WHITE TOPPING: An Excellent Solution for Pavement Rehabilitation

Dr. V. Ramachandra, Zonal Head (Tech), UltraTech Cement Ltd., Bangalore

Introduction
Concrete Roads were first built by Romans (300 BC 476 AD). They were quite innovative in the construction with the use of innovative materials viz., use of concrete, admixtures in their primitive form (like animal fat, milk & blood). lead to the adage all (concrete) roads lead to Romel.' Pozzolana' cement from the village Pozzouli near Italy, horse hairs as fibres in These roads, scientifically designed and constructed had a long life and thus

bituminous

Portland Cement Concrete (PCC) overlay on an existing pavement is commonly known as

topping. The principal purpose of an overlay is either to the


Dr. V. Ramachandra

White

restore or to increase the load carrying capacity or both, of existing pavement. In achieving this

overlays also restore the ride-ability of the existing in addition to rectifying other defects such as loss of texture. In our country,

objective,

pavements which have suffered rutting and deformations,

bituminous overlays have been popularly constructed in the past mainly due to

abundant supply of bitumen, its amenability to stage construction and manageable traffic conditions, in terms of volume and axle loads in addition to the comfort levels of construction methods among engineers. It was also making economic sense to make bituminous pavements as it was relatively

cheaper. In recent times all these advantages are reversed viz., petroleum industry is using refined processing technology leading to reduction in the production of bitumen leading to increased imports, favourable cost economics of cement concrete and rapidly changing traffic scenario (in terms of volume as

well as axle loads). In addition, rapid developments in concrete material technology and mechanization (both in concrete production & its laying) are favouring concrete overlays as a sustainable option. In recent times PPP

(Public-Private Partnership) models are becoming popular in road construction initial costs. India is currently producing about 240 million tonnes of cement

shifting the focus on selection of overlays based on life-cycle costs rather than and cement industry is quite matured and equipped to meet the challenges in suitable for making Pavement Quality Concrete (PQC).

terms of various grades of cements as well as high quality blended cements

Overlay Solutions for Rehabilitation


Type of overlays is chosen depending upon the condition of the existing pavement. Bonded overlays are preferred when the condition of existing relatively less. This is due to the fact that the pavement system behaves as a

pavement is good and the design will ensure that the thickness of overlay is composite structure, utilizing the flexural strength of flexible pavement as well. In case the pavement is already deteriorated, it can only be regarded as a cracks), a separation layer is provided. base; to separate it from the concrete overlay (in order to avoid reflective Concrete overlays have been used to rehabilitate bituminous pavements since 1918 in USA. There has been a renewed interest in whitetopping, particularly on Thin White Topping (TWT) and Ultra-Thin White Topping (UTWT) over thickness of overlay, classification is as follows: i.

Conventional White Topping. Based on the types of interface provided and the

Conventional White topping which consists of PCC overlay of thickness 200 mm or more, which is designed & constructed without consideration of any bond between existing overlay & underlying bituminous layer (without assuming any composite action).

ii.

Thin White topping (TWT) which has PCC overlay between 100 200

mm. It is designed either considering bond between overlay & underlying

bituminous layer or without consideration of bond. High strength requirement. Joints are at shorter spacing of 0.6 to 1.25 m.

concrete (M 40 or higher) is normally used to take care of flexure iii. Ultra-Thin White topping (UTWT) which has PCC overlay of less than

100 mm. Bonding between overlay & underlying bituminous layer is mandatory. To ensure this, the existing layer of bitumen is either milled or gently chiseled. Joints are provided at a spacing of 0.6 to 1.25 m. (to a depth of 25 mm) or surface scrapped (with a non-impact scrapper)

Advantages of White topping

Reduced thickness due to thickness of overlay remaining constant for over 2 decades. Fast-Track construction making use of innovations in concrete

technology & batch mixing, concretes can be designed to have 3 days' compressive (& flexural) strength, so as to open the road for traffic within 5 days of construction.

Reduced maintenance as the concrete overlays live for over 2 decades, with least maintenance. Cost-effective compared to asphalt overlays when Life Cycle Cost is taken into consideration. of vehicles. Improved service life with better riding quality, improved fuel efficiency Little pre-overlay repairs

Improvement in safety in view of the increased reflection of light flexible pavements.

particularly on city roads, it would save 24% less electricity compared to Reduction in operational costs and lower absorption of solar energy

Improving the environmental benefits as concrete roads are much greener and less polluting.

Concrete roads require lesser illumination during night

Technology Demonstration Project


In India, concrete overlays on existing flexible pavement (white topping) have been constructed in recent years in Mumbai, Nagpur, Indore among other places. In South India, several new concrete roads were constructed during the

last century which have given excellent service for over four decades, the examples being the Bangalore-Mysore road constructed by the then Maharaja expertise in white topping, these roads were converted to flexible overlays in recent times. of Mysore, the coastal roads in Kerala etc. Due to lack of experience and

With a view to familiarize with the advantages of white topping, a Technology Demonstration Project was undertaken in Bangalore jointly by the Bruhat of Karnataka and Cement Manufacturers' Association. The objective of this the advances in construction equipments and Bangalore Mahanagara Palike (BBMP), Task Force for Quality Assurance, Govt. project was to demonstrate the advantages of white topping by making use of Characterisation of the existing flexible pavement on the trial stretch on Hosur Road in Bangalore yielded the following data.

methods.

1 CBR 2 Commercial vehicles per day 3 Temp differential at Bangalore 4 Thickness of bituminous layer

5 Base (40 mm metal) thickness 6 7 8 9 Road width Length of road Concrete grade Axle load

8 to 10 1000 17.3 deg C 4 to 7 inches 4 to 9 inches 100 feet 350 m M 45 16 T

Design of Pavement and Concrete Mix


Design of the overlay was carried out using Westergaard's Equation and (including temperature stress) was obtained as 30.83 Kg/cm2 warping stress as per IRC:58 -2002 and IRC: SP: 76 2008. Total stress corresponding flexural strength requirement was 4.7 MPa. Design was done by M/s L.R. Kadiyali & Associates, New Delhi. Thickness of white topping was 150 mm. and

Concrete mix design was arrived at by evaluating trial mixes and the design mix was arrived at with a cement content of 430 kgs, fly ash 30 kgs, with a w/c ratio of 0.283, achieving a slump of 40 60 mm at site.

Details of Construction
In order to achieve the desired advantages of concrete roads, three essential conditions need to be satisfied. i.

iii.

ii.

Production of concrete in a RMC plant or in a dedicated batching plant. Using either fixed form or slip form mechanical pavers Strict quality control at site including testing of fresh, hardened and extracted specimens of concrete and tests on pavement quality.

In this project design and production of concrete was carried out by UltraTech RMC; Fixed form paver provided by M/s Allen Buildwell Pvt Ltd., was used. team of UltraTech and M/s Civil Aid Technoclinic (P) Ltd., Bangalore. Quality control at site and testing were jointly done by the Technical Services

Surface preparation and alignment of rails for paver

Paver machine in operation

Surface texturing on green concrete

Spraying of curing compound on fresh concrete

Salient features of Construction


i. Surface preparation: In case of TWT, bond between PCC overlay & existing bituminous pavement is atleast partly desirable; in case of UTWT, effective bond is essential. To ensure this any of the following method can be adopted.
o

Milling the existing bituminous surface to obtain a uniform surface. Milling can be used to remove surface distortion like cracks in the top portion and adjust cross slopes. Thickness of milling usually is in the range of 25 to 50 mm.

Surface scrapping is carried out on bituminous surfaces which are quite hard. This can be for a depth of 10 mm and carried out with not damaged. tools which have vertical impact control, so that the sub-grade is Chiselling of the surface at regular intervals, if the existing surface is hard.

The minimum thickness of existing bituminous pavement (excluding the milled/scrapped thickness) shall be 75 100 mm to ensure a reliable & strong base. ii.

Profile correction is carried out with the objective of filling existing

potholes, ruts and wide cracks and also to ensure a level surface for resting the pavement. Profile correction and correction of camber can be carried out together with a thin bituminous leveling course or with dry lean concrete (DLC).

a. If the existing road surface is good & only a few localized potholes / cracks exist, they can be repaired with a bituminous mix before concreting is done.

b. If potholes/ cracks are wider than 3 mm, they have to be treated with bituminous emulsion, slurry seal after trimming them to Milling of the existing surface also addresses this problem. i. shape and cleaning out loose fragments with compressed air.

pavement. As mentioned earlier, concrete should be made either in an RMC plant or in a weigh batching plant. Use of either

Laying of PQC is quite similar to the construction of new concrete

fixed form pavers or slip form paver machines is an essential ingredient for getting a good quality pavement. In the used with a fixed side formwork (steel

current project, a fixed form paver was channel box section) with 16mm diameter steel rods of 1 m length as tie rods @ 500mm c/c) and the paver had gang mounted vibrators equally vibratory rollers for screeding, levelling, compaction and finishing. spaced with variable rpm and three integral steel tubes with 8 Tonnes ii. Finishing of the surface is mostly achieved by the paver itself. But to
Groove cutting in progress

achieve uniform finish, a simple hand operated bull float is used when concrete is still in its fresh state. After the bull float operation, uniform surface texture is provided by using steel wire brush.

iii.

To avoid evaporation of surface water from concrete surface (which leads

to plastic shrinkage cracks), wax based curing compound is sprayed. As an additional measure, plastic sheets are spread over the pavement surface till normal curing process starts.

iv.

Contraction joints are provided by cutting groves (for a depth of one-

third of the depth of white topping, 150 mm in this case) at a spacing of using electrical grove machines within about 8 to 10 hours of pouring

1.2 m in longitudinal as well as transverse directions. The joints are cut concrete. These joints are sealed with high quality sealant (either infiltration into the overlay system.

bitumen or poly sulphides) to prevent moisture and incompressible

v.

To ensure effective load transfer across the longitudinal segments as well as transverse construction joints, tie bars and dowel bars are provided.

Test Results
Strict quality control not only during mix design and production of concrete, but carried out. These tests included:

also testing for quality at regular intervals (for every 50 cum of concrete) was

Tests conducted on fresh concrete (slump test at site)

Tests on hardened state (compressive strength of cube & cylinder specimens for 1, 3, 7 & 28 days), split tensile strength, flexural strength of concrete beams Fatigue and abrasion tests on pavement quality (results awaited). to assess the long term performance of concrete.

Test on extracted specimens of concrete (core tests) would be conducted

All the above tests are conducted by Civil Aid Technoclinic (P) Ltd., Bangalore after 5 days of curing.

and the results obtained so far are tabulated. The road was opened for traffic

Compressive Strength of Concrete Cubes (Total no. of samples 936) One-day strength (MPa) Max: 24.1 Min: 21.1 Avg: 22.05 3-day strength (MPa) Max: 48.2 Min: 38.4 Avg: 43.2 7-day strength (MPa) Max: 55.2 Min: 48.4 Avg: 51.02 28 day strength (MPa) Max: 67.2 Min: 57.4 Avg: 61.8

No. Sample size

60 cubes per test

Conclusions
Due to advances in the area of mechanization construction, concrete and fast roads track and Compressive Strength of Concrete Cylinders (Total no. of samples 60) No. Sample size 60 per test 28 day strength (MPa) Max: 61.4 Min: 43.7 Avg: 52.45

white topping provide a sustainable as well as cost effective option for pavement construction. evoked This

technology demonstration project in Bangalore response from people across the has

positive

Flexural strength of Concrete (Total no. of samples 60)

spectrum viz., technical consultants, No. Sample 28 day strength size (MPa) construction industry, academic & Max: 7.35 60 per Min: 6.2 research institutions. The test Avg: 6.3 Government of Karnataka, BBMP and Split Tensile strength of other civic agencies have come Concrete (Total no. of forward to adopt this technology. On samples 60) behalf of the cement industry, CMA No. Sample 28 day strength size (MPa) (Cement Manufacturers' Association) Max: 4.01 60 per test Min: 2.92 has come forward to assist all those Avg: 3.36 involved in the construction on

concrete roads/ white topping by way of several useful publications,

user-friendly software for analysis, design and estimation of quantities providing the necessary technical assistance.

(and comparative cost), conducting training programs for engineers and

References

Concrete Overlays White topping of roads, Cement Manufacturers Association, 2010 Tentative guidelines for conventional, thin and Ultra-thin white topping, IRC: SP: 76 2008, The Indian Roads Congress, New Delhi, 2008 Handbook Association, 2010 on Cement Concrete Roads, Cement Manufacturers

Michael E. Ayers & Dale Harrington, Selection and use of concrete overlays, The Indian Concrete Journal, May 2010 rehabilitating existing pavements, Guide to Concrete Overlays Sustainable solutions for resurfacing and Technology Centre, USA, Sept. 2008. National Concrete

Pavement

NBMCW March 2011

Courtesy : http://www.nbmcw.com