You are on page 1of 10

Site Test Report For Differential Protection

Customer SEC-SOA Extension of Muhayil Project S/S 132/33 KV Location MUHAYEL RELAY DETAILS
RELAY ANSI NO. RELAY MAKE TYPE / STYLE S. NO. 87T SIEMENS
7UT612

Contract # Job # Equipment Tag

40631024/00

6T1

RELAY FUNCTION NOMINAL CURRENT AUX SUPPLY VOLTAGE

TRANS. DIFF 1A 60-125VDC

1-VISUAL AND MECHANICAL INSPECTION:


CHECK NAME PLATE DATA ACCORDING TO THE DRAWING CHECK FOR TRANSPORTATION DAMAGE AND CORRECT POSITION VERIFY TIGHTNEES OF EXTERNAL WIRING
O.K O.K O.K

2-ELECTRICAL CHECKS:
ALL CONNECTIONS CHECK ACCORDING TO WIRING DIAGRAM AUX.SUPPLY CHECKED FOR RATING AND POLARITY CASING EARTHING CHECK All 7 programmable LEDs apply Test LEDs under Test mode (Hardware test).
O.K O.K

O.K

OK

Remarks Test Inst. Used Tested By Shokry


Date: 20/07/09 Signature:
FREJA300

Name: Eng.

Mohamed

Witnessed By

Name: Eng .ALI Al AMRI Date: Page 1 of 10

Site Test Report For Differential Protection


Customer SEC-SOA Extension of Muhayil Project S/S 132/33 KV Location MUHAYEL Contract # Job # Equipment Tag 6T1 40631024/00

3- TRANSFORMER DATA: RATIO: 132/13.8KV MVA: 67 MVA H.V SIDE VOLTAGE: 132KV L.V SIDE VOLTAGE: 13.8KV GROUP NO: DYN1 FREQUNCEY: 60 HZ H.V SIDE C.T RATIO: 500/1 H.V SIDE C.T RATIO: 3000/1 IMPEDENCE VOLTAGE: 14% H.V CALCULATED FULL LOAD CURRENT: 293.0 A = 0.586 A (sec value) LV CALCULATED FULL LOAD CURRENT: 2803.0 A = 0.934 (sec value)

*** Full load current= Trans MVA/Root of 3* KV

Remarks Test Inst. Used Tested By Shokry


Date: 20/07/09 Signature:
FREJA300

Name: Eng.

Mohamed

Witnessed By

Name: Eng .ALI Al AMRI Date: Page 2 of 10

Site Test Report For Differential Protection


Customer SEC-SOA Extension of Muhayil Project S/S 132/33 KV Location MUHAYEL Contract # Job # Equipment Tag 6T1 40631024/00

4. INPUT OPTO-ISOLATORS CHECKS (With Relay Energized): GO TO TEST MODE (HARDWARE TEST) FOR CHECKING STATUS OF INPUTS OPTO INPUT NO. OPTO 1 OPTO 2 OPTO 3 TEST METHOD (Energize only one at a time by soft ware) ENERGIZE BI 1 (High) ENERGIZE BI 2 (High) ENERGIZE BI 3 (High) RESULT Display 0 to 1 OK OK OK REMARKS

Spare Spare Spare

5. OUTPUT RELAYS CHECKS (With Relay Energized): RESULT Contact Checked OK OK OK OK

OUTPUT RELAY No.

TEST METHOD (Energize only one at a time by soft ware) CONTACT OPERATED F6-F7 (N/O) CONTACT OPERATED F8-F9 (N/O) CONTACT OPERATED F10-F11 (N/O) CONTACT OPERATED F12-F13 (N/O)

REMARKS

RL1 RL2 RL3 RL4

Relay trip

Spare Spare Spare

Remarks Test Inst. Used Tested By Shokry


Date: 20/07/09 Signature:
FREJA300

Name: Eng.

Mohamed

Witnessed By

Name: Eng .ALI Al AMRI Date: Page 3 of 10

Site Test Report For Differential Protection


Customer SEC-SOA Extension of Muhayil Project S/S 132/33 KV Location MUHAYEL Contract # Job # Equipment Tag 6T1 40631024/00

6- PICK UP TEST IDIFF> :


CALCULATED
I D>

KVG 1.0 1.0 1.0 1.73 1.73 1.73

PH A
D.O 0.103 0.205 0.410 0.287 0.567 1.134
TRIP
0.147 0.293

PH B
D.O
0.104 0.207

PH C
D.O TRIP P.U D.O

TRIP 0.147 0.293 0.586 0.41 0.810 1.620

P.U 0.125 0.249 0.498 0.35 0.688 1.377

P.U
0.126 0.250

TRIP

P.U

CT INPUT 1
(HV Side)

0.25

0.146
0.292

0.123
0.248

0.102
0.205

0.147
0.293

0.1 25
0.25 0

0.102
0.207

0.5 1.0

0.586
0.403

0.502
0.342

0.413
0.285

0.586
0.403

0.497
0.344

0.410
0.286

0.586
0.401

0.49 8
0.34 5

0.411
0.285

CT INPUT 2
(LV Side)

0.25

0.5 1.0

0.810 1.621

0.689 1.374

0.567 1.138

0.806 1.619

0.684 1.381

0.567 0.139

0.807 1.613

0.68 5 1.37 7

0.570 1.134

Select any Phase in HVS and inject current until pickup led then go up until trip contact operate then go down again tell the pickup led disappear for delta winding program the O/P contact for each phase you test every time TRIP = IDIFF>* Kvg*In Trans /In CT TRIP h.v = IDIFF>*1.0* 293/(500/1)= 0.586*IDFF> A TRIP l.v = IDIFF>*1.73* 2803/(3000/1)= 1.62*IDFF> A P.U =85% TRIP VALUE D.O =70% TRIP VALUE 7- TIMING TEST (adress1625): SETTING TIME (S) 0.0 Remarks Test Inst. Used Tested By Shokry
Date: 20/07/09 Signature:
FREJA300

MEASURED TIME @ 2 Is
A H.V L.V H.V B L.V H.V C L.V

37.8ms

37.9ms

39.9ms

37.2ms

38.3ms

34.3ms

Name: Eng.

Mohamed

Witnessed By

Name: Eng .ALI Al AMRI Date: Page 4 of 10

Site Test Report For Differential Protection


Customer SEC-SOA Extension of Muhayil Project S/S 132/33 KV Location MUHAYEL RELAY INHERENT TIME = 35 ms Contract # Job # Equipment Tag 6T1 40631024/00

8- PICK UP& TIMING FOR IDFF>> :


I DIFF>> SETTING CT INPUT 1
(HV WINDING)

Kvg

CAL. Trip (A)

Trip value (A) Ph A Ph B Ph C

TRIP TIME @ 2 Is (ms) Ph A Ph B Ph C

1.5 In 1.5 In

1.0 1.73

0.879 2.43

0.87 9 2.41 8

0.876 2.418

0.878 2.425

27 27

27.4 27.4

28.4 27.6

CT INPUT 2
(LV WINDING)

Change the setting for I DIFF> to be 2 In then make pick up for I DIFF>> or make another contact for
I DIFF>> only

Pick up = I diff>> * Kvg * In trans/ In CT Trip hv = IDIFF>*1.0* 293/(500/1)= 0.586 *IDFF>> A Trip l.v = IDIFF>*1.73* 2803/(3000/1)= 1.62*IDFF>> A P.U =85% TRIP VALUE D.O =70% TRIP Value RELAY INHERENT TIME = 25 ms

Remarks Test Inst. Used Tested By Shokry


Date: 20/07/09 Signature:
FREJA300

Name: Eng.

Mohamed

Witnessed By

Name: Eng .ALI Al AMRI Date: Page 5 of 10

Site Test Report For Differential Protection


Customer SEC-SOA Extension of Muhayil Project S/S 132/33 KV Location MUHAYEL Contract # Job # Equipment Tag 6T1 40631024/00

9- Slop (Bias) Test: I: slope 1 Slope1 0.25 M 0.5 1 1.5 I1 (source1) I2 (source2) 0.293 0.586 0.879 0.81 1.62 2.43 Operating angle (Either one source) 27.9 27 27.7 Measured slope 0.24 0.24 0.23

Slope calculation: Slope = [A2 + B2] 1/2 2xM A = [M - M x cos ] B = M x sin

I1= Kvg *M* I nsec W1 = 0.586 M where M constant , Kvg = (1.0) Ph-N I2= Kvg *M* I nsec W2 = 1.62 M where M constant , Kvg = (1.73) Ph-N The calculated slope 1 should be with in +-10% of setting

Inject same phase (L1) to High side & low side by stable current in table with phase shift 180 and increase the angle of HS till Trip then calculate the slop by this angle

Remarks Test Inst. Used Tested By Shokry


Date: 20/07/09 Signature:
FREJA300

Name: Eng.

Mohamed

Witnessed By

Name: Eng .ALI Al AMRI Date: Page 6 of 10

Site Test Report For Differential Protection


Customer SEC-SOA Extension of Muhayil Project S/S 132/33 KV Location MUHAYEL Contract # Job # Equipment Tag 6T1 40631024/00

II: slope 2 : Slope2 0.50 M 1 1.5 2 I1 (source1) I2 (source2) 0.586 0.879 1.172 1.62 2.43 3.24 Operating angle (Either one source) 59 58 51.1 Measured slope 0.49 0.48 0.34

Slope calculation: Slope = [A2 + B2] 1/2 2xM A = [M - M x cos ] B = M x sin

I1= Kvg* M* In sec W1 = 0.586 M where M constant , Kvg = (1.0) Ph-N I2= Kvg* M* In sec W2 =1.62 M where M constant , Kvg = (1.73) Ph-N The calculated slope 2 should be with in +-10% of setting

*** To test slope 2 base point to shifted to origin.

Inject same phase(L1) to High side & low side by stable current in table with phase shift 180 and increase the angle of HS till Trip then calculate the slop by this angle

Remarks Test Inst. Used Tested By Shokry


Date: 20/07/09 Signature:
FREJA300

Name: Eng.

Mohamed

Witnessed By

Name: Eng .ALI Al AMRI Date: Page 7 of 10

Site Test Report For Differential Protection


Customer SEC-SOA Extension of Muhayil Project S/S 132/33 KV Location MUHAYEL Contract # Job # Equipment Tag 6T1 40631024/00

10- HARMONICS CHECK: I 2nd HARMONICS : SETTING % 15 INJECTED CURRENT (A) 1 HV TRIP
<16%

LV TRIP
<16%

BLOCK
>16%

BLOCK
>16%

REMARKS -

By Freja Remote mode (Edit curve) Inject 1A Have fundamental + 10 % of 2nd Harmonic and increase the value of harmonic in curve till Block II 5TH HARMONICS : SETTING % 30 INJECTED CURRENT (A) 0.4 HV TRIP
<30%

LV TRIP
<30%

BLOCK
>30%

BLOCK
>30%

REMARKS -

By Freja Remote mode Inject 0.4A Have fundamental + 10 % of 5nd Harmonic and increase the value of harmonic in curve till Block (Injection current must not excised the( limit IDIFF max of n-th harm-Restrain) setting Remarks Test Inst. Used Tested By Shokry
Date: 20/07/09 Signature:
FREJA300

Name: Eng.

Mohamed

Witnessed By

Name: Eng .ALI Al AMRI Date: Page 8 of 10

Site Test Report For Differential Protection


Customer SEC-SOA Extension of Muhayil Project S/S 132/33 KV Location MUHAYEL Contract # Job # Equipment Tag 6T1 40631024/00

11-Cross Blocking 2nd Harmonics adress1612: Procedure: 1. Inject two different phase at same time at one side 2. Phase A>Id with fundamental harmonics 3. Phase B>Id with 2nd harmonics 4. 1 Cycle=60HZ=1/60 =0.01666 sec Time set in (Cycles) 0.0 125 250 500 1000 Time set in (s) 2.075 4.15 8.3 16.6 Time measured (s) 126.3

Remarks Test Inst. Used Tested By Shokry


Date: 20/07/09 Signature:
FREJA300

Name: Eng.

Mohamed

Witnessed By

Name: Eng .ALI Al AMRI Date: Page 9 of 10

Site Test Report For Differential Protection


Customer SEC-SOA Extension of Muhayil Project S/S 132/33 KV Location MUHAYEL Contract # Job # Equipment Tag 6T1 40631024/00

Table 6: Correction Factor for 87-Itrip(Wx)

Notes: 1. For this table, 0 is considered even. 2. Use this row if the I0Process setting for the tested winding is I0 Elimination. The settings are Address 1106 for Winding 1, Address 1126 for Winding 2, and Address 1146 for Winding 3. 3. Use this row if the I0Process setting for the tested winding is either without or I0 CORRECTION. The settings are Address 1106 for Winding 1, Address 1126 for Winding 2, and Address 1146 for Winding 3.In tests 1-3 current is injected in one phase at any time; therefore, use the rows for 1-phase faults. The other fault types are given if the user wishes to expand the tests.

Remarks Test Inst. Used Tested By Shokry


Date: 20/07/09 Signature:
FREJA300

Name: Eng.

Mohamed

Witnessed By

Name: Eng .ALI Al AMRI Date: Page 10 of 10