279 KNm

P F

NP P P P 3 0a C 400 =1.5x9. 400x 400 13 High High P P P BedT Existin W Existing Lateral b River Point

Wind load calculations: Local Standard For post disaster , wind zone -3 area, for wind Basic wind speed = 38m/s Table 3-1 CP-3 Chapter v Vs= Vx S1 x S2 x S3 Topography factor S1 Statistical factor S3 = = 1 1

Ground roughness factor S2: Ground roughness : Class 4 (Surface with large and frequent obstructions) Building class : B ( Neither the greatest horizontal dimension nor the greatest verticle dimension exceeds 50m.) Dynamic pressure of the wind (q) = K.Vs
2 Local Standard K=0.59 N/m For Sri Lanka for wind Wind force (F) = Cf . q. Ae 2

CP-3 Chapter v Table 10

Force coefficient (Cf) b= 30.55 m l= 30.55m d= 24.1m w= 24.1m

l/w

= 30.55/24.1 = 1.27 = 30.55/24.1 = 1.27

b/d

height/ breadth Cf

= 40/24.1 = 1.66 = 0.98

Specimen calculation for First floor level: Height Hence S2 factor Vs q F = = = = = = = = 4.7m 0.55 38x1x0.55x1 20.9 m/s 0.59x(20.9)2 2 257.7 N/m 0.98x257.7x(3.5x5.9) 5.21kN

Similarly wind forces at every floor level could be calculated.

Project : Dahampaya
DESIGN UNIT D EPC DIVISION E CENTRAL ENGINEERING CONSULTANCY BUREAU C 279 KNm P F

Feature Designed Checked Job Code

Frame Analysis Date Date


NP P P P 3 0a C 400 =1.5x9. 400x P 13 High High P 400 P BedT Existin W Existing Lateral b River Point
4 1 8

D-676
6
6

4 1 8

4 1 0 8 0 0 0 ( a ( p a p r p o r x o . x ) . )

Reference

Calculation

Output

Page

04 of 08

4 1 0 8 0 0 0 ( a ( p a p r p o r x o . x ) . )

279 KNm

P F

NP P P P 3 0a C 400 =1.5x9. 400x P 13 High High P 400 P BedT Existin W Existing Lateral b River Point

Wind forces at roof: CP-3 Chapter v Table 8 Pressure co-efficents Cpe for pitch roofs: Roof pitch 40 h/w = 1.66

( 3/2 <(h/w)<6)

The critical condition applies to the frame, when =0 Cpe facotrs for the roof

A -0.2

-0.5

Appendix E

Assume four faces equally permeable Wind force (F) = (Cpe- Cpi). q. Ae (Cpe- Cpi) factors
A 0.1 B -0.2

Cpi =

0.3

Wind force on roof "A"

= 0.1x604.2x (9.15 ) = 5.05 kN


2 = (-0.2)x604.2x (9.15 ) = (-10.1) kN

Wind force on roof "B"

5.05kN

10.1kN

Resultant horizontal force at roof ( R ) = 5.05 cos 40 + 10.1sin 40 = 10.36kN The calculated wind forces for the frame could be summarized as follows.
Project : Dahampaya
DESIGN UNIT D E C EPC DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU

Horizontal force from roof = 10.4kN


Date Date

Feature Designed Checked Job Code

Frame Analysis

D-676

4 1 8

4 1 0 8 0 0 0 ( a ( p a p r p o r x o . x ) . )

Reference

Calculation

Output

Page

05 of 08

279 KNm

P F

NP P P P 3 0a C 400 =1.5x9. 400x P 13 High High P 400 P BedT Existin W Existing Lateral b River Point

Floor Level

H (m) 1.2 4.7 8.2 11.7 15.2 18.7 22.2 25.7 30.7

S2

Vs (m/s) 19.76 20.9 22.4 23.94 26.22 27.74 29.26 30.4 32

q 2) (N/m 230.4 257.7 296 338.1 405.6 454 505.1 545.2 604.2

Ae 2) (m 17.4 20.65 20.65 20.65 20.65 20.65 20.65 25 14.75

F (KN) 3.93 5.21 5.99 7 8.2 9.19 10.2 13.3 8.7 + 10.4 = 19.1

Ground First Second Third Fourth Fifth Sixth Seventh Eighth+roof

0.52 0.55 0.59 0.63 0.69 0.73 0.77 0.8 0.84

Frictional Drag: h b d d/h d/b = Height to the eaves = Dimension normal to wind = Dimension in wind direction = (24.1/40) = (24.1/30.55) = = 0.6 < 0.8 < = 40m = 30.55m = 24.1m 4 4

Frictional drag is not neccesary.

Project : Dahampaya
D E C DESIGN UNIT EPC DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU

Feature Designed Checked Job Code

Frame Analysis Date Date D-676 Page

4 1 8

4 1 0 8 0 0 0 ( a ( p a p r p o r x o . x ) . )

Reference

Calculation

Output

06 of 08

279 KNm

P F

NP P P P 3 0a C 400 =1.5x9. 400x 400 13 High High P P P BedT Existin W Existing Lateral b River Point

Notional Horizontal load Specimen Calculation of Notional horizontal loads for frame 7 (A-K): Consider first floor level: Weight of beams (0.3x0.375x(20+26.85)x24) + (0.225x0.4x4.1x24) Weight of slab (0.15x24x(47.2+14.6) + (0.175x24x5.9x7.5) + (0.125x24x2x1.6) Weight of finishes (1x(91.5+14.6+3.2)) Weight of Brick walls (5.2x2.95x(5.9+2.65+8.6+3.6)) Weight of Columns (0.5x0.5x24x3.5x5)+(0.3x0.3x24x3.5) Total

135.3kN

418kN

109.3kN

318.3kN

= =

112.5kN 1093.4kN

Therefore Notional horizontal load at First Floor level = 0.015x 1094 kN = 16.4kN Simillarly Notional load for other floor levels also calculated. Comparison of Horizontal loads: Floor level Ground 1 2 3 4 5 6 7 8
Project : Dahampaya
D E C DESIGN UNIT EPC DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU

Notinal Load = 16.4 kN

Wind Force KN 3.9 5.2 6 7 8.2 9.2 10.2 13.3 20.3

1.2Wk 4.68 6.24 7.2 8.4 9.84 11 12.2 16 24.4

1.4Wk 5.5 7.3 8.4 9.8 11.5 12.9 14.3 18.6 28.5
Feature Designed Checked Job Code

NHL 24 16.4 16.4 16.4 16.4 15 15 16 18.5


Frame Analysis Date Date D-676 Page

4 1 8

4 1 0 8 0 0 0 ( a ( p a p r p o r x o . x ) . )

Reference

Calculation

Output

Notional loads Critical

Wind loads Critical

07 of 08

279 KNm

P F

NP P P P 3 0a C 400 =1.5x9. 400x 400 13 High High P P P BedT Existin W Existing Lateral b River Point

After finding verticle and horizontal loading for the frame, frame analysis was done using "Etab" software.Relevant Input and output files are attached here with.

Project : Dahampaya
D E C DESIGN UNIT EPC DIVISION CENTRAL ENGINEERING CONSULTANCY BUREAU

Feature Designed Checked Job Code

Frame Analysis Date Date D-676 Page

4 1 8

4 1 0 8 0 0 0 ( a ( p a p r p o r x o . x ) . )

Reference

Calculation

Output

08 of 08

=1.5x9.

1.267634855

1.659751037

=1.5x9.

=1.5x9.

1.267634855

1.659751037

=1.5x9.

=1.5x9.

Notional

=1.5x9.

Reference

Calculation

Outputs

Project
D E C DESIGN UNIT EPC DIVISION CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)

279 KNm

P F

Feature Designed Date Checked Date of Job Code Page NP P P P 3 0a C 400 =1.5x9. 400x 400 13 High High P P P BedT Existin W Existing Lateral b River Point
4 1 8

4 1 0 8 0 0 0 ( a ( p a p r p o r x o . x ) . )