BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 1 Excavation in foundation in ordinary soil (clay or sand) including lift upto 1.5 meter (loam, (5 ft.) and lead upto 30 meter (100 ft) and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 30 meters (100 ft.) from the foundation trenches. (CSI No. 4.01) 2 Clearing jungle including uprooting of rank vegetations, grass, bush, trees and saplings of girth upto 30cm measured at a height of 1.0 meter above ground level including removal of rubbish upto a distance of 50 meters outside the periphery of area cleared. (CSI No. 4.09) 3 Concrete with 4 cm gauge I class brick ballast (class 150) with coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 12:6:1 in foundation and under floors including supply of all materials, labours and tools and plants etc. required for proper completion of the work. (CSI No. 5.01) 4 Precast cement concrete door, sills, chaukhats boundary posts, shelves and similar small work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast in the proportion 1:2:4, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG. G.I. binding wire and including the cost of binding wire, moulds, all other materials, labour and T&P etc. required for proper completion of the work. (CSI No. 5.09) 5 First class brick (class-150) work in 1:6 cement and coarse sand (F.M. 1.8 to 2.5) mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work. (CSI No. 6.01) 6 First class brick work in foundation and plinth old dismantled bricks (supplied by department free of cost) and coarse sand of F.M. 1.8 to 2.5 mortar in 1:6 including supply of all material, labour and T&P etc. required for proper completion of the work. (CSI No. 6.20) Unit Cum Qty. 2.00 Rate 104.00 (Rs. One Hundred four only) Amount 208.00

Sqm.

100.00

4.50 (Rs. Four & Paisa fifty only)

450.00

Cum

0.50

3072.00 (Rs. ThreeThousand seventy two only)

1536.00

Cum

0.10

6148.00 (Rs. Six Thousand one hundred forty eight only)

614.80

Cum

0.50

3498.00 (Rs. Three Thousand four Hundred ninety eight only) 1538.00 (Rs. One Thousand Five Hundred Thirty Eight only)

1749.00

Cum

1.00

1538.00

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 2

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 7 Indian salwood wrought framed and fixed including simple moulding straight work as in chaukhts including supply of all material, labour and T&P etc. required for proper completion of the work. (CSI No. 8.02) 8 Supply and fixing of galvanized mosquito proof heavy quality iron wire gauge or expanded metal heavy quality (24 x 16 gauge) over door/window old shisham wood beading and supply and fixing necessary screws, nails and all materials labour and T&P etc. required for proper completion of the work. (CSI No. 8.49) 9 Providing and fixing of shisham wood beading of tappered section of (35x10x5) mm with screws, nails etc. including supply of all materials, labour and T&P etc. required for proper completion of work. (CSI No. 8.66)(b) Renewing panes of glass including supply of glass panes 4 mm thick with putty and brads including supply of all materials, labour and T&P etc. required for proper completion of the work. [CSI No. 20.04 (b)] Supply and fixing ISI marked approved quality following oxidised iron fitting in old doors and windows, shutters with screws, nuts, bolts, etc. including cartage of material, labour and T&P etc. required for proper completion of the work. No. 1.00 44.00 (Rs. Forty four only) 38.00 (Rs.Thirty Eight only) 31.00 (Rs. Thirty One only) 33.00 (Rs Thirty Three only) 75.00 (Rs. Seventy five only) 36.50 (Rs. Thirty Six & Paisa Fifty only) 13.30 (Rs. Thirteen & Paisa Thirty only) 44.00 Unit Cum Qty. 0.02 Rate 59275.00 Rs. Fifty Nine Thousand Two Hundred Seventy five only) 739.00 (Rs. Siven Hundred thirty Nine only) Amount 1185.50

Sqm.

1.50

1108.50

RM

4.00

34.00 (Rs. Thirty four only)

136.00

10

Sqm.

1.00

388.00 (Rs. Three Hundred Eighty Eight only)

388.00

11

(a) Tower bolts 10 mm dia x 200 mm log. ( C.S.I No. 22.88 (b) (b) Tower bolts 10 mm dia x 150 mm log. ( C.S.I No. 22.88 (c) M.S. Hinges 100 mm size. ( C.S.I No. 22.88 (d) (d) Handles, 100 to 150 mm size long. ( C.S.I No. 22.88 (f) (e) L-drop 16 mm dia x 250 mm long. C.S.I No. 22.88 (g) 12(a) Easing door and windows (CSI No. 20.05) (

No.

1.00

38.00

No.

2.00

62.00

No.

1.00

33.00

No.

1.00

75.00

Each

1.00

36.50

(b) Labour for fixing door bolts or hinges or tower bolts or hasp and staples or handles etc. to door and windows. (CSI No. 20.10)

Each

4.00

53.20

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 3

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 13 Mild Steel or Iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks and authorised overlapping shall be measured. (steel shall be arranged by the contractor). (CSI No. 9.05) 14(a) Providing barbed iron wire fencing including fixing in to post after straightening it including labour and T&P etc. required for proper completion of the work but excluding supply of posts and wire. (labour rates only) (CSI NO. 9.12) (b) Same as item No. 15(a) above but also including stretching, fixing into the post including all labour, materials and T&P required for proper completion of work the weight of hot dipped GI barbed wire having 12 SWG- 2 ply wires and 4 point ordinary barbs @ 150 mm (approx) C/C should be 100 gm per Meter. (CSI No. 9.13) 15 Supply and fixing welded wire mesh size 75mm x 25mm and rectangular made out of 10 SWG over M.S. angle frame with M.S. flat with nut and bolts welded as required including cost of drilling holes, bolts, nuts, washer wilding etc. as required including cost of all labour, materials, T&P require for proper completion of the work except cost of angle iron and flat. (CSI No. 933). Supply & fixing hold fasts 300x40x6 mm flat iron with 10 mm dia bolts with nut including grouting in CC 1:2:4 size of block 230x115x75 mm (CC shall be measured separately) (CSI No. 9.28) Spreading over leaky roofs with bitumen paints at 10 Lbs. per 100 sq.ft. or 1 LB (0.45 Kg.) per sq.m. including sweeping, cleaning the roof with brushes, heating of the paints up to the required temperature, pouring it on the surface, spreading of necessary quantity of approved coarse sand 1 cft. per 100 sft. and including supply of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 10.08) 12 mm thick plaster in 1:6 with cement and coarse sand mortar. (CSI No. 11.10) Unit MT Qty. 0.01 Rate 69500.00 (Rs. Sixty Nine Thousand Five Hundred only) Amount 695.00

RM

50.00

2.20 (Rs. Two & Paisa Twenty only)

110.00

Kg

2.00

95.40 (Rs. Ninty Five and Paisa Fourty only)

190.80

Sqm.

1.00

575.00 (Rs. Five Hundred Seventy Five only)

575.00

16

Each

1.00

66.10 (Rs.Sixty six & Paisa Ten only)

66.10

17

Sqm.

1.00

42.90 (Rs. Forty Two & Paisa Ninety only)

42.90

18

Sqm.

5.00

125.00 (Rs. One hundred Twenty Five only)

625.00

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 4

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 19 Same as Item No. 18 above but in patches (CSI No. 11.10+20.02) Unit Sqm. Qty. 10.00 Rate 156.25 (Rs. One Hundred fifty six & Paisa Twanety five only) 54.70 (Rs. Fifty Four & Paisa Seventy only) Amount 1562.50

20

21

22

23

Supply and mixing approved water proofing compound in cement mortar in plaster or concrete work in the proposition as recommended by the manufacturer. (CSI No. 11.18) 2.5 cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand, and 2 cm (3/4") graded approved stone ballast laid in panels finished with 3 mm (1/8") floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified without base concrete including supply of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 12.02) Repair to 2.5 cm thick 1:2:4 plain CC floor in patches/panels with cement, approved coarse sand and 2 cm gauge approved stone ballast in panels finished with 3 mm floating coat of neat cement including dismantling and removal of old damaged floor and also including supply of all material, labour and T&P etc. (CSI No. 12.02+20.03) First class brick on edge floor laid dry, joints sand filled, including preparation of base to proper slope and its ramming including supply of all material labour & T&P etc. required for proper completion of the work. (CSI No. 12.08) Same as Item No. 23 above but bricks laid flat (CSI No. 12.11) 1st class brick on edge floor laid dry joints sand filled but resoling work with existing bricks, including preparation base to proper slope and its ramming including supply of labour T&P etc. (labour only) (CSI No. 20.24) Providing and fixing glass strips of 3.15 mm thickness in joints of floor and skirting at the time of laying, floors flush with floor level including labour, Tools and plants etc. complete. (CSI No. 12.18) (a) of 25 mm depth. Painting or varnishing one coat synthetic enamel paint (Berger/Luxol) or varnish on previously painted surface on wood work or iron work including its sand papering, rubbing and cleaning as required, for proper completion of work. (CSI No. 13.03)

Kg

1.00

54.70

Sqm.

3.00

202.00 (Rs. Two Hundred Two only)

606.00

Sqm.

5.00

252.50 (Rs. Two Hundred Fifty Two & Paisa Fifty only)

1262.50

Sqm.

1.00

338.00 (Rs. Three Hundred Thirty Eight only)

338.00

24

Sqm.

1.00

297.00 (Rs. Two Hundred ninety seven only) 113.00 (Rs.One hundred Thirteen only)

297.00

25

Sqm.

5.00

565.00

26

RM

8.00

18.80 (Rs. Eighteen & Paisa Eighty only)

150.40

27

Sqm.

20.00

36.60 (Rs. Sixty six & Paisa sixty only)

732.00

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 5

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 28 Same as item No. (27) above but for every coat after first coat. (CSI No. 13.02) 29 Finishing walls with one coat of water proof cement paint of approved quality like "Super Snowcem" or equivalent on previously old treated surface with this paint to give an even shade including supply of all materials, labour and Tools & plants etc. required for proper completion of work. (CSI No. 13.09) Same as item No. (29) above but for each coat of water proof cement paint after the first coat. (CSI No. 13.08) White washing two coats including cost of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 14.02) Colour washing two coats, using approved colouring materials, of buff, blue gray or brown shade including supply of all materials, labour and T&P etc. for proper completion of the work. (CSI No. 14.05) One coat of dry distemper on previously treated old surface including supply of all materials, labour and T&P etc. for proper completion of the work. (CSI No. 14.08) Scrapping old white or colour wash or distemper including disposal refuse as directed by the Engineer-Incharge within a distance of 60 M. (CSI No. 15.10) Dismantling of existing plaster including disposal of refuse as directed by the Engineer-Incharge within a distance of 60 M. (CSI No. 15.09) Providing and fixing stop/bib cock (brass) 15 mm dia 200 gm weight of approved superior quality. (CSI No. 26.52) Providing and fixing 15 mm dia C.P. pillar cock of approved make including cost of all materials, cartage, labour, T&P etc. required for proper completion of work. (CSI No. 26.66) Supply and fixing C.P. Brass stop cock heavy quality 15 mm dia ISI mark including cutting and threading the pipe if required including supply of all materials, labour, T&P etc. required for proper completion of work. (CSI No. 26.59) Unit Sqm. Qty. 20.00 Rate 26.80 (Rs. Twenty six & Paisa Eighty only) 25.50 (Rs. Twenty five & Paisa fifty only) Amount 536.00

Sqm.

50.00

1275.00

30

Sqm.

50.00

16.70 (Rs. Sixteen & Paisa seventy only) 6.60 (Rs. Six & Paisa sixty only) 11.80 (Rs. Eleven & Paisa Eighty only)

835.00

31

Sqm.

160.00

1056.00

32

Sqm.

80.00

944.00

33

Sqm.

80.00

13.50 (Rs. Thirteen & Paisa fifty only) 7.80 (Rs. Seven & Paisa Eitghty only) 25.30 (Rs.Twenty five & Paisa Thirty only) 303.00 (Rs. Three Hundred Three only) 624.00 (Rs. Six Hundred Twenty four only) 519.00 (Rs. Five Hundred Nineteen only)

1080.00

34

Sqm.

100.00

780.00

35

Sqm.

10.00

253.00

36

Each

5.00

1515.00

37

Each

2.00

1248.00

38

Each

2.00

1038.00

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 6

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 39(a) Providing and fixing 15 mm dia B-class Jindal, JTC, ISI marked G.I. pipes complete with special such as bend, tee, socket, cross, clamp etc. earth work including filling the trenches etc. required for proper completion of the work, the rate also includes concealed GI fitting where required, cutting and making good the walls etc and all materials, labour and T&P complete. (CSI No. 26.01) (b) Same as Item No. 39(a) above but for 20 mm dia. (CSI No. 26.02) (c) Same as Item No. 39(a) above but for 25 mm dia. (CSI No. 26.03) (d) Same as Item No. 39(a) above but for 32 mm dia. (CSI No. 26.04) 40 S/F P.V.C. float for float valve 15 mm with brass rod and union. (CSI No. 26.28) Unit RM Qty. 8.00 Rate 167.00 (Rs. One Hundred sixty seven only) Amount 1336.00

RM

20.00

RM

3.00

RM

1.00

Each

1.00

203.00 (Rs. Two Hundred Three only) 279.00 (Rs. Two Hundred Seventy Nine only) 344.00 (Rs. Three Hundred Forty four only) 223.00 (Rs. Two Hundred Twanety Three only) 42.90 (Rs. Forty two & Paisa Ninety only)

406.00

837.00

344.00

223.00

Supply and fixing P.V.C./C.I. Bibcock 15 mm dia of approved quality (old cock shall be the property of contractor).[CSI No. 26.52(d)] 42 Providing and replacing of the following galvanized iron fittings in existing pipe line including cutting, threading in pipe if required. (Chapter 24.00) (a) GI Elbows 15 mm dia ((CSI No. 26.78)(a) 41 (b) GI Socket 15 mm dia (CSI No. 26.75)(a) (c) GI Elbow 20 mm dia (CSI No. 26.78)(B) Socket (d) GI (CSI No. 26.75)(B) (e) G.I. Tee 15 mm dia (CSI No. 26.76) (a) 20 mm dia.

Each

10.00

429.00

No.

10.00

No.

10.00

No.

5.00

No.

5.00

No.

3.00

35.20 (Rs. Thirty five & Paisa Twenty only) 30.80 (Rs. Thirty & Paisa Eighty only) 49.50 (Rs. Forty Nine & Paisa fifty only) 46.20 (Rs. Forty six & Paisa Twenty only) 73.70 (Rs. Seventy Three & Paisa seventy only) 95.70 (Rs. Ninety five & Paisa seventy only) 81.40 (Rs. Eighty One & Paisa forty only) 129.00 (Rs. One Hundred Twenty Nine only)

352.00

308.00

247.50

231.00

221.10

(f)

G.I. Tee 20 mm dia (CSI No. 26.76)(B)

No.

3.00

287.10

(g) G.I. Union 15 mm dia (CSI No. 26.79)(A) (h) G.I. Union 20 mm dia (CSI No. 26.79)(B)

No.

2.00

162.80

No.

2.00

258.00

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 7

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 43 Repair of sluice valve 80mm size including repair of valve seat & spindle etc. NSI. Unit Job Qty. 1.00 Rate 359.80 (Rs. Three Hundred Fifty Nine & Paisa Eighty only) 667.00 (Rs. Six Hundred sixty seven only) Amount 359.80

44

Dismantling reinforced cement concrete or reinforced brick work. Including stacking of dismantled materials as directed by the Engineer I/C within a distance of 60 meters. (CSI No. 15.03). One Coat of ready mixed primer of 'Burger' or equivalent brand on new iron/wood surface including supply of all material, labour & T&P etc. required for proper completion of the work. (CSI No. 13.01-13.02) Cleaning of existing water pipe line having dia upto 50 mm including digging trenches opening and cleaning of pipes, cutting threading if required and refilling of earth and including making good the road and wall etc.as directed by the Engineer-I/C. [CSI No. 20.45(b)] Providing and fixing first quality Indian type white glazed earthen wire ISI mark W.C. Pan size 580 mm (Hindustan, Cera make) including supply of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 27.03) Providing and fixing a pair of white glazed foots rests of standard pattern for Indian Type W.C. pan including supply of all materials, labour and T&P etc. reqruied for proper completion of the work. (CSI No. 27.14)

Cum

0.50

333.50

45

Sqm.

10.00

26.70 (Rs. Twenty six & Paisa seventy only)

267.00

46

RM

50.00

52.20 (Rs. Fifty two & Paisa twenty only)

2610.00

47

Each

1.00

790.00 (Rs. Seven Hundred Ninety only)

790.00

48

Pair

1.00

158.00 (Rs. One Hundred Fifty Eight only)

158.00

49

Supply and fixing white glazed earthen-ware W.C. "Orissa" Pan Hindustan make of size (58x44 cm) including supply of all materials labour and T&P etc. complete. [CSI No. 27.02 (b)] supply and fixing wash hand basin (56x41) cm of white glazed earthen ware of hindware /perry or eqyivalent make excluding fittings. (C.S.I. No.27.09)(b)

Each

1.00

1457.00 (Rs. One Thousand Four Hundred fifty Seven only) 1257.00 Rs. One Thousand two hundred fifty seven only)

1457.00

50

Each

1.00

1257.00

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 8

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 51 Providing and fixing 600 mm x 450 mm plain, edge mirror of Atul, Kiran make glass with Indian polish 6.50 mm thick complete with back of 600 mm x 450 mm x 6 mm hard board sheet fixed to wooden cleats with C.P. brass screws and washers including supply of all materials, labour and T&P etc. required for proper completion of the work. [CSI No.27.23 (a)] 52 Supply and replacing of 40 mm dia P.V.C. waste pipe for wash basin/ sink including cost of all labour, materials, and T&P etc. required for proper completion of the work. (CSI No. 20.14) Unit Each Qty. 1.00 Rate 616.00 Rs.(Six hundred eighteen only) Amount 616.00

Each

5.00

66.00 (Rs. Sixty six only)

330.00

Providing and replacing P.V.C. connection pipe 15 mm with two no. brass union. (CSI No. 26.40) 54 Supply and fixing P.V.C. cistern Hindustan or equivalent make 10 litres. Capacity complete with all accessories (Low level) including all materials, labour and T&P etc. complete. [CSI No. 27.16(b)] 55 Providing and fixing fully way G.M. gate valve 25 mm dia with wheel, ISI mark heavy quality including supply of all materials, labour and T&P required for proper completion of work. (CSI No. 26.24) 56 Disposal of rubbish / Debris out side the UPPCL area as per direction of Engineer -in-charge including cartage, labour and materials, T&P etc. required for proper completion of the work. No deduction for voids shall be made. (CSI No. 20.19) 57(A) Cleaning of septic tank including disposal of waste out side the UPPCL area as per direction of the Engineer-in-charge including cost of all labour, T&P etc. required for proper completion of the work. (CSI No. 20.15) (B) Same as Item No. 59(a) above but for inspection chamber. (CSI No. 20.16) 53 58 Cleaning of R.C.C. over head tank upto capacity of one lac litres and chlorinating with bleaching powder mixed to water as per direction of Engineer-in-charge complete. (CSI No. 20.48) Cutting out cracks of roof terrace to V-selection cleaning out, wetting, grouting with cement and sand slurry 1:3 (1 cement and 3 sand) including cost of all materials, labours, T&P etc. required for proper completion of the work. (Cement consumption .004 Bags/RM) (CSI No. 22.55)

Each

4.00

57.00 (Rs. Fifty seven only) 1093.00 (Rs. One thousand Ninety three only)

228.00

Each

1.00

1093.00

Each

1.00

1012.00 (Rs. One thousand Twelve only)

1012.00

Cum

10.00

107.00 (Rs.One hundred seven only)

1017.00

Job

2.00

1295.00 (Rs. One thousand two hundred Ninety five only) 92.80 (Rs. Ninety two & Paisa eighty only) 1301.00 (Rs. One Thousand three hundred one only) 38.60 (Rs. Thirty eight & Paisa Sixty only)

2590.00

No.

5.00

464.00

Job

1.00

1301.00

59

RM

5.00

193.00

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 9

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work Unit Qty. S.No. 1.00 60 Opening, cleaning, overhauling, oiling and Job greasing of defective rolling shutter and also resetting of its springs for its smooth functioning including cost of all materials, labour and T&P etc. (CSI No. 20.27) 10.00 61 Painting and printing house No. or residence in Job circle of size 8" including preparation of base with enameled paint complete as directed by the engineer-in-charge. (CSI No. 20.81) 62 Attending maintenance petty problems with in Per Day 5.00 the reach of one suitable and experienced beldar/mali along with required T&P & sundries. (Chapter 2 Item 9+10%) 63 Attending to petty maintenance service like plumbing service , welder sevice ,and carpenter service required as below. (C.S.I. No.22.71) A Job attending by one no. plumber / welder / mason/ carpenter with one no. helper per hour or part of an hour , hour 10.00 Rate 285.00 (Rs. Two Hundred eighty five only) Amount 285.00

31.90 (Rs. Thirty one & Paisa Ninety only)

319.00

220.00 (Rs. Two Hundred twenty only)

1100.00

67.40 (Rs. Sixty seven & paisa forty only) 95 .00 (Rs. Ninety five only) 14.10 (Rs. Forteen & Paisa ten only)

674.00

Job attending by one no. plumber / welder / mason/ carpenter with two no. helper per hour or part of an hour , 65(a) Cleaning of main drain width less than 300 mm including disposal of waste refuses sludge out side the board's area including washing and cleaning by clean water completely (Rate for cleaning the drain per R.M. per month for cleaning the drains once a week). (CSI No. 20.17) (b) Same as above in item No. 65(a) but for drain of width less than 300 mm. (CSI No. 20.18) B 66 Cement washing two coat with slack lime in ratio 1:2 (Cement : lime) including supply of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 14.09) Same as in Item No. 66 but for subsequent coat. (CSI No. 14.10) Supply and fixing of Syntex or equivalent make water storage tank including all materials, labours, T&P etc required for proper completion of work. (CSI No. 26.50) Oil bound distemper (Berger or equivalent) on old previously distempered surface including supply of material, labour and T&P etc. required for proper completion of work. (CSI No. 13.13)

hour

10.00

950.00

RM

800.00

11280.00

RM

300.00

Sqm.

7.30 (Rs. Seven & Paisa thirty only) 100.00 7.20 (Rs.Seven & Paisa twenty only)

2190.00

720.00

67

Sqm.

100.00

68

Litre

200.00

6.20 (Rs. Six & Paisa twenty only) 9.20 (Rs. Nine & Paisa Twenty only) 22.30 (Rs. Twenty two & Paisa thirty only)

620.00

1840.00

69

Sqm.

50.00

1115.00

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 10

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 70 Same as Item No. 70 above but for each coat after first coat or subsequent coat. (CSI No. 13.14) 71 Supply and planting Ashoka, Pendula, Mango, Neem or other Shadow trees including digging hole of proper size, manure anti termite with proper chemical etc., including cost of all materials, labour and T&P etc. complete in all respects. (CSI No.23.13) 72 (a) Supply and fixing of double action floor spring including cutting in floors and RCC slabs and grouting the same with C.C. & finishing the surface properly as and where required under Al. doors as per direction of Engineer-incharge. The rate includes all labour material and T&P required for completion of work. (CSI No. 8.70) 73 P/F Neosprine Gasket for fixing glass panes of door and window shutters including cost of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 22.52) Cleaning of grass and removal of rubbish up to a distrance of 50 M outside the UPPCL area cleared. (CSI No. 4.10) 75(a) Cement concrete with 2 cm gauge approved hard stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 4:2:1 including supply of all materials, labour, side shuttering if required and T&P etc. required for proper completion of work. (CSI No. 5.06) (b) RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast in proportion 1:2:4 in slabs excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. binding wire and including necessary centering and shuttering etc. and also including cost of all materials, binding wire, labour and T&P etc. required for proper completion of the work (binding wire to be supplied by the contractor free of cost. (CSI No. 5.11) 74 76 Same as above in item No. 75(b) but for R.C.C. raft foundation (CSI No. 5.15) Unit Sqm. Qty. 50.00 Rate 19.40 (Rs. Nineteen & Paisa forty only) 50.00 44.00 (Rs. Forty four only) Amount 970.00

Nos.

2200.00

No.

1.00

2471.00 (Rs. Two Thousand four hundred seventy one only)

2471.00

RM

1.00

84.70 (Rs. Eighty four &paisa Seventy only) 1.70 (Rs. One & Paisa seventy only) 5257.00 (Rs. Five Thousand Two Hundred Fifty Seven only)

84.70

Sqm.

1000.00

1700.00

Cum

0.30

1577.10

Cum

0.10

6613.00 (Rs. Six Thousand Six Hundred Thriteen only)

661.30

Cum

0.10

5539.00 (Rs. Five Thousand five Hundred thirty nine only)

553.90

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 11

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 77 Concrete work with 40 mm gauge brick ballast obtained from breaking brick bats (brick bats supplied by the department free of cost) in proportion of 12:6:1 as in item 5.01 above including cost of all labour, material, T&P etc. required for proper completion of work. (CSI No. 5.22) 78 Mild Steel or Iron work of small size and sections such as holding down bolts, Holdfast tie rods, gratings etc. (when not included in an over all rates) wrought etc. and their fixing, required for proper completion of the work including cost of steel which shall be arranged by the contractor. (CSI No. 9.01) 79 Fixing panes of glass with and including putty brads and including supply of all materials, labour and T&P etc. required for proper completion of the work but excluding cost of glass. (CSI No. 20.07) 80 As in Item No. 79 above but with wooden beading. (CSI No. 20.08) 81 First class brick work in 1:6 with old dismantled bricks with cement coarse sand mortar in 9" (230 mm) thick wall in super structure including all materials, labour T&P etc. except brick which will be issued free of cost. (CSI No.6.20) Supply and sprinkling of lime in all drains of colony and water logged area including cost of all labour, materials and T&P etc. as required for proper completion of the work. (CSI No. 22.72) RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast in proportion 1:2:4 in T-beam-slab and RCC Columns excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including cost of all materials, binding wire, labour and T&P etc. required for proper completion of the work. (CSI No. 5.16) Providing and fixing 15 mm dia PVC ball float valve with brass rod and union complete ISI mark including supply of all materials, labour and T&P etc. required for proper completion of work. (CSI No. 26.28) Unit Cum Qty. 0.20 Rate 2356.00 (Rs.Two Thousand three Hundred fifty six only) Amount 471.20

MT

0.020

68757.00 (Rs. Sixty Eight Thousand seven Hundred Fifty seven only)

1375.14

Sqm.

2.00

124.00 (Rs. One Hundred Twenty four only)

248.00

Sqm.

2.00

223.00 (Rs. Two Hundred Twenty three only) 1538.00 (Rs. One Thousand Five Hundred thirty eight only)

446.00

Cum

0.50

769.00

82

Kg.

10.00

11.00 (Rs. Eleven only)

110.00

83

Cum

0.10

6380.00 (Rs. Six Thousand three Hundred eighty only)

638.00

84

No.

3.00

223.00 (Rs. Two Hundred twenty three only)

669.00

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 12

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 85 Providing and fixing of PVC pipe 6 Kg/Sq.cm for water supply mains and rain water pipe of Tirupati or equivalent make with special such as Tee, bend, socket, elbow etc. including cutting of pipe where necessary and including excavation of trenches for laying the pipe line of approved size (600 x 900 mm) and including its back filling after testing the pipe line, watering, ramming etc. complete including disposal of surplus earth from the sides upto 100 Meter as per direction of Engineer Incharge as required for proper completion of work. (a) 110 mm dia PVC Pipe (CSI No. 26.64 a) Unit Qty. Rate Amount

RM

5.00

(b) 75 mm dia PVC Pipe (CSI No. 26.64 c)

RM

5.00

(c) 50 mm dia PVC Pipe (CSI No. 26.64 e)

RM

5.00

(d) 25 mm dia PVC Pipe (CSI No. 26.64 h)

RM

5.00

86

87

88

Fixing and grouting of 25 mm dia Anchor bolts in proper alignment level and setout with the help of a template including supply of all labour T&P etc. required for proper completion of the work. (CSI No. 9.21) Providing and fixing full way G.M. gate valve 15 mm dia with wheel, ISI mark heavy quality including supply of all materials, labour and T&P required for proper completion of work. (CSI No. 26.22) Same as Item No. 87 above but for 20 mm dia (CSI No. 26.23) 3 mm thick floating coat of neat cement finish including supply of all materials, labour and T&P etc. required for proper completion of the work. (including cost of cement), cement consumption 0.044 bag/Sq.m. (CSI No. 20.23) Filling of 20 mm wide 80/100/115 mm deep joint with coarse sand and saw dust mixed with hot bitumen etc. complete (CSI No. 18.20) Providing Gola 75 x 75 mm in C.C. 1:2:4 with coarse sand and 10 mm down grit including finishing with cement mortar 1:3 as per standard design. (CSI No. 10.17)

No.

4.00

224.00 (Rs. Two Hundred twenty Four only) 116.00 (Rs. One Hundred sixteen only) 73.00 (Rs. Seventy three only) 30.80 (Rs. Thity & paisa eighty only) 58.20 (Rs. Fifty eight & Paisa Twenty only)

1120.00

580.00

365.00

154.00

232.80

No.

1.00

509.00 (Rs. Five Hundred Nine only)

509.00

No.

1.00

89

Sqm.

5.00

675.00 (Rs. Six Hundred seventy five only) 21.80 (Rs. Twenty one & Paisa eighty only)

675.00

109.00

90

RM.

10.00

91

RM

20.00

37.40 (Rs. Thirty seven & paisa forty only) 53.40 (Rs. Fifty three & Paisa forty only)

374.00

1068.00

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 13

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------Item of Work S.No. 92 S/F 6 mm white glazed tiles of size 200x300 mm in skirting, wall or dado laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials, labour and Tools and Plants etc. required for proper completition of the work. (CSI No. 12.17a) 93 S/F 6 mm white glazed tiles of size 300x300 mm in flooring laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials, labour and Tools and Plants etc. required for proper completion of the work. (CSI No. 12.17b) Dismantling doors or windows including chaukhats with hold fasts and including stacking of materials as directed by the Engineer-I/C within a distance of 60 metres. (CSI No. 15.07) Providing and mixing "Acrocrete" or any other approved polymer modified water proofing coating system in cement mortar for filling cracks in plaster or concrete work in proportion as recommended by the manufacturer including supply of all materials, labour and T&P etc. as required for proper completion of the work. (CSI No. 22.78) Extraction of defective chocked hand pump machines with variable length of pipe and strainer and reinsertion of complete assembly afters its repairing such as welding of pipe handle jhoola and replacing strainer bolts, nuts, washers Rubber seats etc. if also cleaning borehole by boring etc. if necxessay.(old SOR, CSI NO. 20.41) Replacing of plastic mesh with new strainer (fitter) including dismantling of old damaged plastic mesh cleaning of the holes etc. complete. (Old SOR, CSI NO, 20.39) Development of hand pumps by operating continuously for clean water with testing and commissioning etc. (Old SOR, CSI NO. 20.43) Boring with 4" dia (100 mm) casing pipe upto 6 meter depth (Old SOR, CSI NO. 20.37) Unit Sqm. Qty. 0.50 Rate 1000.00 (Rs.One thousand Only) Amount 500.00

Sqm.

0.50

981.00 (Rs. Nine Hundred eighty one only)

490.50

94

Sqm.

10.00

44.30 (Rs. Forty Four & Paisa Thirtty only)

443.00

95

Kg

3.00

332.00 (Rs. Three Hundred Thirty Two only)

996.00

96

1.00

Each

450.00 (Rs Four Hundred Fifty Only)

450.00

97

1.00

Each 72.00 (Rs. Seventy Two Ony)

72.00

98

1.00

Job

99

1.00

Rm

325.00 (Rs. Three Hundred Twenty Five Only) 133.00 (Rs. One Hundred Thirty Three Only)

325.00

133.00

100 Boring with 4" dia (100 mm) casing pipe beyound 6 meter to 50 meter depth (Old SOR, CSI NO. 20.38)

169.00 169.00 (Rs One Hundred Sixty Nine Only) TOTAL 94209.84 Rs. Eighty Sixe Thousand Eight Hundred Twenety Two and Paisa Seventy Three Only TOTAL 94209.84

1.00

Rm

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

Page 14

BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT 132. KV SUB-STATION --------------------------S.No. Item of Work Unit Qty. Rate Amount Rs. Eighty Sixe Thousand Eight Hundred Twenety Two and Paisa Seventy Three Only

J.E.

S.D.O.

COMPUTER / J.E.

E.E.

You might also like