Vehicle collision loads on Supports and Superstructure

Load Combintions as per BD37/01 for Substructure Design (Rev-1)


Vehicle collision with Parapet and Assoc. Primary LL

Load combination 1

SLS

1.00 1.20 1.00 1.00 1.00 1.00 1.10 1.00

ULS* 1.20 1.75 1.20 1.20 1.20 1.50 1.30 1.50 Load combintion 2A SLS 1.00 1.00 1.00 0.30 1.00 1.40 0.30 1.00 1.40

ULS* 1.00 1.00 1.00 Load combintion 2B SLS 1.00 1.20 1.00

ULS* 1.20 1.75 1.20 Load combintion 2C SLS

1.00 1.20 1.00 1.00 1.00 1.00 1.00 1.00 0.30 1.00

ULS* 1.20 1.75 1.20 1.20 1.20 1.50 1.10 1.25 0.40 1.00 Load combintion 3 SLS 1.00 1.20 1.00 1.00 1.00 1.00 1.00 1.00 0.50 0.00 1.00 1.25 1.00 1.50 1.00 1.50 1.00 1.25 1.00 1.10 1.00 1.25

ULS* 1.20 1.75 1.20 1.20 1.20 1.50 1.10 1.25 Load combintion 4A SLS 1.00 1.20 1.00 1.00 1.00 1.00

ULS* 1.20 1.75 1.20 1.20 1.20 1.50 Load combintion 4B SLS 1.00 1.20 1.00 1.00 1.00 1.00

ULS* 1.20 1.75 1.20 1.20 1.20 1.50 Load combintion 4C SLS 1.00 1.20 1.00 1.00 1.00 1.00

ULS* 1.20 1.75 1.20 1.20 1.20 1.50 Load combintion 4D SLS 1.00 1.20 1.00 1.00 1.00 1.00

ULS* 1.20 1.75 1.20 1.20 1.20 1.50 Load combintion 4E SLS 1.00 1.20 1.00 1.00 1.00 1.00

ULS* 1.20 1.75 1.20 1.20 1.20 1.50 Load combintion 4F SLS 1.00 1.20 1.00 1.00 1.00 1.00

ULS* 1.20 1.75 1.20 1.20 1.20 1.50 * All ULS load should also be multiplied by gf3=1.1

121491488.xls.ms_office-Combo-AD

Accidental Skidding and Assoc. Primary LL

Centrifugal force and Assco Primary LL

Long Load: HA and Assoc. primary LL

Long Load: HB and Assoc. primary LL

Vertical Earth Pressure & Surcharge

Temperature Difference from LRFD

Wind on Structure (WS) from LRFD

Wind on Live (WL) from LRFD

Lateral Earth Pressure

Differential Settlement

Deck Self Weight only

HA and HB combined

Footway Live Load

Fill and parapet

Surfacing

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE

Job ref.

Part of structure
WS Atkins & Partners Overseas Drawing ref.

ABUTMENT WALL
Calc. by AN

Calc.sheet no.

rev.

Date NOV'05

Check by MDK

Date NOV'05

Ref.

Calculations

Output

CALCULATION OF LONGITUDINAL LOAD ON ABUTMENT WALL


AS PER BD - 37/01 SECTION 6.1

NOMINAL LOAD FOR TYPE HA


FOR LOADED LENGTH LONGITUDINAL LOAD = = 36.3 545 m KN

NOMINAL LOAD FOR TYPE HB


TOTAL HB LOAD LONGITUDINAL LOAD GOVERNING LONGITUDINAL LOAD TOTAL HEIGHT OF ABUTMENT TOTAL WIDTH OF ABUTMENT CO-EFFICIENT OF FRICTION LONGITUDINAL (BRAKING) FORCE PER METER = TOTAL ASSOCIATED MINIMUM PRIMARY LIVE LOAD (HA) ASSOCIATED PRIMARY MINIMUM LIVE LOAD (HA) PER UNIT WIDTH TOTAL ASSOCIATED PRIMARY LIVE LOAD (HA+ HB) ASSOCIATED PRIMARY LIVE LOAD (HA + HB) PER UNIT WIDTH TOTAL FOOT WAY LIVE LOAD FOOT WAY LIVE LOAD PER UNIT WIDTH TOTAL MIN. LIVE LOAD MIN. LIVE LOAD PER UNIT WIDTH TOTAL MAX. LIVE LOAD MAX. LIVE LOAD PER UNIT WIDTH TOTAL SLS PERMENANT LOAD SLS PERMENANT LOAD PER UNIT WIDTH TOTAL ULS PERMENANT LOAD ULS PERMENANT LOAD PER UNIT WIDTH = = = = = = = = = = = = = = = = = = = = 1800 KN KN KN m m

450

545 10.053 35.55

0.5 27 3118 87.7 KN/unit width KN KN/unit width KN KN/unit width KN KN/unit width KN KN/unit width KN KN/unit width KN KN/unit width KN KN/unit width

17143 482 203 5.71 2467 69.4 17143 482.2 17692 497.7

21953 617.5

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas Drawing ref.

Abutment Wall Design


Calc. by AH Date NOV '05

Calc.sheet no.
Check by Date

rev.

MS

NOV '05 Output

Ref.

Calculations

(As per BS5400 Part 4 - 1990 and BD37/01)


D

EAST / WEST

Abutment Foundation (Stability Check) Soil Pressure Only

LOAD COMBINATION 4E
WALL GEOMETRY Dimension A = Dimension B = Dimension C = Dimension E = Dimension F = Dimension H = Height of Water HW = Shear Key Dimension SH = Dimension SW =

W6

W5

1000 mm 1000 mm 3600 mm 1000 mm 500 mm 7000 mm 0 mm 0 mm 0 mm

F2A

GWT F1

W2 H W4 W3

F2B F3 F2C

HW 4 C W1 B A

E 1

WATER

SOIL

SOIL

SURCH. 2

SW SH

For dimension Detail: Refer Page: ______

Height of Abutment-1 is: (dwg no. GI/181) =Lev A-Lev D+2 Footing Bottom is at +3.0m and GWT is +7.m

Fw

MATERIAL PROPERTIES Soil unit wt. g = Active. Earth coeff. Ka = Passive. Earth coeff. Kp = Concrete unit wt. gc = Friction Coeff. u = DESIGN PARAMETERS Bearing Capacity qa = FoS for Overturning = FoS for Sliding = Surcharge ql= VERTICAL LOADS Permenant DL (kN/m) = Settlement (kN/m) = LTPT (kN/m) = Footway LL (kN/m) = Min. Live Load (kN/m) = Max. Live Load (kN/m) =

19 kN/m3 0.3 0 24 kN/m3 0.50 (Between concrete and Soil)

250 kN/m2 2 1.5 11.4 kN/m2 (BD 37/01 - Cl 5.8.2.1)

0 0 0 0 0 0
Refer Page : ________

HORIZONTAL LOADS Braking Force (kN/m) = CALCULATIONS Dimension D = 5600 mm 5 (At Top of wall)

121491488.xls.ms_office

stability CASE1LATERAL PR - Page 3

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas Drawing ref.

Abutment Wall Design


Calc. by AH Date NOV '05

Calc.sheet no.
Check by Date

rev.

MS

NOV '05 Output

Ref.

Calculations

STABILITY CHECKS a)- SLIDING Horizontal Force F1= Surcharge Force = F2A= Soil Force = F2B= Soil Force = F2C= Soil Force = F3= Water = F4=Braking = F= Total Sliding Force = W1= Wt. of Base = W2= Wt. of str. Wall = W3= Wt. of taper Wall = W4= Wt. of str. Soil = W5= Wt. of taper Soil = W6= Wt. of surcharge = W7= Perm. Vertical load = Fw= Upward water force= W= Total Weight = Force resisted by Key Rsk= FoS-S= (u*W+Rsk)/F b)- OVERTURNING Overturning Moment 27.4 kN 182.4 kN 0.0 kN 0.0 kN 0.0 kN 4.7 kN 214.5 kN 134.4 kN 84.0 kN 42.0 kN 478.8 kN 33.3 kN 46.7 kN 0.0 kN 0.0 kN 819.2 kN 0.0 kN 1.91 (At point 1) Item F1 F2A F2B F2C F3 F4 Fw Force (kN) 27.4 182.4 0.0 0.0 0.0 4.7 0.0 Lever Arm (m) 4.000 2.667 0.000 0.000 0.000 8.000 3.733 =>Satisfactory NOTE :- Since Footings Of Both Walls Are Connected, So No Problem Of Stability In Slidding. OTM (kNm) 109.4 486.4 0.0 0.0 0.0 37.6 0.0 633.4 RM (kNm) 376.3 105.0 70.0 1819.4 61.0 165.9 0.0 2597.6 (At base of footing level)

Vertical force (downward Positive)

Total Overturning Moment (OTM) = Resisting Moment Item W1 W2 W3 W4 W5 W6 W7 Weight (kN) 134.4 84.0 42.0 478.8 33.3 46.7 0.0 819.2 Safety Factor FoS-M= 4.10 =>Satisfactory Lever Arm (m) 2.800 1.250 1.667 3.800 1.833 3.550 1.250 16.150 FoS-M= RM/OTM

Total Resisting Moment (RM)

121491488.xls.ms_office

stability CASE1LATERAL PR - Page 4

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas Drawing ref.

Abutment Wall Design


Calc. by AH Date NOV '05

Calc.sheet no.
Check by Date

rev.

MS

NOV '05 Output

Ref.

Calculations

STABILITY CHECK (CONTINUED) c)- BEARING PRESSURE Net Moment at Centerline of Base

Item F1 F2A F2B F2C F3 F4 W1 W2 W3 W4 W5 W6 W7 (min) W7 (max) Fw Net W.min= Net W.max=

F / W (kN) 27.4 182.4 0.0 0.0 0.0 4.7 134.4 84.0 42.0 478.8 33.3 46.7 0.0 0.0 0.0 819.2 819.2

Lever Arm (m) 4.000 2.667 0.000 0.000 0.000 8.000 0.000 1.550 1.133 -1.000 0.967 -0.750 1.550 1.550 -0.933 Net M.min= Net M.max= 289 55.2 -55.2

Moment 109.4 486.4 0.0 0.0 0.0 37.6 0.0 130.2 47.6 -478.8 32.1 -35.1 0.0 0.0 0.0 329.5 329.5 kNm/m kN/m2 kN/m2 Refer page : _______ (Positive means Clockwise)

Moment produced by unbalance live load on bearing = Pressure at point 1 due to moment Pressure at point 4 due to moment Base Geometric Properties Area ('AR' per metre) = Inertia ('IR' per metre) = Bearing Pres. at point 1= Bearing Pres. at point 2= 5.6 m2 14.6 m4 Minimum 209 kN/m2 83 kN/m2 Maximum 265 kN/m2 83 kN/m2 = =

Pressure exceeding limit

121491488.xls.ms_office

stability CASE1LATERAL PR - Page 5

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas Drawing ref.

Abutment Wall Design


Calc. by AH Date NOV '05

Calc.sheet no.
Check by Date

rev.

MS

NOV '05 Output

Ref.

Calculations

EAST / WEST
LOAD COMBINATION 4E

Abutment Foundation (Stability Check) EARTH PRESSURE,SURCHARGE


HYDROSTATIC + MAX PERMANENT & LIVE LOADS

(As per BS5400 Part 4 - 1990 and BD37/01

WALL GEOMETRY Dimension A = Dimension B = Dimension C = Dimension E = Dimension F = Dimension H = Height of Water HW = Shear Key Dimension SH = Dimension SW =

3250 mm 1500 mm 3250 mm 1000 mm 1500 mm 9053 mm 2833 mm 0 mm 0 mm

W6

W5

F2A

GWT F1

W2 H W4 W3

F2B F3 F2C

HW 4 C W1 B A

E 1

For dimension Detail: Refer Page: ______

WATER

SOIL

SOIL

SURCH. 2

SW SH

MATERIAL PROPERTIES Soil unit wt. g = Active. Earth coeff. Ka = Passive. Earth coeff. Kp = Concrete unit wt. gc = Friction Coeff. u = DESIGN PARAMETERS Bearing Capacity qa = FoS for Overturning = FoS for Sliding = Surcharge ql= VERTICAL LOADS Permenant DL (kN/m) = Settlement (kN/m) = LTPT (kN/m) = Footway LL (kN/m) = Min. Live Load (kN/m) = Max. Live Load (kN/m) =

Height of Abutment-1 is: (dwg no. GI/181) =Lev A-Lev D+2 Footing Bottom is at +3.0m and GWT is +7.m

Fw

17 kN/m3 0.29 3.5 25 kN/m3 0.29 (Between concrete and Soil)

400 kN/m2 1.5 1.5 20 kN/m2 (BD 37/01 - Cl 5.8.2.1)

618 0 0 0 0 482
Refer Page : ________

HORIZONTAL LOADS Braking Force (kN/m) = CALCULATIONS Dimension D = 8000 mm 0 (At Top of wall)

121491488.xls.ms_office

stability PERM+LIVE - Page 6

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas Drawing ref.

Abutment Wall Design


Calc. by AH Date NOV '05

Calc.sheet no.
Check by Date

rev.

MS

NOV '05 Output

Ref.

Calculations

STABILITY CHECKS a)- SLIDING Horizontal Force F1= Surcharge Force = F2A= Soil Force = F2B= Soil Force = F2C= Soil Force = F3= Water = F4=Braking = F= Total Sliding Force = W1= Wt. of Base = W2= Wt. of str. Wall = W3= Wt. of taper Wall = W4= Wt. of str. Soil = W5= Wt. of taper Soil = W6= Wt. of surcharge = W7= Perm. Vertical load = Fw= Upward water force= W= Total Weight = Force resisted by Key Rsk= FoS-S= (u*W+Rsk)/F b)- OVERTURNING Overturning Moment 58.3 kN 128.5 kN 100.8 kN 8.1 kN 40.1 kN 0.0 kN 335.9 kN 200.0 kN 339.5 kN 0.0 kN 500.2 kN 0.0 kN 65.0 kN 617.5 kN -113.3 kN 1608.9 kN 0.0 kN 1.39 (At point 1) Item F1 F2A F2B F2C F3 F4 Fw Force (kN) 58.3 128.5 100.8 8.1 40.1 0.0 113.3 Lever Arm (m) 5.027 5.240 1.417 0.944 0.944 10.053 5.333 =>Not enough NOTE :- Since Footings Of Both Walls Are Connected, So No Problem Of Stability In Slidding. OTM (kNm) 293.1 673.3 142.8 7.7 37.9 0.0 604.4 1759.2 RM (kNm) 800.0 1358.0 0.0 3188.6 0.0 414.4 2470.1 8231.1 (At base of footing level)

Vertical force (downward Positive)

Total Overturning Moment (OTM) = Resisting Moment Item W1 W2 W3 W4 W5 W6 W7 Weight (kN) 200.0 339.5 0.0 500.2 0.0 65.0 617.5 1722.2 Safety Factor FoS-M= 4.68 =>Satisfactory Lever Arm (m) 4.000 4.000 4.750 6.375 4.750 6.375 4.000 34.250 FoS-M= RM/OTM

Total Resisting Moment (RM)

121491488.xls.ms_office

stability PERM+LIVE - Page 7

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas Drawing ref.

Abutment Wall Design


Calc. by AH Date NOV '05

Calc.sheet no.
Check by Date

rev.

MS

NOV '05 Output

Ref.

Calculations

STABILITY CHECK (CONTINUED) c)- BEARING PRESSURE Net Moment at Centerline of Base

Item F1 F2A F2B F2C F3 F4 W1 W2 W3 W4 W5 W6 W7 (min) W7 (max) Fw Net W.min= Net W.max=

F / W (kN) 58.3 128.5 100.8 8.1 40.1 0.0 200.0 339.5 0.0 500.2 0.0 65.0 617.5 1099.7 -113.3 1608.9 2091.1

Lever Arm (m) 5.027 5.240 1.417 0.944 0.944 10.053 0.000 0.000 -0.750 -2.375 -0.750 -2.375 0.000 0.000 -1.333 Net M.min= Net M.max= 289 27.0 -27.0

Moment 293.1 673.3 142.8 7.7 37.9 0.0 0.0 0.0 0.0 -1187.9 0.0 -154.4 0.0 0.0 151.1 -36.4 -36.4 kNm/m kN/m2 kN/m2 Refer page : _______ (Positive means Clockwise)

Moment produced by unbalance live load on bearing = Pressure at point 1 due to moment Pressure at point 4 due to moment Base Geometric Properties Area ('AR' per metre) = Inertia ('IR' per metre) = Bearing Pres. at point 1= Bearing Pres. at point 2= 8.0 m2 42.7 m4 Minimum 198 kN/m2 205 kN/m2 Maximum 285 kN/m2 265 kN/m2 = =

Okay

121491488.xls.ms_office

stability PERM+LIVE - Page 8

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas Drawing ref.

Abutment Wall Design


Calc. by AH Date NOV '05

Calc.sheet no.
Check by Date

rev.

MS

NOV '05 Output

Ref.

Calculations

EAST / WEST

Abutment Foundation (Stability Check) (Earth

Pressure,Surcharge,hydrostatic

(As per BS5400 Part 4 - 1990 and BD37/01) LOAD COMBINATION 4E

Pressure + longitudinal load with associated Live load)


D W6 F

WALL GEOMETRY Dimension A = Dimension B = Dimension C = Dimension E = Dimension F = Dimension H = Height of Water HW = Shear Key Dimension SH = Dimension SW =

3250 mm 1500 mm 3250 mm 1000 mm 1500 mm 9053 mm 2833 mm 0 mm 0 mm


F3

W5

F2A

GWT F1

W2 H W4 W3

F2B F2C

HW 4 C W1 B A

E 1

WATER

SOIL

SOIL

SURCH. 2

SW SH

For dimension Detail: Refer Page: ______

Height of Abutment-1 is: (dwg no. GI/181) =Lev A-Lev D+2 Footing Bottom is at +3.0m and GWT is +7.m

Fw

MATERIAL PROPERTIES Soil unit wt. g = Active. Earth coeff. Ka = Passive. Earth coeff. Kp = Concrete unit wt. gc = Friction Coeff. u = DESIGN PARAMETERS Bearing Capacity qa = FoS for Overturning = FoS for Sliding = Surcharge ql= VERTICAL LOADS Permenant DL (kN/m) = Settlement (kN/m) = LTPT (kN/m) = Footway LL (kN/m) = Min. Live Load (kN/m) = Max. Live Load (kN/m) =

17 kN/m3 0.29 3.5 25 kN/m3 0.29 (Between concrete and Soil)

400 kN/m2 1.5 1.5 20 kN/m2 (BD 37/01 - Cl 5.8.2.1)

618 0 0 6 88 0
Refer Page : ________

HORIZONTAL LOADS Braking Force (kN/m) = CALCULATIONS Dimension D = 8000 mm 27 (At Top of wall)

121491488.xls.ms_office

stability CASE3LETERAL+BRK - Page 9

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas Drawing ref.

Abutment Wall Design


Calc. by AH Date NOV '05

Calc.sheet no.
Check by Date

rev.

MS

NOV '05 Output

Ref.

Calculations

STABILITY CHECKS a)- SLIDING Horizontal Force F1= Surcharge Force = F2A= Soil Force = F2B= Soil Force = F2C= Soil Force = F3= Water = F4=Braking = F= Total Sliding Force = W1= Wt. of Base = W2= Wt. of str. Wall = W3= Wt. of taper Wall = W4= Wt. of str. Soil = W5= Wt. of taper Soil = W6= Wt. of surcharge = W7= Perm. Vertical load = Fw= Upward water force= W= Total Weight = Force resisted by Key Rsk= FoS-S= (u*W+Rsk)/F b)- OVERTURNING Overturning Moment 58.3 kN 128.5 kN 100.8 kN 8.1 kN 40.1 kN 27.1 kN 363.0 kN 200.0 kN 339.5 kN 0.0 kN 500.2 kN 0.0 kN 65.0 kN 617.5 kN -113.3 kN 1608.9 kN 0.0 kN 1.29 (At point 1) Item F1 F2A F2B F2C F3 F4 Fw Force (kN) 58.3 128.5 100.8 8.1 40.1 27.1 113.3 5.027 5.240 1.417 0.944 0.944 10.053 5.333 NOTE :- Since Footings Of Both Walls =>Not enough Are Connected, So No Problem Of Stability In Slidding. Lever Arm (m) OTM (kNm) 293.1 673.3 142.8 7.7 37.9 272.5 604.4 2031.7 (At base of footing level)

Vertical force (downward Positive)

Total Overturning Moment (OTM) = Resisting Moment Item W1 W2 W3 W4 W5 W6 W7

Weight (kN) Lever Arm (m) RM (kNm) 200.0 339.5 0.0 500.2 0.0 65.0 617.5 1722.2 4.000 4.000 4.750 6.375 4.750 6.375 4.000 34.250 800.0 1358.0 0.0 3188.6 0.0 414.4 2470.1 8231.1

Total Resisting Moment (RM) Safety Factor FoS-M= 4.05 =>Satisfactory FoS-M= RM/OTM

121491488.xls.ms_office

stability CASE3LETERAL+BRK - Page 10

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas Drawing ref.

Abutment Wall Design


Calc. by AH Date NOV '05

Calc.sheet no.
Check by Date

rev.

MS

NOV '05 Output

Ref.

Calculations

STABILITY CHECK (CONTINUED) c)- BEARING PRESSURE Net Moment at Centerline of Base

Item F1 F2A F2B F2C F3 F4 W1 W2 W3 W4 W5 W6 W7 (min) W7 (max) Fw Net W.min= Net W.max=

F / W (kN) 58.3 128.5 100.8 8.1 40.1 27.1 200.0 339.5 0.0 500.2 0.0 65.0 705.2 623.2 -113.3 1696.6 1614.6

Lever Arm (m) 5.027 5.240 1.417 0.944 0.944 10.053 0.000 0.000 -0.750 -2.375 -0.750 -2.375 0.000 0.000 -1.333 Net M.min= Net M.max= 289 27.0 -27.0

Moment 293.1 673.3 142.8 7.7 37.9 272.5 0.0 0.0 0.0 -1187.9 0.0 -154.4 0.0 0.0 151.1 236.1 236.1 kNm/m kN/m2 kN/m2 Refer page : _______ (Positive means Clockwise)

Moment produced by unbalance live load on bearing = Pressure at point 1 due to moment Pressure at point 4 due to moment Base Geometric Properties Area ('AR' per metre) = Inertia ('IR' per metre) = Bearing Pres. at point 1= Bearing Pres. at point 2= 8.0 m2 42.7 m4 Minimum 234 kN/m2 190 kN/m2 Maximum 251 kN/m2 180 kN/m2 = =

Okay

121491488.xls.ms_office

stability CASE3LETERAL+BRK - Page 11

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE Abutment Wall Design Calc. by AH Date NOV '05

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas

Calc.sheet no. Check by


MS

rev. Date NOV '05

Drawing ref.

Ref.

Calculations

Output

EAST / WEST

Wall Flexure Design


0.44 19 kN/m3 11 kN/m2 7000 mm 500 mm 1000 mm 1000 mm 0 mm 8000 mm
W6 F

Lateral Earth coeff. K Fill Density Live Load Surcharge Dimension H = Dimension F = Dimension B = Dimension E = Height of Water HW = Water Depth from Top= Material Strength: fcu = 40 MPa fy = 460 MPa Cover to Main Bars 75 mm Ultimate Factors: gfEP gfBRK 1.5 gfSUR 1.5 gf3 1.1
Dist. from Top mm Shear due to Surcharg e Shear Soil KN/m2

W5

F2A

GWT F1

W2 H W4 W3

F2B F3 F2C

HW 4 C W1 B SH SW D A

E 1

WATER

SOIL

SOIL

SURCH. 2

1.25

Shear Water KNm/m

Shear due to Braking KN/m

due to due to

ULS Lateral Shear

ULS Momen t KNm/m

Wall Thick.

Effec. Depth d mm

Lever Arm z

Asreqd Asrqd Flexur e sq. mm Shear Asa

Total Rqd.

Asprov

Rebar

Asmin

KN/m2

mm

mm

sq. mm

mm

mm

sq. mm

0 700 1400 2100 2800 3500 4200 4900 5600 6300 7000

0.0 3.5 7.0 10.5 14.0 17.6 21.1 24.6 28.1 31.6 35.1

0 2.048 8.193 18.43 32.77 51.21 73.74 100.4 131.1 165.9 204.8

0 0 0 0 0 0 0 0 0 0 0

0 27 27 27 27 27 27 27 27 27 27

0 46 62 85 115 151 194 243 300 363 433

0 27 62 111 178 268 386 536 723 953 1229

500 550 600 650 700 750 800 850 900 950 1000

415 465 515 565 615 665 715 763 813 859 909

394 442 489 537 584 632 679 724 772 816 864

0 150 316 515 760 1059 1419 1848 2341 2917 3555

0 58 78 106 143 188 242 304 375 454 541

0 208 394 622 903 1248 1661 2153 2716 3370 4096

3142 3142 3142 3142 3142 3142 3142 4909 4909 8042 8042

T20 T20 T20 T20 T20 T20 T20 T25 T25 T32 T32 -

100 100 100 100 100 100 100 100 100 100 100

1250 1313 1375 1438 1500 1563 1625 1688 1750 1813 1875

Notes: Asmin = Max of (0.0015*bd{cl. 5.8.4} -OR- Asmin(per face)=0.005*(Ac-0.5Acor)/2{cl. 5.8.9}) where Ac=b*h : Acor=b*(h-500) : h=Thickness of wall

121491488.xls.ms_office

Wall Design - page12

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE Abutment Wall Design Calc. by AH Date NOV '05

Job ref.

Part of structure/ Subject


WS Atkins & Partners Overseas

Calc.sheet no. Check by


MS

rev. Date NOV '05

Drawing ref.

Ref.

Calculations

Output

EAST / WEST

Wall Flexure Design


W6 F

Shear Capacity check (At wall base)


Ultimate Shear Force = Shear Stress (v=V/(b*d)) = Shear Cap. vc = 0.61 Mpa 433 kN 0.48 MPa ; Max. Shear allowed = 4.75 Mpa
No. Shear R/F is rqd.

W5 Shear within limit => OK GWT F1 W2 H W4 W3 HW 4 3 B W1 SH SW D A

F2A

SHEAR LINKS AS PER REQUIREMENTS: BS5400: (CL:5.3.3.2) Rqd. Asv/s = 0.67 mm^2/mm Shear Link Dia= T16 Horz. Spacing 300 Vert. Spacing 450 Provided Asv/s = 1.49 mm^2/mm Service Moments for Crack width check Ml= 123 kNm Md= 622 kNm

F2B F3 F2C

C SOIL SURCH. 2

E 1

WATER

SOIL

121491488.xls.ms_office

Wall Design - page13

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE Abutment Wall Calc. by AH Calculations Date NOV '05

Job ref. Calc.sheet no. Check by MS Date rev.

Part of structure

WS Atkins & Partners Overseas


Drawing ref.

NOV '05

Ref.

Output

EAST / WEST
Location : Wall Bottom End INPUT DATA:
fcu = Concrete Cube Strength

Crack Width Check

40 460 14.20 200 14.08 745 622 123 8042 0 1000 909 0 1000 1000 75 35 100 55 354

MPa MPa x 103 MPa x 103 MPa KN-m KN-m KN-m mm2 mm2 mm mm mm mm mm mm mm mm mm mm

fy = Yield Strength of Reinforcement Ecl = Long term Concrete Modulus Es = Steel Reinforcement Modulus m = Es/Ecl = Mser = Max. Service moment Mg = Moment due to permanent loads Mq = Moment due to live loads As = Area of Tension Reinforcement As' = Area of Compression Reinforcement bt = Width of Section at Tensile steel level d = distance from Comp. To tensile steel c.g. d' = distance from Comp. To Compressive steel c.g a' = Distance from Comp. Face to Crack Surface h = Overall depth of the Section c= Cover to Reinforcement cnom = Reqd' Nominal Cover to outermost bar s = spacing between bars acr = Dist. from bar controlling crack to Crack point dc = Depth of Concrete in Compression = x es = Strain in steel w/o concrete Tension Stiffening e1 = Strain at Crack Surface w/o Tension Stiffening em = Strain at Crack Surface with Tension Stiffening

Bar Size T32

Spacing 100

n1 n2 Cnom

acr s

CALCULATIONS : r = As/bd r' = As/bd x = d*{[(mr + (m-1)r')2 +2*(mr + (m-1)(d'/d)r')]1/2 - (mr + (m-1)r')} k2 = (x/2d)*(1-x/3d) k3 = (m-1) * (1-d'/x) fc = M / [k2bd2 + k3As'(d-d')] fs = mfc * (d/x-1) es = fs/Es e1 = (d+cnom-x)/(d-x) * es em = e1 - [3.8*bt*h*(a'-dc)/(es*As*(h-dc))] *[(1-Mq/Mg)*10 ] < e1
-9

0.008848 0 354 0.170 13.084 5.31 117.06 MPa MPa mm

0.000585 Strain in steel w/o concrete Tension Stiffening 0.000622 Strain at Crack Surface w/o Tension Stiffening -2.5E-05 Strain at Crack Surface with Tension Stiffening

Design Crack Width

0.00

mm

< 0.20mm (Ref: AIP)

= 3*acr*em/(1+2*(acr-Cnom)/(h-x))

121491488.xls.ms_office

Crack width for wall - Page14

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE Abutment Wall Base Calc. by AH Calculations Date

Job ref. Calc.sheet no. Check by Date rev.

Part of structure
WS Atkins & Partners Overseas

Drawing ref.

MS
Output

Ref.

EAST / WEST
Dimension Dimension Dimension Dimension Dimension Dimension Dimension A= B= C= E= F= H= D=

Wall Base Design


1000 mm 1000 mm 3600 mm 1000 mm 500 mm 7000 mm 5600 mm
F1 F

W6

W5

W2 W4 H

Base Geometric Properties Area (per metre) = Inertia (per metre) = Lateral Earth coeff. K = Earth Density Surcharge Concrete unit wt. gc = Material Strength: fcu = fy = Reinforcement Cover = Reinforcement Diameter =

5.6 m2 14.6 m4 0.44 17 kN/m3 20 kN/m2 24 kN/m3 40 MPa 460 MPa 75 mm T25

F2 4 W1 SOIL SURCHARGE 2 C D

W3 3

E B A 1

Ultimate Factors: gfEP gfSUR gfDL gf3

1.5 1.5 1.2 1.1

gfBRK

1.25

BEARING PRESSURES AT ULS Unfact. Force Horizontal Forces component F/W Fact. Force F/W 105.60 359.04 0.0 33.88
ULS 0 34 0

lever arm (m) 4.00 2.67 0.00 7.50

Serv. Mom. (kNm) 281.6 638.3 0.0 203.3

Ult. Mom. (kNm) 422.4 957.4 0.0 254.1

F1 70.40 F2 239.36 F3 0.0 Braking Force 27 SUMMARY OF GRAVITY LOADS


LD. TYPE D+SDL Vehicle Live (or) Assoc. for Braking FW LIVE Settlement Width of Abutment Footing (m) TOT. DEAD TOT. LIVE 35.5 SLS 0 27 0

0 1

0 1

121491488.xls.ms_office

Base Design - page15

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE Abutment Wall Base Calc. by AH Calculations Date

Job ref. Calc.sheet no. Check by Date rev.

Part of structure
WS Atkins & Partners Overseas

Drawing ref.

MS
Output

Ref.

EAST / WEST
W1 W2 W3 W4 W5 W6 Total Dead Load Total Live Load Total Vertical Force (kN) =

Wall Base Design


SLS 134.4 84.0 42.0 428.4 0.0 82.0 0.0 0.8 771.6 ULS 161.3 100.8 50.4 514.1 0.0 123.0 0.0 1.0 1045.6 L ARM 0.00 1.55 1.13 -1.00 0.97 -0.75 1.30 1.30 SLS M 0.0 130.2 47.6 -428.4 0.0 -61.5 0.0 1.0 811.1 ULS M 0.0 156.2 57.1 -514.1 0.0 -92.3 0.0 1.2 1241.0

Bearing Pressures Point 1 Point 2 Point 3 Point 4 At a dist d from rare face Allowable Service Net Bearing Pressure = Maximum Applied Net Pressure =

SLS 293 -17 238 182 132

ULS 424 -51 339 255 177 400 293 Kpa Kpa

121491488.xls.ms_office

Base Design - page16

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE Abutment Wall Base Calc. by AH Calculations Date

Job ref. Calc.sheet no. Check by Date rev.

Part of structure
WS Atkins & Partners Overseas

Drawing ref.

MS
Output

Ref.

EAST / WEST
Flexure Design
ULS Moment at point 3 = gf3 M = Effective depth (d) = lever arm z = As required = Provided reinforcement= ULS Moment at point 4 = gf3 M = Effective depth (d) = lever arm z = As required =

Wall Base Design


198 kNm/m 218 kNm/m 909 mm 864 mm 630 mm2/m T32 at -937 kNm/m 1030 kNm/m 909 mm 864 mm 2982 mm2/m T32 at 150 mm Top Asp = 5362 mm2/m 100 mm Hogging Bottom Asp = 8042 mm2/m Sagging

Shear Capacity check at Point 4


Heel Shear Force at Face ( Vh )= Shear Stress (v=Vh/(b*d)) = Shear Cap. W/O shear r/f vc = 404 kN 0.44 MPa 0.53 MPa Max. Shear allowed =
No. Shear R/F is rqd.

4.75 MPa

Shear within limit => OK

Shear Capacity check at Point 3


Pressure at "d" front face Toe Shear Force at d= Shear Stress (v=Vh/(b*d)) = Shear Cap. W/O shear r/f vc = 410 Kpa 42 kN 0.05 MPa 0.61 MPa Max. Shear allowed =
No. Shear R/F is rqd.

4.75 MPa

Shear within limit => OK

Service Moment at wall Face


Service Stress at Point 1 = Service Stress at Point 3 = SLS Moment at point 3 = Live / Dead Ratio = Mdead = Mlive = 293 238 137 kNm/m 0.04 133 kNm/m 5 kNm/m

[ To be used in Crack width Calculations]

121491488.xls.ms_office

Base Design - page17

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE Abutment Wall Base Calc. by AH Calculations Date NOV '05

Job ref. Calc.sheet no. Check by MS rev. Date NOV '05

Part of structure

WS Atkins & Partners Overseas


Drawing ref.

Ref.

Output

EAST / WEST
Location : Base Bottom INPUT DATA:
fcu = Concrete Cube Strength

Crack Width Check

40 460 14.20 200 14.08 137 133 5 8042 0 1000 909 0 1000 1000 75 35 100 55 354

MPa MPa x 103 MPa x 103 MPa KN-m KN-m KN-m mm2 mm2 mm mm mm mm mm mm mm mm mm mm

fy = Yield Strength of Reinforcement Ecl = Long term Concrete Modulus Es = Steel Reinforcement Modulus m = Es/Ecl = Mser = Max. Service moment Mg = Moment due to permanent loads Mq = Moment due to live loads As = Area of Tension Reinforcement As' = Area of Compression Reinforcement bt = Width of Section at Tensile steel level d = distance from Comp. To tensile steel c.g. d' = distance from Comp. To Compressive steel c.g a' = Distance from Comp. Face to Crack Surface h = Overall depth of the Section c= Cover to Reinforcement cnom = Reqd' Nominal Cover to outermost bar s = spacing between bars acr = Dist. from bar controlling crack to Crack point dc = Depth of Concrete in Compression = x es = Strain in steel w/o concrete Tension Stiffening e1 = Strain at Crack Surface w/o Tension Stiffening em = Strain at Crack Surface with Tension Stiffening

Bar Size T32

Spacing 100

n1 n2 Cnom

acr s

CALCULATIONS : r = As/bd r' = As/bd x = d*{[(mr + (m-1)r')2 +2*(mr + (m-1)(d'/d)r')]1/2 - (mr + (m-1)r')} k2 = (x/2d)*(1-x/3d) k3 = (m-1) * (1-d'/x) fc = M / [k2bd2 + k3As'(d-d')] fs = mfc * (d/x-1) es = fs/Es e1 = (d+cnom-x)/(d-x) * es em = e1 - [3.8*bt*h*(a'-dc)/(es*As*(h-dc))] *[(1-Mq/Mg)*10 ] < e1
-9

0.008848 0 354 0.170 13.084 0.98 21.58 MPa MPa mm

0.000108 Strain in steel w/o concrete Tension Stiffening 0.000115 Strain at Crack Surface w/o Tension Stiffening -0.00411 Strain at Crack Surface with Tension Stiffening

Design Crack Width

-0.64

mm

UnCracked (Ref: AIP)

= 3*acr*em/(1+2*(acr-Cnom)/(h-x))

121491488.xls.ms_office

Crack width for Base - page18

Project

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE SUBSTRUCTURE PD Calc. by AN Calculations Date NOV'05

Job ref.
Calc.sheet no. Check by
MS

Part of structure WS Atkins & Partners Overseas Drawing ref.

rev. Date NOV'05

Ref.

Output

AL - GHARRAFA INTERCHANGE (EAST / WEST) BRIDGE - SUPPORT REACTIONS SLS EDGE SUPP1 EDGE SUPP2 ULS FACTOR EDGE SUPP1 P(KN) P(KN) P(KN) 17692.0 17692.0 1.3 22999.6 0.0 0.0 1.0 0.0 0.0 0.0 1.0 0.0 203.0 203.0 1.5 304.5 17143.0 17143.0 1.3 22285.9 5651.0 5651.0 1.5 8476.5 ULS INT SUPP P(KN) M(KN-m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

LOAD TYPES DL LTPT SETT FWL HA+HB HA

EDGE SUPP2 P(KN) 22999.6 0.0 100.1 304.5 22285.9 8476.5

TOTAL

36752

36752

50149

NOTE : ALL SUPPORT REACTIONS ARE RECOVERED FROM ADAPT - ABI LINE MODEL OUTPUT