FIVE TARGETTED FOR FINALISATION BY 31ST DEC. 2006 PIT HEAD STATIONS WOULD HAVE COAL BLOCKS ALLOCATED WITH CAPTIVE MINING
SHELL COMPANIES TO APPOINT CONSULTANTS FOR ICB BID DOCUMENT PREPARATION & EVALUATION. SELECTION OF DEVELOPER THROUGH TARIFF BASED ICB. SHELL COMPANIES THEN TO BE TRANSFERRED TO THE SUCCESSFUL BIDDER FOR PROJECT EXECUTION.
STATE GOVTS. HAVE BEEN REQUESTED BY MOP TO PROVIDE NECESSARY SUPPORT. MINISTRY OF COAL HAS AGREED IN-PRINCIPLE TO ALLOCATE COAL BLOCKS, FOR PITHEAD STATIONS. ADDITIONAL PIT HEAD SITE IN ORISSA AND COASTAL IN ANDHRA PRADESH BEING EXPLORED.
Besides Ultra Mega Power Projects Supercritical Units envisaged for following projects:1. 2. 3. 4. 5. Lara TPS,NTPC Ib Valley Daripalli, NTPC Barh TPS, NTPC Krishnapattanam More Future projects 3x800 MW 2x800 MW 2x800 MW 2x800 MW Chattisgarh Orissa Bihar AP
Parameters 247/566/592
Blr Eff 88% 86% Gross Gross HR Eff 2135 2180 40.28 % 39.45 %
88%
1880
2147 40.06 %
88%
2108 40.79 %
86%
2197 39.15 %
1855
86%
2157 39.87 %
Efficiency figures are on HHV basis and 100% load conditions 86% boiler efficiency is assumed for Indian coal and 88% for Imported coal
STEAM TURBINE
1.Alstom, France. 2.MHI, Japan. 3.Siemens, Germany. 4.Ansaldo, Italy. 5.Hitachi, Japan. 6.Toshiba, Japan. 7.GE, USA. 8.Doosan, S. Korea. 9.Chinese (SEC, Dengfong, Harbin). 10.Russian (Power Machines)
CONCLUSION
A MAJOR SHARE OF CAPACITY ADDITION EXPECTED THROUGH LARGE SUPERCRITICAL UNITS IN ULTRA MEGA PROJECTS AND OTHER 800 MW SIZE UNITS BY NTPC, APGENCO & OTHER UTILITIES. HIGHER STEAM PARAMETERS IN SUPERCRITICAL UNITS PREFERRED FOR BETTER EFFICIENCY. FOR OVERALL ECONOMICS, PITHEAD STATIONS CAN BE INTEGRATED WITH COAL WASHING AND CFBC UNIT TO USE WASHERY REJECTS. DESIRABLE TO HAVE TECHNOLOGY TRANSFER WITH INDIGENOUS MANUFACTURING CAPACITY BUILDING TO MEET THE PROJECTED CAPACITY ADDITION TARGETS WITH ADEQUATE COMPETITION.