OBRA: "CONSTRUCCION DE URBANISMO PARA EL SECTOR LA MORUSCA, MUNICIPIO GARCIA DE H

UBICACIN: SECTOR LA MORUSCA, MUNICIPIO GARCIA DE HEVIA, ESTADO TAHIRA.


AO: 2012

G
R
U 3
P
O

CAVAJAL ZULIMAR C.I.V-19.506.723


PUENTE IBALDO C.I.V-18.207.983
PATIO ALBA C.I.V-15.639.475
ZAMBRANO AZAELIZ C.I.V- 19.036.111
CONTRERAS MARYURY C.I.V- 19.035.108

N PART

CODIGO Y DESCRIPCIN
H-012.340.100
LIMPIEZA DE TERRENO, APERTURA DE PICAS Y DESMONTES

H-016.400.00
NIVELACION Y REPLANTEO
H-021.130.SNO
EXCAVACION A MANO EN TERRENO PEDREGOSO O CANTO
RODADO

H-022.230.201
RELLENO EN ZANJA COMPACTADO CON EQUIPO ADECUADO A MAQUINA
CON MATERIAL SELECIONADO DE LA EXCAVACION

H-022.230.202.1
RELLENO EN ZANJA COMPACTADO CON EQUIPO ADECUADO A MAQUINA
CON MATERIAL DE PRESTAMO

H-022.260.108
SUMINISTRO Y COLOCACION DE ARENA EN APOYO
TIPO B,NO INCLUYE TRANSPORTE

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00
H-023.000.200
ACOPIO,CARGA,ACARREO Y BOTE A MAQUINA DE MATERIAL
SOBRANTE DE RELLENO
7

H-111.340.SN02
TRANSPORTE EN DISTANCIA COMPRENDIDA ENTRE 10 Y 40
KM ,PARA MAQUINARIA PESADA, MOVIMIENTO DE TIERRA
BASES,ASFALTO, PREP.DEL SITIO, DRENAJES, CON PESO
de 6 a 12 TF.POR MAQUINA, SE PAGARA SOLO UN VIAJE DE IDA Y
UNO DE REGRESO POR MAQUINA Y NO SE RECONOCERA
CUANDO UNA MAQUINA SE SUSTITUYE POR OTRA.

H-181.310.405
SUMINISTRO Y COLOCACION DE TUBERIA PVC CLASE AB
JUNTA AUTOMATICA DE 50mm (2) INCLUYE ANILLLOS DE
GOMA Y TRANSPORTE A LA OBRA.

1.00

1.00

1.00

1.00

56.00

H- 181.310. 406
SUMINISTRO Y COLOCACION DE TUBERIA PVC CLASE AB
JUNTA AUTOMATIACA DE 75 mm (3) INCLUYE ANILLLOS DE
GOMA .

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

10

1.00

H-181.310.411
SUMINISTRO Y COLOCACION DE TUBERIA PVC CLASE AB, JUNTA
AUTOMATICA 160 mm (6). INCLUYE ANILLOS DE GOMA.
11

H-181.320.304
SUMINISTRO,TRANSPORTE Y COLOCACION DE TUBERIA SCHEDULLE
80 DIM= 3/4"
1.00

12

1.00

H-181.320.304.1
SUMINISTRO, TRANSPORTE Y COLOCACION DE TUBERIA SCHEDULLE
80 DIM= 1"
1.00

1.00
1.00

13

672.00

H-181.320.301
SUMINISTRO TRANSPORTE Y COLOCACION DE TUBERIA
SCHEDULLE DE 80 DIM = A 1/2"

1.00

1.00

1.00
1.00

1.00

14

1.00

1.00

1.00

1.00

1.00

1.00

1.00

15

H-181.330.110
SUMINISTRO, TRANSPORTE Y COLOCACION DE TUBERIA DE HG ASTM
DE DIM=6"
H-181.610.405
SUMINISTRO Y COLOCACION DE CODOS PVC DE 90 DE = 50 mm
JP*JP

17

18

19

20

21

H-181.610.406
SUMINISTRO Y COLOCACION DE CODOS PVC DE 90 D: 75 mm
JP*JP .
H-181.610.411.
SUMINISTRO Y COLOCACION DE CODOS PVC DE 90 D: 160 mm
JP*JP .
H.181.740.402
SUMINSTRO,TRANSPORTE Y COLOCACION DE BASE COMPLETA PARA
MEDIDOR Y CAJA TRONCO-CONICA, INCLUYE MORTERO DE FIJACION Y
CONEXIONES DE ACUERDO A NORMAS INOS.

H-181.610.505
SUMINISTRO Y COLOCACION DE TEE DE PVC PARA AB,
NO REDUCIDA JP* DE 50* 50 mm
H-181.610.506

1.00

SUMINISTRO Y COLOCACION DE TEE DE PVC PARA AB,


NO REDUCIDA JP* DE 75*7 5 mm
H- 181.610. 511
SUMINISTRO Y COLOCACION DE TEE DE PVC PARA AB,
NO REDUCIDA JP* DE 160*160mm
H-181.611.300.5
SUMINISTRO TRANSPORTE Y COLOCACION DE ABRAZADERA
PVC DE 50 mm DERIVACION A 1/2 "3/4" , 1"
H- 181.611. 300.6
SUMINISTRO TRANSPORTE Y COLOCACION DE ABRAZADERA
PVC DE 75 mm DERIVACION A 1/2 "3/4" , 1"
H-181.611.300.8
SUMINISTRO TRANSPORTE Y COLOCACION DE ABRAZADERA
PVC DE 110 mm DERIVACION A 1/2 "3/4" , 1"
H-181.611.506
SUMINISTRO Y COLOCACION DE TAPONES HEMBRAS DE PVC JP
DE 75 mm
H- 181.611.508
SUMINISTRO Y COLOCACION DE TAPONES HEMBRAS DE PVC JP
DE 110 mm
H-181.611.806
SUMINISTRO Y COLOCACION DE REDUCCIONES DE PVC ABE*JP
DE 75*50 mm
H- 181 .611.810.1
SUMINISTRO Y COLOCACION DE REDUCCIONES DE PVC ABE*JP
DE 75*63 mm
H-181.611.908.1
SUMINISTRO Y COLOCACION DE REDUCCIONES DE PVC ABE*JP
DE 110*75 mm
H- 181.612.011.1
SUMINISTRO Y COLOCACION DE REDUCCIONES DE PVC ABE*JP
DE 160*110 mm
H-181.612.112.1
SUMINISTRO Y COLOCACION DE REDUCCIONES DE PVC ABE*JP
DE 200*160 mm
H-181.613.805
SUMINISTRO Y TRANSPORTE Y COLOCACION BRIDA ROSCADA
DIM = 2"
H-181.613.807
SUNINISTRO Y TRANSPORTE Y COLOCACION BRIDA ROSCADA
DIM = 3"
H-181.613.807
SUMINISTRO Y TRANSPORTE Y COLOCACION BRIDA ROSCADA
DIM = 4"
H- 181. 613.810
SUMINISTRO Y TRANSPORTE Y COLOCACION BRIDA ROSCADA
DIM = 6"
H- 181.613.812
SUMINISTRO Y TRANSPORTE Y COLOCACION BRIDA ROSCADA
DIM = 8"
H- 181.620.401
SUMINISTRO Y TRANSPORTE Y COLOCACION CODO DE 90
SCHEDULLE 80 DIM = 1/2"
H-181.620.404
SUMINISTRO Y TRANSPORTE Y COLOCACION CODO DE 90

SCHEDULLE 80 DIM = 3/4"


H-181.620.404.1
SUMINISTRO Y TRANSPORTE Y COLOCACION CODO DE 90
SCHEDULLE 80 DIM = 1"
H- 181.620.504
SUMINISTRO Y TRANSPORTE Y COLOCACION CODO DE 90
SCHEDULLE 80 DIM = 3/4
H-181.620.504.1
SUMINISTRO Y TRANSPORTE Y COLOCACION DE TEE NO
REDUCIDA SCHEDULLE 80 DIM = 3/4
H- 181.621.304.1
SUMINISTRO Y TRANSPORTE Y COLOCACION DE TEE NO
REDUCIDA SCHEDULLE 80 DIM = 1"

MO PARA EL SECTOR LA MORUSCA, MUNICIPIO GARCIA DE HEVIA, ESTADO TACHIRA".

MUNICIPIO GARCIA DE HEVIA, ESTADO TAHIRA.

"COMPUTOS METR
LARGO

ANCHO

ALT/ESP

MTS

768.39
445.06
692.00

241.14
2146.59
2146.59

768.39
445.06
692.00
1905.45

0.60

0.89

1017.51

187.63

0.60

0.70

78.80

7.09

0.60

0.70

2.98

29.86
29.84
29.78
29.93
24.77
21.77
21.68
187.63

Kg/ml

2.98

0.20

0.40

0.24

5.65

0.20

0.40

0.45

2.98

0.20

0.40

0.24

6.07

0.60

0.70

2.55

6.08

0.60

0.70

2.55

8.09

0.20

0.40

0.65

2.93

0.20

0.40

0.23

8.09

0.20

0.40

0.65

2.98

0.20

0.40

0.24

6.07
246.64

0.60

0.70

2.55
1109.64

1109.64

33.67

0.97

0.05

0.01

0.003

0.0003

210.95
863.99

194.98

14.14

1.44

0.21

0.15

0.03
210.95

1905.45

0.60

0.10

114.33

187.63

0.60

0.10

11.26

7.09

0.60

0.10

0.43

2.98

0.20

0.10

0.06

5.65

0.20

0.10

0.11

2.98

0.20

0.10

0.06

6.07

0.60

0.10

0.36

6.08

0.60

0.10

0.36

8.09

0.20

0.10

0.16

2.93

0.20

0.10

0.06

8.09

0.20

0.10

0.16

2.98

0.20

0.10

0.06

6.07

0.60

0.10

0.36
127.77

4.56
4.60
9.96
2.42
0.83
1.61
0.74
1.25
0.31
1.91
15.34
1.17
0.55
1.17
0.55
1.70
0.83
1.42
11.25
0.61
0.14
0.48
0.74
10.80
0.82
0.68
0.82
0.86
0.68
0.82
0.49
1.98
0.20
2.77
17.20
2.31
6.71
0.71
3.59
0.85
1.21
0.83
1.08
0.83
0.87
1.00
1.38
2.41
4.88
2.48
25.49
158.89

158.89

0.78
0.94
0.87
1.43
0.79
0.56
0.98
0.87
1.16
0.78
0.57
1.00
3.19
1.94
4.79
3.29
3.49
8.09
35.52

35.52

5.01
3.74
1.27
2.41
5.56
2.97
3.13
1.57
0.81
2.99
13.80
7.24
0.54
0.52
0.38
0.49
0.48
0.50
0.38
0.36
0.38
0.16
0.59
1.00
0.78
0.71
4.45
1.03
7.24
70.49

70.49

26.71
17.42
2.69
0.33
4.92
29.41
22.62
0.58
3.00
0.82
0.91
0.20
5.34
29.67

6.42
30.80
9.99
0.43
0.43
0.43
0.73
0.88
0.88
1.15
0.79
0.84
0.85
0.87
0.87
1.15
0.78
0.85
1.00
4.38
3.49
19.10
231.73

58.55

231.73

3278.80
3775.43

85.67
85.50
85.18
85.51
341.86

341.86

85.18
85.51
85.48
85.50
341.67

341.67

85.18
85.51
85.48
85.50
341.67

341.67

85.18
85.51
85.48
85.50
341.67

341.67

85.22
85.51
85.52
85.50
341.75

341.75

85.22
85.51
85.52
85.50

341.75

341.75

85.22
85.51
85.52
85.50
341.75

341.75

29.86
29.84
29.78
29.93
24.77
21.77
21.68
187.63

187.63

1.03
0.47
0.19
0.85
0.95
1.17
17.32
2.24
2.42
32.76
47.92
23.08
1.09
1.10
0.70
0.39
0.25
3.01
0.97
0.97
0.52
2.36
0.86
0.29
0.32
0.41
1.01
1.19
0.64
3.08
48.32
0.64
0.98
0.79
0.84
0.87
0.83
0.63
0.91
0.83
0.88
0.86
0.82
1.00
0.79
4.26
9.18
41.33

11.67
3.71
9.73
8.04
23.10
0.56
0.29
1.86
1.33
0.13
1.05
2.12
0.77
1.10
7.66
337.44

337.44
2917.19

768.39
445.06
692.00
1905.45

21.42

21.42

17.43

17.43
38.85

21.58

21.58

21.96

21.96

23.01

23.01

0.52
0.52
0.61
0.25
0.71
0.63
0.11
0.34
0.37
0.63
0.45
0.91
0.71
6.76

4542.72
4609.27

0.13
0.13
0.31
0.13
0.12
0.12
0.12
0.12
0.17
0.17
0.15
0.11
0.11
0.11
0.15
0.15
2.30

2.30

0.12
0.12
0.17
0.17
0.15
0.15
0.12
0.17
0.18
0.15
0.15
0.72
2.37

2.37

0.08
0.17
0.17
0.08
0.50

0.50

2.93

2.93

0.11
0.11
0.12
0.83
0.83
0.11
0.11
0.11
0.45
0.45
0.45
0.10
0.10
0.11
0.11
0.10
0.15
0.15
0.12
0.11
0.17
0.17
0.17

0.17
0.13
0.15
0.17
0.17
0.17
0.17
0.35
0.32
0.32
0.12
0.11
0.11
7.70

7.70

0.35
0.44
0.79

0.79

0.78
0.68
0.75
0.66
2.87

2.87

0.59
0.40
0.40
0.14
0.14
0.13
0.08
0.09
0.27
0.11
0.13
0.35
0.28
0.16
0.28
0.33
0.28
0.16
0.35
0.17
0.14
0.07
0.10
0.32
0.39
0.39
0.39
0.32
0.32
7.28

7.28

0.17
0.10
0.27

0.27

0.31
0.28
0.35
0.31
0.33
0.36
0.28

0.29
0.17
0.16
0.13
0.15
0.13
0.15
0.14
0.14
0.12
0.12
0.12
0.26
0.25
4.55

4.55

0.12
0.10
0.10
0.10
0.10
0.12
0.64

0.64

0.95
0.95
0.95
0.95
0.35
1.85
0.35
1.85
8.20

8.20
40.40

0.10

0.10

kg/m

"COMPUTOS METRICOS"
Kg
kg

km

Ton

Ton*km

m*km

PZA

UND

JGO

OBSERVACIONES
APERTURA DE PICAS Y DESMONTES
APERTURA DE PICAS Y DESMONTES= long tuberia (A+B+C) + long tuberia secundaria (acometidas)
TUBERIA PRINCIPAL
Tuberia principal A= Calle princ+carre 6+carre 5+calle 1+carre 3+carre 4+tramo21+tramo 22
Tuberia principal A= (122,42+ 93,01+ 256,91+ 146,35+ 6,94+ 6,85 +29,12+ 106,79)m= 768,39m
Tuberia principal B= calle princ+ carre4+ carre3+ carre2 + tramo 37+ tramo 38
Tuberiaprincipal B= (203,15+ 18,31+ 18,60+ 131,99 + 28,82+ 44,19)m= 445,06 m
Tuberia principal C= calle princ+ calle2 + carre 4 + carre 3 +carre 2+ carre 1 + calle 1+ tramo 62
Tuberia principal C= ( 87,83+216,47+ 17,17+ 12,42+ 11,74+ 263,95+ 63,17+ 19,25)m = 692m
TUBERIA SECUNDARIA
Tuberia secundaria= edificio+centro comerciales+casa cultural+simoncito+modulo policial+
escuela-pre escolar+liceo+mercal+casa comunal+area deportivo+capilla+centro medico asistencial
Tuberia secundaria= (182,13+7,09+2,98+5,65+2,98+6,07+6,08+8,09+8,09+2,93+2,98+6,07)m= 241,14m
APERTURAS DE PICAS Y DESMONTE= (1905,45+241,14)m= 2146,59m
NIVELACION Y REPLANTEO
NIVELACION Y REPLANTEO= DATO PROVENIENTE DE LA PARTIDA N 1=2146,59m
EXCAVACION A MANO EN TERRENO DE CANTO RODADO
excavacion= largo*ancho*prof
excavacion total = excv tub princ + excv tub secundaria
EXCAVACION TUBERIA PRINCIPALde 6"
long total de la tub prin= tub princ A + tub princ B + tub princ C
long tub principal A= calle princ + carre 6+ carre 5+ calle 1+ carre 3+ carre4+ tramo 21+ tramo 22
long tub principal A= (122,42+ 93,01+ 256,91+ 146,35+ 6,94+ 6,85 +29,12+ 106,79)m= 768,39 m
long tub principal B= calle princ+ carre4+ carre3+ carre2 + tramo 37+ tramo 38
long tub principal B= (203,15+ 18,31+ 18,60+ 131,99 + 28,82+ 44,19)m= 445,06 m
long tub principal C= calle princ+ calle2 + carre 4 + carre 3 +carre 2+ carre 1 + calle 1+ tramo 62
long tub principal C= ( 87,83+216,47+ 17,17+ 12,42+ 11,74+ 263,95+ 63,17+ 19,25)m = 692m
long total de tub principal= (768,38+ 445,06+694)m= 1905,45m
excavacion= 1905,45m*0.60m*0.89m= 1017,50m3
EXCAVACION TUBERIA SECUNDARIA
EDIFICIO 3"
TUBERIA DEL TANQUE SUBTERRANEO A LA PRINCIPAL
long. De tub.= manzanas(1, 2, 3, 4, 5, 6, 7)
long.de tub. Manzana 1= ( 7,71m+ 4,66m+ 7,72m+ 9,77m)= 29,86m3
long. De tub. Manzana 2=( 7,71m+ 4,67m+ 7,70m+ 9,76m)= 29,84m3
long. De tub. Manzana 3=( 7,72m+ 4,69m+ 7,71m+ 9,76m)= 29,78m3
long. De tub. Manzana 4=(7,74m+ 4,70m+ 7,74m+ 9,75m)= 29,93m3
long. De tub. Manzana 5=(7,66m+ 4,73m+ 4,73m+ 7,65m)= 24,77m3
long. De tub. Manzana 6=(4,69m+ 4,70m+ 7,68m+ 4,70m)= 21,77m3
long. De tub. Manzana 7=(4,70m+ 4,57m+ 7,70+ 4,71m)= 21,68m3
long total de tub manzana= 187,63m
excav tub de manz=long total *ancho*prof
excav tub de manzana= 187,63m*0,60m*0,70m=78,80 m3.
CENTRO COMERCIAL 2"
long tub del centro comercial= 7,09m
excav de tub C.C= long*ancho*prof
excav tub del C.C= 7,09m*0,60m*070 = 2,98m3.

CASA CULTURAL 1"


long tub de la casa cultural= 2,98m
excav de tub = long*ancho*prof
excav tub de casa cultural= 2,98m*0,20m*0,40m = 0,24m3
SIMONCITO 2"
long tub del simoncito= 5,65m
excav de tub = long*ancho*prof
excav tub del simoncito= 5,65m*0,20m*0,40m = 0,45m3
MODULO POLICIAL 1"
long tub del modulo policial= 2,98m
excav de tub= long*ancho*prof
excav tub del modulo policial= 2,98m*0,20m*0,40m = 0,24m3
ESCUELA - PREESCOLAR 2"
long tub de escuela-preescolar = 6,07m
excav de tub = long*ancho*prof
excav tub de escuela-preescolar= 6,07m*0,60m*0,70= 2,55m3
LICEO 3"
long tub del liceo = 6,08M
excav de tub = long*ancho*prof
excav tub del liceo= 6,08m*0,60m*0,70= 2,55m3
MERCAL 3/4"
long tub de mercal = 8,09M
excav de tub = long*ancho*prof
excav tub de mercal= 8,09m*0,20m*0,40= 0,65m3
AREA DEPORTIVA 1/2"
long tub area deportiva= 2,93m
excav de tub= long*ancho*prof
excav tub del area deportv= 2,93m,*0,20m*0,40m= 0,23 m3
CASA COMUNAL 1"
long tub del casa comunal= 8,09m
excav de tub= long*ancho*prof
excav tub del casa comunal= 8,09m*0,20m*0,40m= 0,65m3
CAPILLA 3/4"
long tub de la capilla= 2,98m
excav de tub= long*ancho*prof
excav tub de la capilla= 2,98m*0,20m*0,40m= 0,24m3
CENTRO MEDICO ASISTENCIAL 2"
long tub del centro medico asistencial= 6,07m
excav de tub= long*ancho*prof
excav tub del centro medico= 6,07m*0,60m*0,70m= 2,55m3
long total de la tuberia secundaria= 241,14m
TOTAL DE EXCAVACION= EXCAV TUBERIA PRINCIPAL+ EXCAV TUBERIA SECUNDARIA
RELLENO COMPACTADO CON MATERIAL DE LA EXCAVACION
COMPACTACION= Volumen de la excavacion- desalojos
EXCAVACION TOTAL= 1109,64m3
TUBERIA PRINCIPAL

/4**long tuberia 6"


Diametro ( m)= 1"----------->25,54mm

DESALOJO TUBERIA 6"=

6"------------->X
Diametro= 6"*25,54mm /1" = 153,24mm/1000m=0,15m
long tuberia= dato de la partida 3= 1905,45m
DESALOJO TUBERIA (6)"= /4*(0,15m)*1905,45m=33,67m3
LICEO y MANZANAS

/4**long tuberia 3"


Diametro ( m)= 1"----------->25,54mm

DESALOJO TUBERIA 3"=

3"------------->X
Diametro= 3"*25,54mm /1" = 76,62mm/1000m=0,08m
long tuberia= dato de la partida 3= 6,08m+187,63m=193,71m
DESALOJO TUBERIA 3"= /4*(0,08m)*193,71m=0,97m3
CENTRO COMERCIAL,SIMONCITO,ESCUELA-PREESCOLAR,CENTRO MEDICO ASISTENCI

/4**long tuberia "


Diametro ( m)= 1"----------->25,54mm

DESALOJO TUBERIA 2"=

2"------------->X
Diametro= 2"*25,54mm /1" = 51,08mm/1000m=0,05m
long tuberia= dato de la partida 3= 7,09m+5,65+6,07+6,07m=24,88m

DESALOJO TUBERIA 2"= /4*(0,05m)*24,88m=0,05m3


CASA CULTURAL,MODULO POLICIAL, CASA COMUNAL

/4**long tuberia 1"


Diametro ( m)= 1"----------->25,54mm

DESALOJO TUBERIA 1"=

1"------------->X
Diametro= 1"*25,54mm /1" = 25,54mm/1000m=0,03m
long tuberia= dato de la partida 3= 2,98m+2,98m+8,09m= 14,05m
DESALOJO TUBERIA 1"= /4*(0,03m)*14,05m=0,01m3
MERCAL Y CAPILLA

/4**long tuberia 3/4"


Diametro ( m)= 1"----------->25,54mm

DESALOJO TUBERIA 3/4"=

3/4"------------->X
Diametro= 3/4"*25,54mm /1" = 19,16mm/1000m=0,02m
long tuberia= dato de la partida 3=8,09m+2,98m=11,07m
DESALOJO TUBERIA 3/4"= /4*(0,012m)*11,07m=0,003m3
AREA DEPORTIVA

/4**long tuberia 1/2"


Diametro ( m)= 1"----------->25,54mm

DESALOJO TUBERIA 1/2"=

1/2"------------->X
Diametro= 1/2"*25,54mm /1" = 12,77mm/1000m=0,013m
long tuberia= dato de la partida 3=2,93m
DESALOJO TUBERIA 1/2"= /4*(0,013m)*2,93m=0,0003m3

COLCHON DE ARENA= DATO DE LA PARTIDA 6= 127,77m3


RELLENO DE PRESTAMO= DATO DE LA PARTIDA 5= 210,95m3
COMPACTACION= (1109,64m3)-(33,67m3+0,97m3+0,05m3+0,01m3+0,003m3+0,0003m3+210,95m3)= 863
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO
VOLUMEN DE RELLENO DE PRESTAMO= Long tub.*ancho*(altura tub+0,05)-volumen de la tuberia
TUBERIA PRINCIPAL 6"
ALTURA DE RELLENO= (altura de tub+0,05m)
altura del tub= diametro+0,05m
diametro= dato de la partida 4= 0,15m
altura del tub= 0,15+0,05m=0,20m
volumen tuberia= dato de la partida=33,67m3
VOLUMEN DE RELLENO DE PRESTAMO= (1905,45m*0,60m*0,20m)- 33,67m3=194,98m3
TUBERIA SECUNDARIA
EDIFICIOS Y MANZANAS DE 3"
ALTURA DE RELLENO= (altura de tub+0,05m)
altura del tub= diametro+0,05m
diametro= dato de la partida 4= 0,08m
altura del tub= 0,08+0,05m=0,13m
volumen tuberia= dato de la partida=0,97m
VOLUMEN DE RELLENO DE PRESTAMO= (193,71m*0,60m*0,13m)-0,97 m3=14,14m3
CENTRO COMERCIAL,SIMONCITO,ESCUELA-PREESCOLAR,CENTRO MEDICO ASISTENCIAL (2")
ALTURA DE RELLENO= (altura de tub+0,05m)
altura del tub= diametro+0,05m
diametro= dato de la partida 4= 0,05m
altura del tub= 0,05+0,05m=0,10m
volumen tuberia= dato de la partida=0,05m3
VOLUMEN DE RELLENO DE PRESTAMO= (24,88m*0,60m*0,10m)-0,05m3=1,44m3
CASA CULTURAL,MODULO POLICIAL, CASA COMUNAL (1")
ALTURA DE RELLENO= (altura de tub+0,05m)
altura del tub= diametro+0,05m
diametro= dato de la partida 4= 0,03m
altura del tub= 0,03+0,05m=0,08m
volumen tuberia= dato de la partida=0,01m3
VOLUMEN DE RELLENO DE PRESTAMO= (14,05m*0,20m*0,08m)-0,01m3=0,21m3
MERCAL Y CAPILLA
ALTURA DE RELLENO= (altura de tub+0,05m)
altura del tub= diametro+0,05m
diametro= dato de la partida 4= 0,02m

altura del tub= 0,02+0,05m=0,08m


volumen tuberia= dato de la partida=0,01m3
VOLUMEN DE RELLENO DE PRESTAMO= (11,07m*0,20m*0,07m)-0,003m3=0,15m3
AREA DEPORTIVA
ALTURA DE RELLENO= (altura de tub+0,05m)
altura del tub= diametro+0,05m
diametro= dato de la partida 4= 0,013m
altura del tub= 0,013+0,05m=0,06m
volumen tuberia= dato de la partida=0,01m3
VOLUMEN DE RELLENO DE PRESTAMO= (11,07m*0,20m*0,07m)-0,0003m3=0,03m3
TOTAL DE RELLENO DE PRESTAMO= 210,95m3
COLCHON DE ARENA
COLCHO DE ARENA= long tuberia* ancho* profundidad
Tuberia Principal
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 1905,45m*0,60m*0,10m= 114,33m3
Tuberia secundaria
EDIFICIO
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 187,63m*0,60m*0,10m= 11,26m3
CENTRO COMERCIALES
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 7,09m*0,60m*0,10m= 0,43 m3
CASA CULTURAL
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 2,98m*0,20m*0,10m= 0,06 m3
SIMONCITO
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 5,65m*0,20m*0,10m= 0,11 m3
MODULO POLICIAL
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 2,98m*0,20m*0,10m= 0,06 m3
ESCUELA- PREESCOLAR
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 6,07m*0,60m*0,10m= 0,36m3
LICEO
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 6,08m*0,60m*0,10m= 0,36m3
MERCAL
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 8,09m*0,20m*0,10m= 0,16m3
AREA DEPORTIVA
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 2,93m*0,20m*0,10m= 0,06m3
CASA COMUNAL
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 8,09m*0,20m*0,10m= 0,16m3
CAPILLA
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 2,98m*0,20m*0,10m= 0,06m3
CENTRO MEDICO ASISTENCIAL
long tuberia=( dato proveniente de la partida 3)
colchon de arena= 6,07m*0,60m*0,10m= 0,36m3
TOTAL DE COLCHON DE ARENA=VOL (Tuberia Principal+ Tuberia Secundaria)
BOTE DEL MATERIAL DE LA EXCAVACION

TRANSPORTE DE MAQUINARIA

TUBERIA PVC 2" (TUBERIA SECUNDARIA)


Tuberia Pvc 2"= long tuberia
CENTRO MEDICO ASISTENCIAL= SUMATORIA DE LOS TRAMOS
TRAMO 1= 4,56m=
TRAMO 2= 4,60m=
TRAMO 3= 9,96m
TRAMO 4= 2,42m
TRAMO 5= 0,83m
TRAMO 6= 1,61m
TRAMO 7= 0,74m
TRAMO 8= 1,25m
TRAMO 9= 0,31m
TRAMO 10= 1,91m
TRAMO 11= 15,34m
TRAMO 12=1,17m
TRAMO 13= 0,55m
TRAMO 14= 1,17m
TRAMO 15= 0,55m
TRAMO 16= 1,70m
TRAMO 17= 0,83m
TRAMO 18= 1,42m
TRAMO 19= 11,25m
TRAMO 20= 0,61m
TRAMO 21= 0,14m
TRAMO 22= 0,48m
TRAMO 23= 0,74m
TRAMO 24=10,80m
TRAMO 25=0,82m
TRAMO 26= 0,68m
TRAMO 27= 0,82m
TRAMO 28=0,86m
TRAMO 29= 0,68m
TRAMO 30=0,82m
TRAMO 31=0,49m
TRAMO 32=1,98m
TRAMO 33=0,20m
TRAMO 34=2,77m
TRAMO 35=17,20m
TRAMO 36=2,31m
TRAMO 37=6,71m
TRAMO 38=0,71m
TRAMO 39=3,59m
TRAMO 40=0,85m
TRAMO 41=1,21m
TRAMO 42=0,83m
TRAMO 43= 1,08m
TRAMO 44=0,83m
TRAMO 45= 0,87m
TRAMO 46=1,00m
TRAMO 47=138m
TRAMO 48=2,41m
TRAMO 49=4,88m
TRAMO 50= 2,48m
TRAMO 51= 25,49m
Tuberia Pvc 2"= 158,89m

SIMONCITO= suma de los tramos


TRAMO 1= 0,78m=
TRAMO 2= 0,94m
TRAMO 3= 0,87m
TRAMO 4= 1,43m
TRAMO 5= 0,79m
TRAMO 6= 0,56m
TRAMO 7= 0,98m
TRAMO 8= 0,87
TRAMO 9= 1,16m
TRAMO 10= 0,78m
TRAMO 11= 0,57m
TRAMO 12=1,00m
TRAMO 13= 3,19m
TRAMO 14= 1,94m
TRAMO 15= 4,79m
TRAMO 16= 3,29m
TRAMO 17= 3,49m
TRAMO 18= 8,09m
Tuberia Pvc 2"= 35,52m
CENTRO COMERCIAL= suma de los tramos
TRAMO 1=5,01m=
TRAMO 2= 3,74m=
TRAMO 3= 1,27m=
TRAMO 4= 2,41m=
TRAMO 5= 5,56m=
TRAMO 6= 2,97m=
TRAMO 7= 3,13m=
TRAMO 8= 1,57m
TRAMO 9= 0,81m
TRAMO 10= 2,99m
TRAMO 11= 13,80m
TRAMO 12=7,24m=
TRAMO 13= 0,54m=
TRAMO 14=0,52m=
TRAMO 15= 0,38m=
TRAMO 16= 0,49m=
TRAMO 17= 0,48m=
TRAMO 18= 0,50m=
TRAMO 19= 0,38m=
TRAMO 20= 0,36m=
TRAMO 21= 0,38m=
TRAMO 22= 0,16m=
TRAMO 23= 0,59m=
TRAMO 24=1,00m
TRAMO 25=0,78m=
TRAMO 26=0,71m=
TRAMO 27=4,45m
TRAMO 28=1,03m
TRAMO 29=7,24m
Tuberia Pvc 2"= 70,49m
ESCUELA PREESCOLAR
Tuberia Pvc 2"= suma de los tramos
TRAMO 1= 26,71m
TRAMO 2= 17,42m
TRAMO 3= 2,69m
TRAMO 4= 0,33m
TRAMO 5= 4,92m
TRAMO 6= 29,41m
TRAMO 7= 22,62m
TRAMO 8= 0,58m
TRAMO 9= 3,00m
TRAMO 10=0,82m
TRAMO 11= 0,91m
TRAMO 12=0,20m
TRAMO 13= 5,34m
TRAMO 14= 29,67m

TRAMO 15= 6,42m


TRAMO 16= 30,8m
TRAMO 17= 9,99m
TRAMO 18= 0,43m
TRAMO 19= 0,43m
TRAMO 20= 0,43m
TRAMO 21= 0,73m
TRAMO 22= 0,88m
TRAMO 23= 0,88m
TRAMO 24=1,15m
TRAMO 25=0,79m
TRAMO 26= 0,84m
TRAMO 27= 0,85m
TRAMO 28=0,87m
TRAMO 29= 0,87m
TRAMO 30=1,15m
TRAMO 31=0,78m
TRAMO 32=0,85m
TRAMO 33=1,00m
TRAMO 34=4,38m
TRAMO 35=3,49m
TRAMO 36=19,10m
Tuberia Pvc 2"= 231,73m
BAJANTES POR BLOQUE = 3 BAJANTES
long de bajantes= (10,8m+4,7m+7,21m)+(10,8m+3,45m)+(10,8m+6,09m+4,7m)=58,55m
Tuberia Pvc 2"= N Bloques*long del bajantes= 56 bloques* 58,55m= 3278,80m
TUBERIA PVC 2"= 158,89m+35,52m+70,49m+271,73m+3278,80m=3775,43m
TUBERIA PVC 3" (TUBERIA SECUNDARIA)
TUBERIA DE DISTRIBUCION DEL TANQUE SUBTERRANEO A LOS TANQUE ELEVADOS
Tuberia PVC 3"= N Manzana* long tuberia
MANZANA 4
long tub. Edificio 14 (4,94m+10,80m+14,21m+ 23,44m+16,54m+ 10,80m+ 4,94m)= 85,67m
long tub. Edificio 13 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
long tub. Edificio 16 (4,94m+10,80m+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m
long tub. Edificio 15 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
Tuberia PVC 3"= 1* 341,86m= 341,86
MANZANA 3
long tub. Edificio 12 (4,94m+10,80m+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m
long tub. Edificio 11 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
long tub. Edificio 10 (4,94m+10,80m+16,44m+ 23,44m+14,12m+ 10,80m+ 4,94m)= 85,48m
long tub. Edificio 09 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
Tuberia PVC 3"= 1* 341,67m= 341,67m
MANZANA 2
long tub. Edificio 08 (4,94m+10,80m+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m
long tub. Edificio 07 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
long tub. Edificio 06 (4,94m+10,80m+16,44m+ 23,44m+14,12m+ 10,80m+ 4,94m)= 85,48m
long tub. Edificio 05 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
Tuberia PVC 3"= 1* 341,67m= 341,67m
MANZANA 1
long tub. Edificio 04 (4,94m+10,80m+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m
long tub. Edificio 03 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
long tub. Edificio 02 (4,94m+10,80m+16,44m+ 23,44m+14,12m+ 10,80m+ 4,94m)= 85,48m
long tub. Edificio 01 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
Tuberia PVC 3"= 1* 341,67m= 341,67m
MANZANA 7
long tub. Edificio 28 (4,94m+10,80m+16,15m+ 23,48m+14,11m+ 10,80m+ 4,94m)= 85,22m
long tub. Edificio 27 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
long tub. Edificio 26 (4,94m+10,80m+16,44m+ 23,48m+14,12m+ 10,80m+ 4,94m)= 85,52m
long tub. Edificio 25 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
Tuberia PVC 3"= 1* 341,75m= 341,75m
MANZANA 6
long tub. Edificio 24 (4,94m+10,80m+16,15m+ 23,48m+14,11m+ 10,80m+ 4,94m)= 85,22m
long tub. Edificio 23 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
long tub. Edificio 22 (4,94m+10,80m+16,44m+ 23,48m+14,12m+ 10,80m+ 4,94m)= 85,52m
long tub. Edificio 21 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m

Tuberia PVC 3"= 1* 341,75m= 341,75m


MANZANA 5
long tub. Edificio 20 (4,94m+10,80m+16,15m+ 23,48m+14,11m+ 10,80m+ 4,94m)= 85,22m
long tub. Edificio 19 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
long tub. Edificio 18 (4,94m+10,80m+16,44m+ 23,48m+14,12m+ 10,80m+ 4,94m)= 85,52m
long tub. Edificio 16 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
Tuberia PVC 3"= 1* 341,75m= 341,75m
TUBERIA PRINCIPAL DEL TANQUE SUBTERRANEO A LA TUBERIA PRINCIPAL
long. De tub.= manzanas(1, 2, 3, 4, 5, 6, 7)
long.de tub. Manzana 1= ( 7,71m+ 4,66m+ 7,72m+ 9,77m)= 29,86m3
long. De tub. Manzana 2=( 7,71m+ 4,67m+ 7,70m+ 9,76m)= 29,84m3
long. De tub. Manzana 3=( 7,72m+ 4,69m+ 7,71m+ 9,76m)= 29,78m3
long. De tub. Manzana 4=(7,74m+ 4,70m+ 7,74m+ 9,75m)= 29,93m3
long. De tub. Manzana 5=(7,66m+ 4,73m+ 4,73m+ 7,65m)= 24,77m3
long. De tub. Manzana 6=(4,69m+ 4,70m+ 7,68m+ 4,70m)= 21,77m3
long. De tub. Manzana 7=(4,70m+ 4,57m+ 7,70+ 4,71m)= 21,68m3
long total de tub manzana= 187,63m
LICEO
Long tuberia PVC= SUMA DE CADA TRAMO HASTA EL TANQUE SUBTERRANEO
TRAMO 1=1,03m
TRAMO 2= (0,27+0,20)= 0,47m
TRAMO 3= 0,19m
TRAMO 4= 0,85m
TRAMO 5= 0,95m
TRAMO 6= 1,17m
TRAMO 7= 17,32m
TRAMO 8= 2,24m
TRAMO 9= 2,42m
TRAMO 10= 32,76m
TRAMO 11= 47,92
TRAMO 12=23,08
TRAMO 13= 1,09m
TRAMO 14= 1,10m
TRAMO 15= 0,70 m
TRAMO 16= 0,39 m
TRAMO 17= 0,25 m
TRAMO 18= 3,01 m
TRAMO 19= 0,97m
TRAMO 20= 0,97m
TRAMO 21= 0,52m
TRAMO 22= 2,36m
TRAMO 23=0,86m
TRAMO 24=0,29m
TRAMO 25=0,32m
TRAMO 26= 0,41m
TRAMO 27= 1,01m
TRAMO 28=1,19m
TRAMO 29= 0,64m
TRAMO 30=3,08m
TRAMO 31=48,32m
TRAMO 32=0,64m
TRAMO 33=0,98m
TRAMO 34=0,79m
TRAMO 35=0,84m
TRAMO 36=0,87m
TRAMO 37=0,83m
TRAMO 38=0,63m
TRAMO 39=0,91m
TRAMO 40=0,83m
TRAMO 41=0,88m
TRAMO 42=0,86m
TRAMO 43= 0,82m
TRAMO 44=1,00m
TRAMO 45= 0,79m
TRAMO 46=4,26m
TRAMO 47=9,18m
TRAMO 48=41,33m

TRAMO 49=11,67m
TRAMO 50= 3,71m
TRAMO 51= 9,73m
TRAMO 52=8,04m
TRAMO 53=23,1m
TRAMO 54=0,56m
TRAMO 55=0,29m
TRAMO 56=1,86m
TRAMO 57=1,33m
TRAMO 58=0,13m
TRAMO 59=1,05m
TRAMO 60=2,12m
TRAMO 61=0,77m
TRAMO 62=1,10m
TRAMO 63=7,66m
TOTAL DE TUBERIA DE 3"= 2917,19m
TUBERIA PVC 6" (TUBERIA PRINCIPAL)
TUBERIA PRINCIPAL A
Long tuberia (A)= dato proveniente de la partida 1= 768,39m
TUBERIA PRINCIPAL B
Long tuberia (B)= dato proveniente de la partida 1= 445,06m
TUBERIA PRINCIPAL C
Long tuberia (C)= dato proveniente de la partida 1= 692m
TUBERIA PVC 6"=1905,45m
TUBERIA SCHEDULLE 3/4" (SECUNDARIA)
TUBERIA 3/4"= SUMATORIA DE LOS TRAMOS
MERCAL= Tramo1+Tramo2+Tramo3
MERCAL= 0,90m+9,77m+10,75m= 22,22m
CAPILLA= Tramo1+Tramo 2+Tramo 3+Tramo 4+ Tramo 5
CAPILLA=0,88m+1,05m+0,89m+2,59m+12,02m= 17,43m
TUBERIA 3/4"= 38,85m

TUBERIA SCHEDULLE 1" (SECUNDARIA)


TUBERIA 1"= SUMATORIA DE LOS TRAMOS
CASA COMUNAL= Tramo1+Tramo2+Tramo3+Tramo4+Tramo5
CASA COMUNAL= 0,88m+1,05m+0,89m+2,59m+16,17m)= 21,58m
MODULO POLICIAL= Tramo1+Tramo 2+Tramo 3+Tramo 4+ Tramo 5+Tramo 6+Tramo7+Tramo8+Tramo9+
Tramo10+Tramo11+Tramo12
MODULO POLICIAL=(0,72m+0,68m+0,26m+0,20m+6,24m+0,66m+1m+0,43m+0,68m+0,40m+6,14+
4,55m=21,46m
CASA CULTURAL=tramo1+tramo2+tramo3+tramo4+tramo5+tramo6
CASA CULTURAL=0,90m+0,69m+0,57m+(0,29m+0,69m)+1,63m+18,24m=23,01m
APARTAMENTO= NUMERO DE APARTAMENTO*(SUMA DE LOS TRAMOS)
Tramo1= 0,52m
Tramo2= 0,52m
Tramo3= 0,61m
Tramo4= 0,25m
Tramo5= 0,71m
Tramo6= 0,63m
Tramo7= 0,11m
Tramo8= 0,34m
Tramo9= 037,m
Tramo10= 0,63m
Tramo11= 0,45m
Tramo12= 0,91m
Tramo13= 0,71m
APARTAMENTO= 672 APARTAMENTO*6,76m=4542,72m
TUBERIA SCHEDULLE 1" (SECUNDARIA)=4609,27m

TUBERIA SCHEDULLE DE 1/2" PARA CONEXIONES DE PIEZA


Tuberia de 1/2"=Sumatoria de los Tramos
ESCUELA PREESCOLAR
TRAMO 1=0,13m
TRAMO 3= 0,13m
TRAMO 8=0,31m
TRAMO 10= 0,13m
TRAMO 18= 0,12m
TRAMO 19= 0,12m
TRAMO 20= 0,12m
TRAMO 21= 0,12m
TRAMO 22=0,17 m
TRAMO 23= 0,17m
TRAMO 25= 0,15m
TRAMO 27=0,11m
TRAMO 28=0,11m
TRAMO 29= 0,11m
TRAMO 31= 0,15 m
TRAMO 32= 0,15m
TUBERIA SCHEDULLE DE 1/2"=2,30m
SIMONCITO=
TRAMO 1= 0,12m
TRAMO2=0,12m
TRAMO3=0,17m
TRAMO4=0,17m
TRAMO5=0,15m
TRAMO6=0,15m
TRAMO7=0,12m
TRAMO8=0,17m
TRAMO9=0,18m
TRAMO10=0,15m
TRAMO11=0,15m
TRAMO14=0,72m
TUBERIA SCHEDULLE DE 1/2"=2,37m
CASA CULTURAL
TRAMO1 =0,08m
TRAMO 2=0,17m
TRAMO 3=0,17m
TRAMO 4=0,08m
TUBERIA SCHEDULLE DE 1/2"=0,50m
AREA DEPORTIVA
TRAMO1 =2,93m
LICEO
TRAMO 1=0,11m
TRAMO 2=0,11m
TRAMO 6= 0,12m
TRAMO 8=0,83m
TRAMO 9=0,83m
TRAMO 13=0,11m
TRAMO 14=0,11m
TRAMO 15=0,11m
TRAMO 19=0,45m
TRAMO 20=0,45m
TRAMO 21=0,45m
TRAMO 23=0,10m
TRAMO 23=0,10m
TRAMO 27=0,11m
TRAMO 28=0,11m
TRAMO 29=0,10m
TRAMO 32=0,15m
TRAMO 33=0,15m
TRAMO 34=0,12m
TRAMO 35=0,11m
TRAMO 36=0,17m
TRAMO37=0,17m
TRAMO 44=0,17m

TRAMO 45=0,17m
TRAMO 38=0,13m
TRAMO 39=0,15m
TRAMO 40=0,17m
TRAMO 41=0,17m
TRAMO 42=0,17m
TRAMO 43=0,17m
TRAMO 50=0,35m
TRAMO 52=0,32m
TRAMO 53=032m
TRAMO 54=0,12m
TRAMO 57=0,11m
TRAMO 58=0,11m
TUBERIA SCHEDULLE DE 1/2"=7,70m
MERCAL
TRAMO 1=0,35m
TRAMO 2=0,44m
TUBERIA SCHEDULLE DE 1/2"=0,79m
CASA COMUNAL
TRAMO 1=0,78m
TRAMO 2=0,68m
TRAMO 3=0,75m
TRAMO 4=0,66m
TUBERIA SCHEDULLE DE 1/2"=2,87m
CENTRO MEDICO ASISTENCIAL
TRAMO 1=0,59m
TRAMO 2=0,40m
TRAMO 3=0,40m
TRAMO 5=0,14m
TRAMO 6=0,14m
TRAMO 7=0,13m
TRAMO 12=0,08m
TRAMO 13=0,09m
TRAMO 14=0,27m
TRAMO 15=0,11m
TRAMO 17=0,13m
TRAMO 18=0,35m
TRAMO 25=0,28m
TRAMO 26=0,16m
TRAMO 27=0,28m
TRAMO 28=0,33m
TRAMO 29=0,28m
TRAMO 30=0,16m
TRAMO 31=0,35m
TRAMO 20=0,17m
TRAMO 21=0,14m
TRAMO 22=0,07m
TRAMO 38=0,10m
TRAMO 41=0,32m
TRAMO 42=0,39m
TRAMO 43=039m
TRAMO 45=0,39m
TRAMO 46=0,32m
TRAMO 47=0,32m
TUBERIA SCHEDULLE DE 1/2"=7,28m
CAPILLA
TRAMO 1=0,17m
TRAMO 2=0,10m
TUBERIA SCHEDULLE DE 1/2"=0,27m
CENTRO COMERCIAL
TRAMO 1=0,31m
TRAMO 2=0,28m
TRAMO 3=0,35m
TRAMO 4=0,31m
TRAMO 5=0,33m
TRAMO 6=0,36m
TRAMO 7=0,28m

TRAMO 12=0,29m
TRAMO 13=0,17m
TRAMO 14=0,16m
TRAMO 15=0,13m
TRAMO 16=0,15m
TRAMO 17=0,13m
TRAMO 18=0,15m
TRAMO 19=0,14m
TRAMO 20=0,14m
TRAMO 21=0,12m
TRAMO 22=0,12m
TRAMO 23=0,12m
TRAMO 25=0,26m
TRAMO 26=0,25m
TUBERIA SCHEDULLE DE 1/2"=4,55m
MODULO POLICIAL
TRAMO 1=0,12m
TRAMO 2=0,10m
TRAMO 3=0,10m
TRAMO 7=0,10m
TRAMO 8=0,10m
TRAMO 9=0,12m
TUBERIA SCHEDULLE DE 1/2"=0,64m
APARTAMENTOS
TRAMO 1=(0,05m+0,90)=
TRAMO 2= (0,05m+0,90m)=
TRAMO 3 =(0,05m+0,90m)=
TRAMO 5=(0,05m+0,90m)
TRAMO 6=(0,05m+0,30m)=
TRAMO 7=(0,05m+1,80m)=
TRAMO 10=(0,05m+0,30m)=
TRAMO 11=(1,80m+0,05m)=
TUBERIA SCHEDULLE DE 1/2"=0,64m
TOTAL DE TUBERIA SCHEDULLE DE 1/2"=40,40M
TUBERIA DE HIERRO GALVANIZADO DE 6"
TUBERIA DEL TANQUE AUSTRALIANO AL POZO DE PERFORACION
TUBERIA DE HG ASTM 6"= 10m

CAJA TRONCO-CONICA
CAJA TRONCO-CONICA= CASA COMUNAL+CENTRO COMERCIAL+CENTRO MEDICO ASISTENCIAL+C
MERCAL+MODULO POLICIAL+

OBSERVACIONES
APERTURA DE PICAS Y DESMONTES
A DE PICAS Y DESMONTES= long tuberia (A+B+C) + long tuberia secundaria (acometidas)
TUBERIA PRINCIPAL
ncipal A= Calle princ+carre 6+carre 5+calle 1+carre 3+carre 4+tramo21+tramo 22
ncipal A= (122,42+ 93,01+ 256,91+ 146,35+ 6,94+ 6,85 +29,12+ 106,79)m= 768,39m
ncipal B= calle princ+ carre4+ carre3+ carre2 + tramo 37+ tramo 38
cipal B= (203,15+ 18,31+ 18,60+ 131,99 + 28,82+ 44,19)m= 445,06 m
ncipal C= calle princ+ calle2 + carre 4 + carre 3 +carre 2+ carre 1 + calle 1+ tramo 62
ncipal C= ( 87,83+216,47+ 17,17+ 12,42+ 11,74+ 263,95+ 63,17+ 19,25)m = 692m

TUBERIA SECUNDARIA
cundaria= edificio+centro comerciales+casa cultural+simoncito+modulo policial+
e escolar+liceo+mercal+casa comunal+area deportivo+capilla+centro medico asistencial
cundaria= (182,13+7,09+2,98+5,65+2,98+6,07+6,08+8,09+8,09+2,93+2,98+6,07)m= 241,14m

AS DE PICAS Y DESMONTE= (1905,45+241,14)m= 2146,59m


NIVELACION Y REPLANTEO
ON Y REPLANTEO= DATO PROVENIENTE DE LA PARTIDA N 1=2146,59m
EXCAVACION A MANO EN TERRENO DE CANTO RODADO
= largo*ancho*prof
total = excv tub princ + excv tub secundaria
EXCAVACION TUBERIA PRINCIPALde 6"
e la tub prin= tub princ A + tub princ B + tub princ C
ncipal A= calle princ + carre 6+ carre 5+ calle 1+ carre 3+ carre4+ tramo 21+ tramo 22
ncipal A= (122,42+ 93,01+ 256,91+ 146,35+ 6,94+ 6,85 +29,12+ 106,79)m= 768,39 m
ncipal B= calle princ+ carre4+ carre3+ carre2 + tramo 37+ tramo 38
ncipal B= (203,15+ 18,31+ 18,60+ 131,99 + 28,82+ 44,19)m= 445,06 m
ncipal C= calle princ+ calle2 + carre 4 + carre 3 +carre 2+ carre 1 + calle 1+ tramo 62
ncipal C= ( 87,83+216,47+ 17,17+ 12,42+ 11,74+ 263,95+ 63,17+ 19,25)m = 692m
e tub principal= (768,38+ 445,06+694)m= 1905,45m
= 1905,45m*0.60m*0.89m= 1017,50m3

EXCAVACION TUBERIA SECUNDARIA


EDIFICIO 3"
TUBERIA DEL TANQUE SUBTERRANEO A LA PRINCIPAL
b.= manzanas(1, 2, 3, 4, 5, 6, 7)
. Manzana 1= ( 7,71m+ 4,66m+ 7,72m+ 9,77m)= 29,86m3
b. Manzana 2=( 7,71m+ 4,67m+ 7,70m+ 9,76m)= 29,84m3
b. Manzana 3=( 7,72m+ 4,69m+ 7,71m+ 9,76m)= 29,78m3
b. Manzana 4=(7,74m+ 4,70m+ 7,74m+ 9,75m)= 29,93m3
b. Manzana 5=(7,66m+ 4,73m+ 4,73m+ 7,65m)= 24,77m3
b. Manzana 6=(4,69m+ 4,70m+ 7,68m+ 4,70m)= 21,77m3
b. Manzana 7=(4,70m+ 4,57m+ 7,70+ 4,71m)= 21,68m3
e tub manzana= 187,63m
e manz=long total *ancho*prof
e manzana= 187,63m*0,60m*0,70m=78,80 m3.
CENTRO COMERCIAL 2"
centro comercial= 7,09m
b C.C= long*ancho*prof
el C.C= 7,09m*0,60m*070 = 2,98m3.

CASA CULTURAL 1"


la casa cultural= 2,98m
b = long*ancho*prof
e casa cultural= 2,98m*0,20m*0,40m = 0,24m3
SIMONCITO 2"
simoncito= 5,65m
b = long*ancho*prof
el simoncito= 5,65m*0,20m*0,40m = 0,45m3
MODULO POLICIAL 1"
modulo policial= 2,98m
b= long*ancho*prof
el modulo policial= 2,98m*0,20m*0,40m = 0,24m3
ESCUELA - PREESCOLAR 2"
escuela-preescolar = 6,07m
b = long*ancho*prof
e escuela-preescolar= 6,07m*0,60m*0,70= 2,55m3
LICEO 3"
liceo = 6,08M
b = long*ancho*prof
el liceo= 6,08m*0,60m*0,70= 2,55m3
MERCAL 3/4"
mercal = 8,09M
b = long*ancho*prof
e mercal= 8,09m*0,20m*0,40= 0,65m3
AREA DEPORTIVA 1/2"
ea deportiva= 2,93m
b= long*ancho*prof
el area deportv= 2,93m,*0,20m*0,40m= 0,23 m3
CASA COMUNAL 1"
casa comunal= 8,09m
b= long*ancho*prof
el casa comunal= 8,09m*0,20m*0,40m= 0,65m3
CAPILLA 3/4"
la capilla= 2,98m
b= long*ancho*prof
e la capilla= 2,98m*0,20m*0,40m= 0,24m3
CENTRO MEDICO ASISTENCIAL 2"
centro medico asistencial= 6,07m
b= long*ancho*prof
el centro medico= 6,07m*0,60m*0,70m= 2,55m3
e la tuberia secundaria= 241,14m
EXCAVACION= EXCAV TUBERIA PRINCIPAL+ EXCAV TUBERIA SECUNDARIA
RELLENO COMPACTADO CON MATERIAL DE LA EXCAVACION

ACION= Volumen de la excavacion- desalojos


ON TOTAL= 1109,64m3
TUBERIA PRINCIPAL

/4**long tuberia 6"


( m)= 1"----------->25,54mm

O TUBERIA 6"=

6"------------->X
6"*25,54mm /1" = 153,24mm/1000m=0,15m
a= dato de la partida 3= 1905,45m
O TUBERIA (6)"= /4*(0,15m)*1905,45m=33,67m3
LICEO y MANZANAS

/4**long tuberia 3"


( m)= 1"----------->25,54mm

O TUBERIA 3"=

3"------------->X
3"*25,54mm /1" = 76,62mm/1000m=0,08m
a= dato de la partida 3= 6,08m+187,63m=193,71m
O TUBERIA 3"= /4*(0,08m)*193,71m=0,97m3
CENTRO COMERCIAL,SIMONCITO,ESCUELA-PREESCOLAR,CENTRO MEDICO ASISTENCIAL

/4**long tuberia "


( m)= 1"----------->25,54mm

O TUBERIA 2"=

2"------------->X
2"*25,54mm /1" = 51,08mm/1000m=0,05m
a= dato de la partida 3= 7,09m+5,65+6,07+6,07m=24,88m

O TUBERIA 2"= /4*(0,05m)*24,88m=0,05m3


CASA CULTURAL,MODULO POLICIAL, CASA COMUNAL

/4**long tuberia 1"


( m)= 1"----------->25,54mm

O TUBERIA 1"=

1"------------->X
1"*25,54mm /1" = 25,54mm/1000m=0,03m
a= dato de la partida 3= 2,98m+2,98m+8,09m= 14,05m
O TUBERIA 1"= /4*(0,03m)*14,05m=0,01m3
MERCAL Y CAPILLA

/4**long tuberia 3/4"


( m)= 1"----------->25,54mm

O TUBERIA 3/4"=

3/4"------------->X
3/4"*25,54mm /1" = 19,16mm/1000m=0,02m
a= dato de la partida 3=8,09m+2,98m=11,07m
O TUBERIA 3/4"= /4*(0,012m)*11,07m=0,003m3
AREA DEPORTIVA

/4**long tuberia 1/2"


( m)= 1"----------->25,54mm

O TUBERIA 1/2"=

1/2"------------->X
1/2"*25,54mm /1" = 12,77mm/1000m=0,013m
a= dato de la partida 3=2,93m
O TUBERIA 1/2"= /4*(0,013m)*2,93m=0,0003m3

DE ARENA= DATO DE LA PARTIDA 6= 127,77m3


DE PRESTAMO= DATO DE LA PARTIDA 5= 210,95m3
ACION= (1109,64m3)-(33,67m3+0,97m3+0,05m3+0,01m3+0,003m3+0,0003m3+210,95m3)= 863,99m3
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

DE RELLENO DE PRESTAMO= Long tub.*ancho*(altura tub+0,05)-volumen de la tuberia


TUBERIA PRINCIPAL 6"
E RELLENO= (altura de tub+0,05m)
ub= diametro+0,05m
dato de la partida 4= 0,15m
ub= 0,15+0,05m=0,20m
beria= dato de la partida=33,67m3
DE RELLENO DE PRESTAMO= (1905,45m*0,60m*0,20m)- 33,67m3=194,98m3

TUBERIA SECUNDARIA
Y MANZANAS DE 3"
E RELLENO= (altura de tub+0,05m)
ub= diametro+0,05m
dato de la partida 4= 0,08m
ub= 0,08+0,05m=0,13m
beria= dato de la partida=0,97m
DE RELLENO DE PRESTAMO= (193,71m*0,60m*0,13m)-0,97 m3=14,14m3

COMERCIAL,SIMONCITO,ESCUELA-PREESCOLAR,CENTRO MEDICO ASISTENCIAL (2")


E RELLENO= (altura de tub+0,05m)
ub= diametro+0,05m
dato de la partida 4= 0,05m
ub= 0,05+0,05m=0,10m
beria= dato de la partida=0,05m3
DE RELLENO DE PRESTAMO= (24,88m*0,60m*0,10m)-0,05m3=1,44m3

CASA CULTURAL,MODULO POLICIAL, CASA COMUNAL (1")


E RELLENO= (altura de tub+0,05m)
ub= diametro+0,05m
dato de la partida 4= 0,03m
ub= 0,03+0,05m=0,08m
beria= dato de la partida=0,01m3
DE RELLENO DE PRESTAMO= (14,05m*0,20m*0,08m)-0,01m3=0,21m3
MERCAL Y CAPILLA
E RELLENO= (altura de tub+0,05m)
ub= diametro+0,05m
dato de la partida 4= 0,02m

ub= 0,02+0,05m=0,08m
beria= dato de la partida=0,01m3
DE RELLENO DE PRESTAMO= (11,07m*0,20m*0,07m)-0,003m3=0,15m3

AREA DEPORTIVA
E RELLENO= (altura de tub+0,05m)
ub= diametro+0,05m
dato de la partida 4= 0,013m
ub= 0,013+0,05m=0,06m
beria= dato de la partida=0,01m3
DE RELLENO DE PRESTAMO= (11,07m*0,20m*0,07m)-0,0003m3=0,03m3

RELLENO DE PRESTAMO= 210,95m3


COLCHON DE ARENA

DE ARENA= long tuberia* ancho* profundidad


incipal
a=( dato proveniente de la partida 3)
arena= 1905,45m*0,60m*0,10m= 114,33m3
cundaria

a=( dato proveniente de la partida 3)


arena= 187,63m*0,60m*0,10m= 11,26m3
COMERCIALES
a=( dato proveniente de la partida 3)
arena= 7,09m*0,60m*0,10m= 0,43 m3
TURAL
a=( dato proveniente de la partida 3)
arena= 2,98m*0,20m*0,10m= 0,06 m3
O
a=( dato proveniente de la partida 3)
arena= 5,65m*0,20m*0,10m= 0,11 m3
POLICIAL
a=( dato proveniente de la partida 3)
arena= 2,98m*0,20m*0,10m= 0,06 m3
PREESCOLAR
a=( dato proveniente de la partida 3)
arena= 6,07m*0,60m*0,10m= 0,36m3

a=( dato proveniente de la partida 3)


arena= 6,08m*0,60m*0,10m= 0,36m3

a=( dato proveniente de la partida 3)


arena= 8,09m*0,20m*0,10m= 0,16m3
ORTIVA
a=( dato proveniente de la partida 3)
arena= 2,93m*0,20m*0,10m= 0,06m3
MUNAL
a=( dato proveniente de la partida 3)
arena= 8,09m*0,20m*0,10m= 0,16m3

a=( dato proveniente de la partida 3)


arena= 2,98m*0,20m*0,10m= 0,06m3
MEDICO ASISTENCIAL
a=( dato proveniente de la partida 3)
arena= 6,07m*0,60m*0,10m= 0,36m3
COLCHON DE ARENA=VOL (Tuberia Principal+ Tuberia Secundaria)
BOTE DEL MATERIAL DE LA EXCAVACION

TRANSPORTE DE MAQUINARIA

TUBERIA PVC 2" (TUBERIA SECUNDARIA)

c 2"= long tuberia


MEDICO ASISTENCIAL= SUMATORIA DE LOS TRAMOS
4,56m=
4,60m=
9,96m
2,42m
0,83m
1,61m
0,74m
1,25m
0,31m
= 1,91m
= 15,34m
=1,17m
= 0,55m
= 1,17m
= 0,55m
= 1,70m
= 0,83m
= 1,42m
= 11,25m
= 0,61m
= 0,14m
= 0,48m
= 0,74m
=10,80m
=0,82m
= 0,68m
= 0,82m
=0,86m
= 0,68m
=0,82m
=0,49m
=1,98m
=0,20m
=2,77m
=17,20m
=2,31m
=6,71m
=0,71m
=3,59m
=0,85m
=1,21m
=0,83m
= 1,08m
=0,83m
= 0,87m
=1,00m
=138m
=2,41m
=4,88m
= 2,48m
= 25,49m
c 2"= 158,89m

O= suma de los tramos


0,78m=
0,94m
0,87m
1,43m
0,79m
0,56m
0,98m
0,87
1,16m
= 0,78m
= 0,57m
=1,00m
= 3,19m
= 1,94m
= 4,79m
= 3,29m
= 3,49m
= 8,09m
c 2"= 35,52m
COMERCIAL= suma de los tramos
5,01m=
3,74m=
1,27m=
2,41m=
5,56m=
2,97m=
3,13m=
1,57m
0,81m
= 2,99m
= 13,80m
=7,24m=
= 0,54m=
=0,52m=
= 0,38m=
= 0,49m=
= 0,48m=
= 0,50m=
= 0,38m=
= 0,36m=
= 0,38m=
= 0,16m=
= 0,59m=
=1,00m
=0,78m=
=0,71m=
=4,45m
=1,03m
=7,24m
c 2"= 70,49m
PREESCOLAR
c 2"= suma de los tramos
26,71m
17,42m
2,69m
0,33m
4,92m
29,41m
22,62m
0,58m
3,00m
=0,82m
= 0,91m
=0,20m
= 5,34m
= 29,67m

= 6,42m
= 30,8m
= 9,99m
= 0,43m
= 0,43m
= 0,43m
= 0,73m
= 0,88m
= 0,88m
=1,15m
=0,79m
= 0,84m
= 0,85m
=0,87m
= 0,87m
=1,15m
=0,78m
=0,85m
=1,00m
=4,38m
=3,49m
=19,10m
c 2"= 231,73m
POR BLOQUE = 3 BAJANTES
antes= (10,8m+4,7m+7,21m)+(10,8m+3,45m)+(10,8m+6,09m+4,7m)=58,55m
c 2"= N Bloques*long del bajantes= 56 bloques* 58,55m= 3278,80m
PVC 2"= 158,89m+35,52m+70,49m+271,73m+3278,80m=3775,43m
TUBERIA PVC 3" (TUBERIA SECUNDARIA)

DE DISTRIBUCION DEL TANQUE SUBTERRANEO A LOS TANQUE ELEVADOS


C 3"= N Manzana* long tuberia
4
dificio 14 (4,94m+10,80m+14,21m+ 23,44m+16,54m+ 10,80m+ 4,94m)= 85,67m
dificio 13 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
dificio 16 (4,94m+10,80m+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m
dificio 15 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
C 3"= 1* 341,86m= 341,86
3
dificio 12 (4,94m+10,80m+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m
dificio 11 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
dificio 10 (4,94m+10,80m+16,44m+ 23,44m+14,12m+ 10,80m+ 4,94m)= 85,48m
dificio 09 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
C 3"= 1* 341,67m= 341,67m
2
dificio 08 (4,94m+10,80m+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m
dificio 07 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
dificio 06 (4,94m+10,80m+16,44m+ 23,44m+14,12m+ 10,80m+ 4,94m)= 85,48m
dificio 05 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
C 3"= 1* 341,67m= 341,67m
1
dificio 04 (4,94m+10,80m+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m
dificio 03 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
dificio 02 (4,94m+10,80m+16,44m+ 23,44m+14,12m+ 10,80m+ 4,94m)= 85,48m
dificio 01 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
C 3"= 1* 341,67m= 341,67m
7
dificio 28 (4,94m+10,80m+16,15m+ 23,48m+14,11m+ 10,80m+ 4,94m)= 85,22m
dificio 27 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
dificio 26 (4,94m+10,80m+16,44m+ 23,48m+14,12m+ 10,80m+ 4,94m)= 85,52m
dificio 25 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
C 3"= 1* 341,75m= 341,75m
6
dificio 24 (4,94m+10,80m+16,15m+ 23,48m+14,11m+ 10,80m+ 4,94m)= 85,22m
dificio 23 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
dificio 22 (4,94m+10,80m+16,44m+ 23,48m+14,12m+ 10,80m+ 4,94m)= 85,52m
dificio 21 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m

C 3"= 1* 341,75m= 341,75m


5
dificio 20 (4,94m+10,80m+16,15m+ 23,48m+14,11m+ 10,80m+ 4,94m)= 85,22m
dificio 19 (4,94m+10,80m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
dificio 18 (4,94m+10,80m+16,44m+ 23,48m+14,12m+ 10,80m+ 4,94m)= 85,52m
dificio 16 (4,94m+10,80m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
C 3"= 1* 341,75m= 341,75m
PRINCIPAL DEL TANQUE SUBTERRANEO A LA TUBERIA PRINCIPAL
b.= manzanas(1, 2, 3, 4, 5, 6, 7)
. Manzana 1= ( 7,71m+ 4,66m+ 7,72m+ 9,77m)= 29,86m3
b. Manzana 2=( 7,71m+ 4,67m+ 7,70m+ 9,76m)= 29,84m3
b. Manzana 3=( 7,72m+ 4,69m+ 7,71m+ 9,76m)= 29,78m3
b. Manzana 4=(7,74m+ 4,70m+ 7,74m+ 9,75m)= 29,93m3
b. Manzana 5=(7,66m+ 4,73m+ 4,73m+ 7,65m)= 24,77m3
b. Manzana 6=(4,69m+ 4,70m+ 7,68m+ 4,70m)= 21,77m3
b. Manzana 7=(4,70m+ 4,57m+ 7,70+ 4,71m)= 21,68m3
e tub manzana= 187,63m

a PVC= SUMA DE CADA TRAMO HASTA EL TANQUE SUBTERRANEO


1,03m
(0,27+0,20)= 0,47m
0,19m
0,85m
0,95m
1,17m
17,32m
2,24m
2,42m
= 32,76m
= 47,92
=23,08
= 1,09m
= 1,10m
= 0,70 m
= 0,39 m
= 0,25 m
= 3,01 m
= 0,97m
= 0,97m
= 0,52m
= 2,36m
=0,86m
=0,29m
=0,32m
= 0,41m
= 1,01m
=1,19m
= 0,64m
=3,08m
=48,32m
=0,64m
=0,98m
=0,79m
=0,84m
=0,87m
=0,83m
=0,63m
=0,91m
=0,83m
=0,88m
=0,86m
= 0,82m
=1,00m
= 0,79m
=4,26m
=9,18m
=41,33m

=11,67m
= 3,71m
= 9,73m
=8,04m
=23,1m
=0,56m
=0,29m
=1,86m
=1,33m
=0,13m
=1,05m
=2,12m
=0,77m
=1,10m
=7,66m

TUBERIA DE 3"= 2917,19m


TUBERIA PVC 6" (TUBERIA PRINCIPAL)

PRINCIPAL A
a (A)= dato proveniente de la partida 1= 768,39m
PRINCIPAL B
a (B)= dato proveniente de la partida 1= 445,06m
PRINCIPAL C
a (C)= dato proveniente de la partida 1= 692m
PVC 6"=1905,45m
TUBERIA SCHEDULLE 3/4" (SECUNDARIA)

3/4"= SUMATORIA DE LOS TRAMOS


Tramo1+Tramo2+Tramo3
0,90m+9,77m+10,75m= 22,22m
Tramo1+Tramo 2+Tramo 3+Tramo 4+ Tramo 5
0,88m+1,05m+0,89m+2,59m+12,02m= 17,43m
3/4"= 38,85m

TUBERIA SCHEDULLE 1" (SECUNDARIA)


1"= SUMATORIA DE LOS TRAMOS
MUNAL= Tramo1+Tramo2+Tramo3+Tramo4+Tramo5
MUNAL= 0,88m+1,05m+0,89m+2,59m+16,17m)= 21,58m
POLICIAL= Tramo1+Tramo 2+Tramo 3+Tramo 4+ Tramo 5+Tramo 6+Tramo7+Tramo8+Tramo9+
ramo11+Tramo12
POLICIAL=(0,72m+0,68m+0,26m+0,20m+6,24m+0,66m+1m+0,43m+0,68m+0,40m+6,14+
46m
TURAL=tramo1+tramo2+tramo3+tramo4+tramo5+tramo6
TURAL=0,90m+0,69m+0,57m+(0,29m+0,69m)+1,63m+18,24m=23,01m
ENTO= NUMERO DE APARTAMENTO*(SUMA DE LOS TRAMOS)
52m
52m
61m
25m
71m
63m
11m
34m
37,m
0,63m
0,45m
0,91m
0,71m

ENTO= 672 APARTAMENTO*6,76m=4542,72m


SCHEDULLE 1" (SECUNDARIA)=4609,27m

TUBERIA SCHEDULLE DE 1/2" PARA CONEXIONES DE PIEZA


Tuberia de 1/2"=Sumatoria de los Tramos

PREESCOLAR
0,13m
0,13m
0,31m
= 0,13m
= 0,12m
= 0,12m
= 0,12m
= 0,12m
=0,17 m
= 0,17m
= 0,15m
=0,11m
=0,11m
= 0,11m
= 0,15 m
= 0,15m
SCHEDULLE DE 1/2"=2,30m
O=
0,12m
0,12m
0,17m
0,17m
0,15m
0,15m
0,12m
0,17m
0,18m
=0,15m
=0,15m
=0,72m
SCHEDULLE DE 1/2"=2,37m
TURAL
0,08m
0,17m
0,17m
0,08m
SCHEDULLE DE 1/2"=0,50m
ORTIVA
2,93m

0,11m
0,11m
0,12m
0,83m
0,83m
=0,11m
=0,11m
=0,11m
=0,45m
=0,45m
=0,45m
=0,10m
=0,10m
=0,11m
=0,11m
=0,10m
=0,15m
=0,15m
=0,12m
=0,11m
=0,17m
=0,17m
=0,17m

=0,17m
=0,13m
=0,15m
=0,17m
=0,17m
=0,17m
=0,17m
=0,35m
=0,32m
=032m
=0,12m
=0,11m
=0,11m
SCHEDULLE DE 1/2"=7,70m

0,35m
0,44m
SCHEDULLE DE 1/2"=0,79m
MUNAL
0,78m
0,68m
0,75m
0,66m
SCHEDULLE DE 1/2"=2,87m
MEDICO ASISTENCIAL
0,59m
0,40m
0,40m
0,14m
0,14m
0,13m
=0,08m
=0,09m
=0,27m
=0,11m
=0,13m
=0,35m
=0,28m
=0,16m
=0,28m
=0,33m
=0,28m
=0,16m
=0,35m
=0,17m
=0,14m
=0,07m
=0,10m
=0,32m
=0,39m
=039m
=0,39m
=0,32m
=0,32m
SCHEDULLE DE 1/2"=7,28m

0,17m
0,10m
SCHEDULLE DE 1/2"=0,27m
OMERCIAL
0,31m
0,28m
0,35m
0,31m
0,33m
0,36m
0,28m

=0,29m
=0,17m
=0,16m
=0,13m
=0,15m
=0,13m
=0,15m
=0,14m
=0,14m
=0,12m
=0,12m
=0,12m
=0,26m
=0,25m
SCHEDULLE DE 1/2"=4,55m
POLICIAL
0,12m
0,10m
0,10m
0,10m
0,10m
0,12m
SCHEDULLE DE 1/2"=0,64m

ENTOS
(0,05m+0,90)=
(0,05m+0,90m)=
=(0,05m+0,90m)=
(0,05m+0,90m)
(0,05m+0,30m)=
(0,05m+1,80m)=
=(0,05m+0,30m)=
=(1,80m+0,05m)=
SCHEDULLE DE 1/2"=0,64m

TUBERIA SCHEDULLE DE 1/2"=40,40M

TUBERIA DE HIERRO GALVANIZADO DE 6"


DEL TANQUE AUSTRALIANO AL POZO DE PERFORACION
DE HG ASTM 6"= 10m

CAJA TRONCO-CONICA
NCO-CONICA= CASA COMUNAL+CENTRO COMERCIAL+CENTRO MEDICO ASISTENCIAL+CAPILLA+
MODULO POLICIAL+

OBRA: "TERMINACION DE LA RED DE CLOACA DE LA ASOCIACION CIVIL LIBERTAD Y


PENSAMIENTO,EL SOCORRO, MUNICIPIO GARCIA DE HEVIA, ESTADO TACHIRA".
UBICACIN: EL SOCORRO, MUNICIPIO GARCIA DE HEVIA, ESTADO TAHIRA.
AO : 2.011

"PRESUPUESTO"
CODIGO Y DESCRIPCIN

N PART
1

H-012.340.100

UND

CANTIDAD

mts

2,146.59

mts

2,146.59

m3

1,109.64

LIMPIEZA DE TERRENO, APERTURA DE PICAS Y DESMONTES


2

H-016.400.00
NIVELACION Y REPLANTEO
H-021.130.SNO

EXCAVACION A MANO EN TERRENO PEDREGOSO O CANTO


RODADO

DE LA ASOCIACION CIVIL LIBERTAD Y


IA DE HEVIA, ESTADO TACHIRA".
DE HEVIA, ESTADO TAHIRA.

PU

PTOTAL
2.10

4,507.84

4.21

9,037.14

317.87

352,721.27

OBRA: "TERMINACION DE LA RED DE CLOACA DE LA ASOCIACION CIVIL LIBERTAD Y PEN


MUNICIPIO GARCIA DE HEVIA, ESTADO TACHIRA".
UBICACIN: EL SOCORRO, MUNICIPIO GARCIA DE HEVIA, ESTADO TAHIRA.
AO : 2.011

CRONOGRAMA DE TRABAJO
N PART

MES 1

CODIGO Y DESCRIPCIN
SEMANA 1

SEMANA 2

SOCIACION CIVIL LIBERTAD Y PENSAMIENTO,EL SOCORRO,

IA, ESTADO TAHIRA.

AMA DE TRABAJO
MES 1
SEMANA 3

MES 2
SEMANA 4

SEMANA 5

SEMANA 6

SEMANA 7

SEMANA 8