Name :Kirankumar D Chilatre.

JOB RESPONSIBILITIES : 1. Production planning & control. 2. To achive production target from supervisor & oprators. 3. To arrange the minimum man power for production. 4. To arrange the vehicle for dispatch. 5. Check thickness of raw material. (Not more than 0.97 mm ) 6. Check quality of raw material. 7. To carry daily & Weekly preventive maintenance. 8. To arrange the maintenance spares from party. 9. To plan shut down maintenance. 10. To do house keeping. 11. Workers & supervisors training. 12. To monitor the power factor. 13. To do the dispatch of finish goods to arrange the vechicle & manpower. 14. To manage the man power for production & other related activities. 15. Co-ordinate with tool room. 16. Maintain production report.

Name : Raghunath R. Patil.


JOB RESPONSIBILITIES : 1. To carry daily maintenance activities. 2. To arrange the maintenance spares from the party. 3. To plan the shut-down maintenance & to do the same. 4. Production planning & follow-up. 5. To do the dispatch of finish goods to arrange the vehicals, manpower for the same. 6. To manage the man power for production & other related activities. 7. To do house keeping. 8. To execute the plan changes in layout Material flow. 9. To monitor the electricity power factor. 10. To improve the overall quality of finish goods. 11. To prepare daily production report of shop. 12. To maintain the general discipline. 13. To attend customer complaints. 14. Co-ordination with die maintenance. 15. To take safety precaution & give safety training to worker.

Name : Rajkumar V. Kadam.


Dept. : Production Engineer. JOB RESPONSIBILITIES : 1. Man Power Planning. 2. Communication with previous shift supervisor about the activity done in last shift. 3. Taking dispatch schedule of Laxmi body Pvt. Ltd.& Yashshree Press Compo Pvt.Ltd. 4. To maintain house keeping. 5. To achieve production as per planning & schedule. 6. To maintain optimum quality of parts. 7. To solve minor electrical & macanical maintenance of machines. 8. To solve minor defects regarding tools. 9. If any problem coming in dies & machines gives tool repair requisition & machine repair requisition to the incharge of this department. 10. To complete the dispatch in night shift. 11. To give feed back to the store department for requirement of raw material. 12. Reporting of daily production report to plant incharge. 13. Giving helping hand to store department for dispatch & finish goods. 14. Reducing inprocess rejection. 15. Disposing of scrap by correct way.

Name : Shaikh Mohd. Gons Moin.


Dept. : Production Supervisor. JOB RESPONSIBILITIES : 1. Allotting the workers on the work. 2. Communicating with the previous shift supervisor about the production planning. 3. Run the production as per schedule 4. To achieve the opration targets & every time tries to improve the same. 5. To up-date the house keeping & taking care of scrap removal. 6. To do on line inspection. 7. Die setting. 8. If necessary Crain operating for material handling & die setting. 9. Inword the loading & unloading the finish goods for dispatch. 10. To give feedback to the store department for raw material & consumables. 11. To inform the die repair department about the problems related to the dies. 12. To give feedback to the maintenance department about the machines problems. 13. To do minor die maintenance like stopper resetting & grinding etc. 14. To inform to the plant in charge about the occurrence of any problems. 15. To report about the production. 16. Plan the production for next shift, discussion with the plant in charge.

Name : Kayande Shirish Prabhakarrao.


Desn. : Production Supervisor. JOB RESPONSIBILITIES : 1. Man power planning. 2. Production planning as per schedule 3. Inspection of the machines parameter. 4. Die setting. 5. Monitoring the production as per norms & setting new norms of production. 6. Reducing in process rejection. 7. Doing minor mechanical & electrical maintenance of machines 8. Minor tool maintenance. 9. Giving feed back to tool maintenance department regarding quality problem & productivity of tool. 10. Giving feed back to m/c maintenance department. 11. Giving feed back to stores department & finish good & raw material stock. 12. Procuring raw material for daily production from stores. 13. Maintain house keeping & disposing of scrap by correct way. 14. Reporting of daily production report to plant in charge. 15. Giving helping hand to stores department for dispatch of finish goods.

Name : Sanjay Dhaitidak.


Dept. : Quality assurance. JOB RESPONSIBILITIES : 1. Check ok parts opening balance. 2. Check rejection parts lying near machines. 3. Check rejection part entry on DPR. 4. Make arrangement to collect rejection parts at GC table. 5. Analysis defect part wise & mention if an part along with date, shift, operation & operators name. 6. Organized QC table meeting at 11.30 a.m. 7. Enter QC table data in formats prepare scrap note in given format in duplicate. 8. Prepare scrap note in given format in duplicate. 9. Hand over scrap parts to store along with one scrap note. 10. Return reworkable 11. Parts to concern shops. 12. Take round in shop after every half hour to check quality & take necessary steps. 13. Check component being dispatch. 14. Preparing charts, PDI. 15. Visiting to other companies for getting feedback. 16. Daily discussion with supervisors regarding burning problems in company.

Name : Santosh S. Nalle.


Desn. : Production Supervisor. JOB RESPONSIBILITIES : 1. Man power planning. 2. To maintain house keeping. 3. Taking dispatch schedules of party. 4. Production planning as per schedule. 5. Reducing in process rejection. 6. Doing minor mechanical & electrical maintenance. 7. Giving feed back to tool maintenance dept. regarding quality problem & productivity of tool. 8. Monitoring the production as per target. 9. Reporting of daily production report to production in-charge. 10. Helping to store department, dispatch & finish goods. 11. Requiring raw material for daily production from stores. 12. Communication with previous shift supervisor about the activities in last shift. 13. Disposing of scrap by correct way. 14. If any problem in night shifts minor tool and machine maintenance.

Name : B.D.Ronge.
JOB RESPONSIBILITIES : 1. First reading of positive report of first shift noted in log book. 2. If any problem noted try to solve it. 3. Observation or checking at 400T glasnost press as oil level, leakages, inter connecting pipe lines, oil filter on/ off, cylinder leakage, oil temperature, voltage etc. 4. 200T machines in operating condition observation for some time. 5. 100T & 63T& light duty press all under observation. 6. Compressor unit under observation. 7. Cooling tower case taken about it. 8. If any die opened try to understand problem & its solution. 9. Welding guns under observation. 10. If any problem occurs try to solve it. 11. If any big problem & trouble occurs I give information about the problem to Mr.Chilatre sir or Mr.Patil sir I work under their guidance. 12. 400T glasnost m/c control panel under observation. 13. To attened preventive & breakdown maintenance.

Name : Abhay R. Jadhav.


Dept. : F E Body Line (Production ) JOB RESPONSIBILITIES : 1. At the start of the shift work allotment to each man. 2. Arrangment of raw material, follow up of raw material, issue of consumable items from store. 3. Checking the quality of in word material, which is getting from in house press shop or from other parties for F E Body. 4. Checking the parameter of each and every machine as per standard, as the work start of the shift. 5. Supervision for all the production activity involved in FE Body production. 6. Checking in process body quality. 7. Controlling online material rejection. 8. Solving minor mechanical or electrical maintenance problems. 9. Informing to maintenance department in case of serious problem. 10. Attended the quality problem regarding FE Body. 11. Keeping records of the FE body line workers. 12. Daily checking the stock list of FE body raw material. 13. Informing to press shop about the shortage of raw material. 14. Reporting to unit in charge about production, stock, shortage for next day at the end of shift daily. 15. Attending quality problems from BAL and taking care that if should not be repeated. 16. To maintain the productivity of each stapes of FE Body line. 17. To maintain house keeping of FE body line. 18. To maintain discipline of workers regarding lunch time & tea time. 19. To take safety precaution on line during working so that accident should not happened. 20. Controlling consumable items. 21. To control sub assembly stock. 22. To reduce material handling to streamline body line. 23. To provide training to new operators. 24. To keep record of daily production & dispatch.

Name : Rajesh j. Mundhe.


Dept. : F E Body Line. JOB RESPONSIBILITIES : 1. Firstly putting in time. 2. Seeing total number of manpower present & their timing. (in time) 3. Adjusting man-machines balancing. 4. Regarding anybody absent or late worker informing to contractor & Naik sir. 5. At the time of starting machines firstly checking the spot wheather it is ok or not. 6. This checking

Name : C.A. Gawande.


Dept. : F.E. Body Production. JOB RESPONSIBILITIES : 1. Firstly set the man power at all stages. 2. Check all m/c before start the production to runs m/c effectively. 3. Then production planning according to BAL schedule. 4. Check the raw material according to production planning ; if not I inform to store department. 5. In case of down time due to maintenance or material shortage I cover the body loss at shift end. 6. If m/c occurs maintenance problem I inform to maintenance department & take initial action to solve the problem. 7. At any cost we never bear body loss due to down time. 8. If any quality problem occurs personally I go there & solve it at right there. 9. In case of major problem which I cant solve I inform to G.M. 10. Our first most intention is to cover maximum scheduled quantity in 1st shift it self. 11. Take very quick action on any customer complient (BAL) & motivate opretors in that direction to satisfy the customers. Main Activities : 1. Our production team have increased production up to 185 bodies in IInd shift since last 2 month & IIIrd shift 135 bodies. 2. Set FE body line at unit 2, Khandewadi effectively. 3. We have improved FE body quality & there is no any customer complaint from 1 month. 4. I have cleared all rejection parts ( i.e. front panel, 49 & 50 Panel, leg noom panel, side panel, & floes panel assly.) & in future I will take care to avoid any type of rejection.

Name : Govind Biradar.


Desn : Accounts & Excise Assistant.

JOB RESPONSIBILITIES : 1. Taking invoice schedule of Yashwant Industries, Jatmetal, Sangram Auto Pvt. Ltd.& Other parties. A. To confirm the given schedule. 2. B. C. D. E. F. G. Sales invoice feeding & print it . Tally the print with sale invoice. Quantity to be check. Check the item number. Check the rate. Check the invoice excise duty. Check the sale tax & total value check. to the party & check the purchase bill & job work party received stamps. 4. All Purchase bills GRN feeding & print. B. Check GRN quantity & Purchase bill Quantity. C. Shortage check. 5. Purchase bill passing voucher. B. Tally, bill passing rate & purchase rate. C. Feedback to account department for purchase order. D. Sanction the purchase bill from A.P.Naik & Kank sir. E. To send all purchase bill to head office ( Unit II ) 6. 7. 8. 9. 10. 11. 12. Physically check the all purchaseing material of unit II. Daily dispatch report only send to Mr. Manoj Kank Sir. Check the office stationary. All purchases bills excise duty check & modvat cradit entry in STK. Make the salary statement of labour staff. To check all transport bills, monthly basis. Check the dispatch schedule.

3. Collect the raw material purchase bill from Yashwant Ind. Then prepare 57 F (4) challan

Name : Ashok B. Kulkarni.


Dept. : Excise Assistant. JOB RESPONSIBILITIES : 1. To give dispatch schedule from Yashwant Ind.& Jet Metal to prepare invoices. 2. While completed the sales invoices then taken sales entries in RG 1 stock register. 3. Collect the raw material purchases bill from Yashwant Ind., then prepare 57 F (4 ) challans to the party. 4. Check the purchase bills. (Party name, Value etc. ) 5. Prepare GRN of raw materials purchase bill & bill passing vouchers. 6. Taken the modvat in our excise systems. 7. Rejection received from BAL entries taken in D3 books. 8. Dabit note ( BAL rejection ) clearation. 9. Calculation of excise duty of sales invoices. 10. RG 1 book tally with stock & completed RT 12. (Month end)

Name : R.P.Bhalerao. JOB RESPONSIBILITIES : 1. Preventive maintenance of dies. 2. Preventive maintenance record. 3. Daily production & corrective action. 4. Production analysis & corrective action. 5. To maintain spares of dies & fixers. 6. Man power utilization record. 7. 5s activities in department. 8. Quality & productivity improvement works. 9. Tooling consumption record. 10. Daily machine utilization & record.