[FAISAL SARDAR] 2009-CIV-122

ASSIGNMENT # 3
THE FOLLOWING SET OF DATA RELATES TO A NATURAL STREAM AT A DAM SITE , THE
VALUES ARE AVERAGED OVER THE PAST 30 YEARS RECORD .
FOR THE GIVEN RESERVOIR OPERATION SCENARIOS :
ESTIMATE THE LIVE STORAGE CAPACITY OF RESERVOIR .
PLOAT MASS CURVE (MASS INFLOW CURVE & DEMAND CURVE )
PROPOSE SUITABLE EMPTING & FILING PROGRAM .
THE RESERVOIR OPERATION SCENARIOS :
WHEN A CONSTANT MAXIMUM SUPPLY IS TO BE ENSURED FROM THE RESERVOIR
CONSIDERING THE LOSSES DUE TO EVAPORATION .
WHEN THE SPECIFIED DISCHARGE ARE TO BE RELEASED FRON THE RESERVOIR .

AVG.
MONTYH

DAYS

DISCHARGE

EVAPORATION

INFLOW

OUTFLOWS

LOSSES
m3/sec

m3/sec

m3/sec

m3/sec

JAN

31

75

2.44

72.56

85

FEB

28

95

2.44

92.56

105

MAR

31

120

2.44

117.56

130

APR

30

156

2.44

153.56

160

MAY

31

265

2.44

262.56

200

JUN

30

360

2.44

357.56

250

JUL

31

455

2.44

452.56

300

AUG

31

590

2.44

587.56

380

SEP

30

415

2.44

412.56

325

OCT

31

245

2.44

242.56

260

NOV

30

125

2.44

122.56

140

DEC

31

85

2.44

82.56

95

[FAISAL SARDAR] 2009-CIV-122


FIRST SCENARIO
When A Constant Maximum Supply Is To Be Ensured From The Reservoir Considering The Losses Due To Evaporation .

MONTYH

DAYS

DISCHARGE

AVG.
EVAPORATION
LOSSES

INFLOW

MONTHLY
INFLOW
YIELD

COMMULATIVE
MIY

m3/sec

m3/sec

m3/sec

MCM

MCM

UDO

MCM

COMMULATIVE
UDO

SURPLUS

DEFICIT

MCM

MCM

MCM

JAN

31

75

3.19

71.81

192.34

192.3359

639.67

639.67

447.34

FEB

28

95

3.69

91.31

220.90

413.2331

639.67

1279.35

418.78

MAR

31

120

4.59

115.41

309.11

722.3472

639.67

1919.02

330.56

APR

30

156

5.54

150.46

389.99

1112.34

639.67

2558.69

249.68

MAY

31

265

6.64

258.36

691.99

1804.331

639.67

3198.36

52.32

JUN

30

360

7.94

352.06

912.54

2716.87

639.67

3838.04

272.87

JUL

31

455

9.94

445.06

1192.05

3908.919

639.67

4477.71

552.38

AUG

31

590

11.04

578.96

1550.69

5459.606

639.67

5117.38

911.01

SEP

30

415

9.44

405.56

1051.21

6510.817

639.67

5757.06

411.54

OCT

31

245

7.44

237.56

636.28

7147.098

639.67

6396.73

3.39

NOV

30

125

4.94

120.06

311.20

7458.293

639.67

7036.40

328.48

DEC

31

85

3.69

81.31

217.78

7676.074

639.67

7676.07

421.89
2200.12

LIVE STORAGE CAPACITY = 2200.12 MCM

2200.12

[FAISAL SARDAR] 2009-CIV-122

MASS CURVE
9000

8000

7000

6000

5000
COMM M.I.Y
&
COMM M.UDO 4000

COM MIY VS TIME


COM UDO VS TIME

3000

2000

1000

0
1JAN

2
FEB

3
MAR

4
APR

5
MAY

6
JUN

7
JUL
TIME

8
AUG

9SEP

10
OCT

11
NOV

12
DEC

13

[FAISAL SARDAR] 2009-CIV-122

EMPTING & FILLING PROGRAM

1800.00

1600.00

1400.00

SURPLUS
PERIOD

1200.00

M.I.Y
&
M.UDO

1000.00

DEFICIT
PERIOD
800.00

MIY VS TIME

M. UDO VS TIME

600.00

400.00

200.00

0.00
1
JAN

2
FEB

3
MAR

4
APR

5
MAY

6
JUN

7
JULY

TIME

8
AUG

9
SEP

10
OCT

11
NOV

12
DEC

13

[FAISAL SARDAR] 2009-CIV-122


SECOND SCENARIO :
WHEN THE SPECIFIED DISCHARGE ARE TO BE RELEASED FRON THE RESERVOIR .

MONTYH

DAYS

DISCHARGE

AVG.
EVAPORATION
LOSSES

INFLOW

MONTHLY
INFLOW
YIELD

COMMULATIVE
MIY

UDO

MONTHLY
UDO

m3/sec

m3/sec

m3/sec

MCM

MCM

m3/sec

MCM

COMMULATIVE
UDO

SURPLUS

DEFICIT

JAN

31

75

3.19

71.81

192.34

192.34

88.49

237.00

237.00

44.66

FEB

28

95

3.69

91.31

220.9

413.23

108.49

262.45

499.45

41.55

MAR

31

120

4.59

115.41

309.11

722.35

133.49

357.53

856.97

48.42

APR

30

156

5.54

150.46

389.99

1112.34

163.49

423.75

1280.72

33.76

MAY

31

265

6.64

258.36

691.99

1804.33

203.49

545.01

1825.74

146.98

JUN

30

360

7.94

352.06

912.54

2716.87

253.49

657.03

2482.77

255.51

JUL

31

455

9.94

445.06

1192.05

3908.92

303.49

812.85

3295.63

379.2

AUG

31

590

11.04

578.96

1550.69

5459.61

383.49

1027.13

4322.75

523.56

SEP

30

415

9.44

405.56

1051.21

6510.82

328.49

851.43

5174.19

199.78

OCT

31

245

7.44

237.56

636.28

7147.10

263.49

705.72

5879.90

69.44

NOV

30

125

4.94

120.06

311.2

7458.29

143.49

371.91

6251.82

60.71

DEC

31

85

3.69

81.31

217.78

7676.07

98.49

263.78

6515.60

46
1505.03

LIVE STORAGE CAPACITY : 344.54 MCM

344.54

[FAISAL SARDAR] 2009-CIV-122

MASS CURVE
9000.00

8000.00

7000.00

6000.00

5000.00
COMM M.I.Y
&
COMM M.UDO

COMMMIY VS TIME

4000.00

COMM M.UDO VS TIME


3000.00

2000.00

1000.00

0.00
1JAN FEB
2
3
4
MAR
APR

5
MAY

6
7
8
9
JUN
JULY
AUG
SEP

TIME

10 NOV
11
OCT

12
DEC

13

[FAISAL SARDAR] 2009-CIV-122

EMPTING & FILLING PROGRAM


1800

1600

1400

SURPLUS
PERIOD

1200

M.I.Y
&
M.UDO

1000
MIY VS TIME

800

M.UDO VS TIME

DEFICIT
PERIOD

600

400

200

0
1
JAN

2
FEB

3
MAR

4
APR

5
MAY

6
JUN

7
JULY

TIME

8
AUG

9
SEP

10
OCT

11
NOV

12
DEC

13