PROJECT JOB NO. LOCATION SLAB TYPE PREPARED BY A.

LOADINGS Self-weight of slab total SDL Brickwall Dead Loads Live Loads Design Loads

: : : : :

NUS Business School S7131 LvL 03/04 One Way Slab WTJ

(Do u b le Slab )

= = =

2.88 3.00 0.00 5.88 5.00

KN/m2 KN/m2 KN/m2 KN/m2 KN/m2

1 denotes discontinuous # denotes continuous 1900

= 16.23

KN/m2

(Downward) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

B.

INPUT DATA fcu fy h lx c1 Ds ds = 40 N/mm2 = 460 N/mm2 = 120 mm = clearspan+ wall thkness = 1900 mm = 32 mm = 13 mm = h - c1 - Ds/2 81.5 mm

Thickness of slab Short span, Concrete cover, Dia.of reinf.in short span Effect. depth in short span

C.

REINFORCEMENT SHORT SPAN Hogging Moment Sagging Moment

M M k zx

= = = = = =

Design loads * (lx^2 / 8 or coeff. from Table 3.13) 16.232 * na = 0.00 KNm 16.232 * 0.451 = 7.32 KNm 0.028 0.95*ds or 0.97 * ds whichever is smaller 77 mm or 0.13% of bh (one face - tensile)

Required, Hogging Moment Sagging Moment Provide, Hogging rebar Sagging rebar LONG SPAN Min. rebar 0.13% of bh Provide,

Asx Asx

= Msx/0.95*fy*zs = 156 mm2/m = 216 mm2/m

Asx Asx

= =

201 393

mm2/m mm2/m

T T

8 10 -

250 c/c 200 c/c

Support Midspan

O.K O.K

Other types A10

Asy

= =

156 201

mm2/m Tensile face T mm2/m

8 -

250 c/c

Midspan Top & Bottom

O.K

D.

DEFLECTION Actual, Allowable,

lx/ds lx/ds

= = =

23.3 20 37.5

1.88 satisfactory

E.

SHEAR STRESS Shear stress in short span

= = 100Asx/b/ds = vcs =

vs

V / b * ds 0.19 N/mm2 0.25 vc*(fcu/30)^1/3 0.69 N/mm2

< 0.8*sqrt(fcu)

satisfactory

> vs

satisfactory

PROJECT JOB NO. LOCATION SLAB TYPE PREPARED BY A. LOADING Self-weight of slab total SDL Brickwall Dead Loads Live Loads Design Loads B. INPUT DATA

: : : : :

RESIDENTIAL BUILDING TWO-WAY SLAB BEDROOM Two Way Slab RSA

(Double Slab)

0.33 = = = 3.00 2.10 0.00 5.10 2.00 10.3 KN/m2 KN/m2 KN/m2 KN/m2 KN/m2 KN/m2 3.38 fcu fy h cl lx ly Ds Dl ds dl = = = = = = = = = = 21 N/mm2 276 N/mm2 125 mm 20 mm 3700 mm 4450 mm 10 mm 10 mm h-c1-Ds/2 = 100 ds - Ds = 90 1 # denotes continuous 1 denotes discontinuous 0.39 0.39

= =

0.33 SLAB SHEAR FORCE COEFFICIENT

Thickness of slab Top & bottom cover Short span Long span Dia. of reinf. in short span Dia. of reinf. in long span Effect.depth in short span Effect. depth in long span C. REINFORCEMENT SHORT SPAN Hogging(-ve) Sagging(+ve)

1 msy

3.1

mm mm

msx 1

Msx Msx k zx Asx Asx Asx Asx Msy Msy k zy

= = = = = = = = = = = = =

0.000 * 0.074 * 0.050 0.95*ds OR

13.7 13.7

* *

10.3 10.3

= =

0.00 10.44

KNm KNm 94 mm

0.94 *ds whichever is smaller = or 0.13% of bh (one face)

Required Hogging(-ve) Sagging(+ve) Provide LONG SPAN Hogging(-ve) Sagging(+ve)

Msx/0.87*fy*zs 163 mm2/m 423 mm2/m 524 mm2/m 524 mm2/m 0.000 0.056 0.038 0.95*dl * * or 13.7 13.7

T T * * 10.3 10.3

10 10 = =

150 150 0.00 7.90

Support Midspan KNm KNm 86 mm

O.K O.K

0.96 *dl or

whichever is smaller = 0.13% of bh (one face)

Required Hogging(-ve) Sagging(+ve) Provide D. DEFLECTION Actual Allowable E. SHEAR STRESS SHORT SPAN 100Asx/b/ds = LONG SPAN 100Asy/b/dl = 0.58 0.52

Asy = = Asy = Asy = Asy = lx/ds = lx/ds =

My/0.95*fy*zy 163 mm2/m 352 mm2/m 393 mm2/m 524 mm2/m 37.0 20

T T

10 10

200 150

Support Midspan

O.K O.K

2.00

39.9

satisfactory

Vs vs vcs Vl vl vcl

= = = = = = = =

0.39 * 10.3 0.15 N/mm2 vc * (fcu/25)^1/3 0.70 N/mm2 0.33 * 10.3 0.14 N/mm2 vc * (fcu/30)^1/3 0.70 N/mm2

* 3.70 = < 0.8 * (fcu)^0.5 > vs * 3.70 = < 0.8 * (fcu)^0.5 > vl

14.84

KN/m

No shear reinft. required 12.74 KN/m

No shear reinft. required

PROJECT JOB NO. LOCATION SLAB TYPE PREPARED BY A.

: : : : :

NUS Busimess Sch S7131 LvL 1 Cantilevered slab AHT

LOADINGS Self-weight of slab total SDL Dead Loads Live Loads Design Loads

= = = =

3.36 3.00 6.36 1.50 11.30

KN/m2 KN/m2 KN/m2 KN/m2

1 denotes discontinuous # denotes continuous 1450

KN/m2

B.

INPUT DATA fcu fy h lx = = = = = = = = 35 N/mm2 460 N/mm2 140 mm length mm 0.5 d + 1450 mm 20 mm 10 mm h - c1 - Ds/2 115.0 mm

Thickness of slab Short span,

Concrete cover, c1 Dia.of reinf.in short span Ds Effect. depth in short span ds C. REINFORCEMENT SHORT SPAN Hogging Moment

M k zx

= Design loads * (lx^2 / 2 ) = 11.304 * 1.051 = 11.88 KNm (ULS) = 7.86 * 1.051 = 8.26 KNm (SLS) = 0.026 = 0.95*ds or 0.97 * ds whichever is smaller = 109 mm = Msx/0.87*fy*zs = 272 mm2/m = = = = = = = = = = = 524 524 182 524 12.6 7.0 14.0 mm2/m mm2/m or 0.13% of bh (one face - tensile)

Required, Hogging Moment Provide, Hogging rebar Bottom rebar LONG SPAN Min. rebar 0.13% of bh Provide, D. DEFLECTION Actual, Allowable,

Asx

Asx Asx

T T

10 10 -

150 c/c 150 c/c

Support Midspan

O.K O.K

Asy lx/ds lx/ds

mm2/m Tensile face T 10 mm2/m

150 c/c

Midspan

O.K

2.00 satisfactory

E.

SHEAR STRESS Shear stress in short span vs 100Asx/b/ds vcs

V / b * ds 0.14 N/mm2 0.46 vc*(fcu/30)^1/3 0.74 N/mm2 kN/mm2 kN/mm2 mm mm mm N/mm 2 mm mm mm mm

< 0.8*sqrt(fcu) > vs Modulus ratio, m =

satisfactory satisfactory

F.

CRACK WIDTH CHECK Concrete, Ec = 14 Steel, Es = 200 cmin = 25 Effective depth, d = 115 Neutral axis, x = 34.67 steel stress = 152.6 a' = 160 acr = 148 y = 80.33 e1 = 8E-04 em = 2E-04 crack width = 0.032

14.3