Presentation on Ultra Mega & Super Critical Projects Organized By FICCI & MOP May 2006

GROWTH OF INSTALLED GENERATING CAPACITY (MW)


124287 107973 113256

Hydro Nuclear Thermal *


28448 16604 2695 1362 4653 9027 42585 63290

79470

Year
Hydro Nuclear Thermal *

Dec-47 Dec-55 Mar-61 Mar-66 Mar-74 Mar-80 Mar-85 Mar-90 Mar-95 Mar-03 Sep-04 Mar-06 508 0 854 940 0 1755 1917 0 2736 4124 0 4903 6905 640 9059 11384 640 16424 14460 1095 27030 18308 1565 43417 20506 1720 57244 26910 2720 78343 29676 2720 80860 32326 3360 88601

* - Includes Wind Capacity

Installed Capacity
Renewables 6190 MW

Nuclear 3360 MW Hydro 32325.77 MW (26%)

Thermal 82410.54 MW (66%) (Coal 68518)

Thermal Hydro Nuclear Renewables

Plant Load Factor Of Thermal Stations


80 75
PLF % --->
72.34 67.47 64.56 68.74 69.97 72.96 74.82 73.6

70 65 60 55

1998- 199999 00

2000- 2001- 2002- 200301 02 03 04

2004- 200505 06

PLF - Some Highlights

500 MW Group 250 MW Group Central Sector

>84 % >90 % >82%

Growth In Unit Size/Parameters


Unit Size (MW) Yr of Introduction 1950
1970 1977 & 1983

MS Pr kg/cm2 42
90 130 &150

MS /RH Temp (o C) 455


535 535/535

< 30 100 210 500 660

1984
Under Const.

170
247

538/538
535/566

Capacity Addition Targets


Figs in MW

Hydro
2007-12 XI Plan 2012-17 XII Plan

Thermal
COAL OTHERS

Nuclear Total
3160 6000 68504 66000

18781 40220 6343 20000 30000 10000

Drivers For Ultra Mega Power Projects


LARGE CAPACITY ADDITION PLANNED OVER
NEXT DECADE IN 11TH PLAN BEYOND PACE OF THERMAL CAPACITY ADDITION TO INCREASE FROM ~ 5000 MW/Yr TO ~ 10,000 MW/Yr ADVANCED PROVEN TECHNOLOGY WITH HIGH EFFICIENCY FOR OPTIMAL USE OF RESOURCES HIGHER EFFICIENCY ECOFRIENDLY POWER GENERATION ECONOMY OF SCALE OPERATIONAL FLEXIBILITY( Faster Start Up, Load Cycling)

Concept Of Ultra Mega Power Project


A FEW PRE-IDENTIFIED PROJECTS EACH WITH A CAPACITY OF ABOUT 4000 MW ENVISAGED ABOUT 7 NOS. AT PRESENT
SASAN, MP AKALTARA, CHATTISGARH MUNDRA, GUJARAT GIRYE, MAHARASTHRA TADRI, KARNATAKA ORISSA PITHEAD ANDHRA PRADESH - COASTAL PIT HEAD

COASTAL UNDER CONSIDERATION

USE OF LARGE UNIT SIZES OF 600 MW & ABOVE SUPERCRITICAL TECHNOLOGY FIRST FIVE TARGETTED FOR FINALISATION BY 31ST DEC. 2006 PIT HEAD STATIONS WOULD HAVE COAL BLOCKS ALLOCATED WITH CAPTIVE MINING

Road Map For Implementation Of Ultra Mega Power Projects


POTENTIAL SITES IDENTIFICATION AND SELECTION BY CEA THROUGH SATELLITE IMAGING, VISITS AND INTEGRATION WITH STATE AND LOCAL AGENCIES. SEPARATE SPV FOR EACH PROJECT FOR PROJECT DEVELOPMENT.

PFC IDENTIFIED AS NODAL AGENCY FOR SETTING UP OF SHELL COMPANIES.


-------- CONTD.

SHELL COMPANIES TO TAKE FOLLOWING ACTION


- PREPARATION OF PROJECT REPORT - INITIAL LAND ACQUISITION - COAL LINKAGES/COAL BLOCKS ALLOCATIONS FOR PIT HEAD PROJECTS - ALLOCATION OF WATER

SHELL COMPANIES TO APPOINT CONSULTANTS FOR ICB BID DOCUMENT PREPARATION & EVALUATION. SELECTION OF DEVELOPER THROUGH TARIFF BASED ICB. SHELL COMPANIES THEN TO BE TRANSFERRED TO THE SUCCESSFUL BIDDER FOR PROJECT EXECUTION.

Formation Of Shell Companies


FIVE SPV (SHELL COMPANIES) FORMED ARE : 1. SASAN POWER LIMITED (M.P.) 2. COASTAL GUJARAT POWER LIMITED (MUNDRA PORT) 3. COASTAL MAHARASHTRA MEGA POWER LIMITED. 4. COASTAL KARNATAKA POWER LIMITED. 5. AKALTARA POWER LIMITED (CHATTISGARH)

STATE GOVTS. HAVE BEEN REQUESTED BY MOP TO PROVIDE NECESSARY SUPPORT. MINISTRY OF COAL HAS AGREED IN-PRINCIPLE TO ALLOCATE COAL BLOCKS, FOR PITHEAD STATIONS. ADDITIONAL PIT HEAD SITE IN ORISSA AND COASTAL IN ANDHRA PRADESH BEING EXPLORED.

Current Status Of Ultra Mega Projects.


FIVE SHELL COMPANIES FORMED. EOI ISSUED FOR SADAV, MUNDRA, GIRYE & TADRI. TECHNICAL CONSULTANTS APPOINTED BY SHELL COS. FOR PREPARATION OF PROJECT REPORTS. CONSULTANT APPOINTED FOR BID DOCUMENTS AND BIDDING PROCESS. POWER ALLOCATION/POWER PURCHASE AGREEMENTS ARE BEING FINALISED.

Use Of Super Critical Technology


Supercritical Technology is widely established and accepted with more than 500 units in operation. Widely prevalent cycle parameters: Pressure: 246 -250 kg/cm2 Temperature: 538/538 deg C 538/566 deg C (Sipat & Barh TPS) 566/593 deg C (Mainly in Japan & Germany) 593/593 or 600/600 deg C Preferred steam parameters include higher steam temp. of 566 to 593 deg C depending upon site specific techno-economics. BHEL collaboration includes these parameters.
Contd.

Besides Ultra Mega Power Projects Supercritical Units envisaged for following projects:1. 2. 3. 4. 5. Lara TPS,NTPC Ib Valley Daripalli, NTPC Barh TPS, NTPC Krishnapattanam More Future projects 3x800 MW 2x800 MW 2x800 MW 2x800 MW Chattisgarh Orissa Bihar AP

Expected Efficiency Range


Parameters 247/535/566@
Tur. HR Case-I Turbine Heat Rate =1904 as Quoted for 660 MW & parameters at @ Case-II Turbine Heat Rate =1880 as per BHEL for 660 MW & parameters at @ Blr Eff 88% 1904 86% Gross Gross HR Eff 2164 2214 39.75 % 38.84 % 1879 Tur. HR

Parameters 247/566/592
Blr Eff 88% 86% Gross Gross HR Eff 2135 2180 40.28 % 39.45 %

88%
1880

2147 40.06 %

88%

2108 40.79 %

86%

2197 39.15 %

1855

86%

2157 39.87 %

Efficiency figures are on HHV basis and 100% load conditions 86% boiler efficiency is assumed for Indian coal and 88% for Imported coal

List Of Foreign Suppliers For Supercritical Units


BOILER
1.Alstom, France. 2.MHI, Japan. 3.IHI, Japan. 4.Hitachi-Babcock, Japan. 5.Ansaldo, Italy. 6.TKZ, Russia. 7.Doosan, S. Korea. 8.Foster Wheeler, US. 9.Babcock & Wilcox, US. 10.Chinese (SEC, Dengfong, Harbin).

STEAM TURBINE
1.Alstom, France. 2.MHI, Japan. 3.Siemens, Germany. 4.Ansaldo, Italy. 5.Hitachi, Japan. 6.Toshiba, Japan. 7.GE, USA. 8.Doosan, S. Korea. 9.Chinese (SEC, Dengfong, Harbin). 10.Russian (Power Machines)

Option of using Washed Coal


Indigenous coal generally have high ash content, wide variation in calorific value, presence of extranous matter and is unsized. Considering large unit size, it is desirable to have good and consistent coal quality, free of extraneous matter with a view to Narrow down coal design range Less wear and tear of coal handling and coal pulverizers Reduced teething problems in initial stage of technology introduction Comfort in plant operation

CONCLUSION
A MAJOR SHARE OF CAPACITY ADDITION EXPECTED THROUGH LARGE SUPERCRITICAL UNITS IN ULTRA MEGA PROJECTS AND OTHER 800 MW SIZE UNITS BY NTPC, APGENCO & OTHER UTILITIES. HIGHER STEAM PARAMETERS IN SUPERCRITICAL UNITS PREFERRED FOR BETTER EFFICIENCY. FOR OVERALL ECONOMICS, PITHEAD STATIONS CAN BE INTEGRATED WITH COAL WASHING AND CFBC UNIT TO USE WASHERY REJECTS. DESIRABLE TO HAVE TECHNOLOGY TRANSFER WITH INDIGENOUS MANUFACTURING CAPACITY BUILDING TO MEET THE PROJECTED CAPACITY ADDITION TARGETS WITH ADEQUATE COMPETITION.