BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
Sl. No. 1 Items of work Excavation in foundation in ordinary soil (Loam or Sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-incharge upto a distance of 30m from the foundation trenches. C.S.I. No. 4.01 Sand filling in plinth including supply of necessary quantity of local sand obtained from outside the UPPCL premises including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of work. C.S.I. No. 4.05 Earth filling under floors and/or sub station area including cost of earth when obtained from outside UPPCL area including its carriage including watering, ramming in 20 cm layers and dressing of earth etc. all complete. CSI No. 4.11 Concrete with 4cm gauge Ist class brick ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 12:6:1 in foundation and under floors including supply of all materials, labour and tools and plants etc. required for proper completion of the work. C.S.I. No. 5.01 Same as above but with stone ballast. (CSI No. 5.02 ) Unit Qty Rate

M3

1100.00

57.60 (Rs. Fifty Seven & paisa sixty only

150.00

285.00 (Rs. Two hundred eighty five only)

11500.00

135.00 (Rs. One hundred thirty five only)

300.00

2040.00 (Rs. Two Thousand forty only 2576.00 (Rs. Thousand five hundred seventy six only 2195.00 (Rs. Two thousand one hundred ninety five only) 2338.00 (Rs. Two thousand three hundred thirty eight only) 2317.00 (Rs. Two thousand three hundred seventeen only.

200.00

First class brick work in 1:6 cement and coarse sand (F.M. 1.8 to 2.5) mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work. CSI No. 6.01 First class brick work in 1:4 cement and coarse sand (F.M. 1.8 to 2.5) mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work. CSI No. 6.03 First class brick work in 1:6 cement and coarse sand (F.M. 1.8 to 2.5) mortar in supre structure including necessary cutting and moudling of bricks as required and also including honeycombs bricks work thickness of wall not to be less than 1.5 brick. C.S.I. No. 6.01+6.07.

M3

400.00

M3

350.00

M3

100.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 2

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
9 Same as item No. (8) above but in (230) mm thick wall in super structure including necessary cutting and moudling of bricks as required and also including honey comb bricks work including supply of all material, labour and T&P etc. required for proper completion of the work CSI No. 6.01+6.07+6.08

M3

200.00

2423.00 (Rs. Two thousand four hundred twenty three only) 2619.20 (Rs. Two thousand six hundred ninteen & paise twenty only) 375.00 (Rs. Three hundred seventy five only) 165.70 (Rs. One hundred sixty five & seventy paisa only) 3613.00 (Rs. Three thousand six hundred thirteen only

10(a) Same as item No. (9) above but in 1:4 cement coarse sand mortar in half brick (115 mm thick in super structure including supply of all material, labour T& P etc. required for peoper completion of the work. CSI No. 6.03+6.07+6.09 (b) Add to item no. 10(a) above for one brick masonry in circular masonry walls. CSI No. 6.14

M3

35.00

M2

7.00

11

12

13

14

2.5 thick damp proof course in cement concrete consisting of 1 part cement 1.5 parts approved coarse sand, and 3 parts approved 13mm graded stone grit and also including water proofing material as order by the Engineerincharge in the proportion as specified by the manufacturer. C.S.I. No. 7.02 Cement concrete with 2 cm gauge approved hard stone ballast, coarse sand (FM 1.8 to 2.5) and cement in proportion of 4:2:1 including supply of all materials, labour, side shuttering if required and T&P etc. required for proper complition of the work.CSI No.5.06 R.C.C. work with cement approved coarse sand (FM 1.8 to 2.5 ) and 2 cm gauge graded approved hard stone ballast in proportion 1:2:4 in lintels/ Bands of doors, windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centring and shuttering etc. and also including cost of all materials, binding wire, labour and T&P etc. required for proper complition of the work. CSI No. 5.10 R.C.C. work with cement approved coarse sand (FM 1.8 to 2.5 ) and 2 cm gauge graded approved hard stone ballast in proportion 1:2:4 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centring and shuttering etc. and also including cost of all materials, binding wire, labour and T&P etc. required for proper complition of the work. CSI No. 5.11

M2

10.00

M3

170.00

M3

20.00

4133.00 (Rs. Four thousand one hundred thirty three only)

M3

35.00

4764.00 (Rs. Four thousand seven hundred sixty four only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 3

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
15 R.C.C. work with cement approved coarse sand (FM 1.8 to 2.5 ) and 2 cm gauge graded approved hard stone ballast in proportion 1:2:4 in lighter beams having span upto 6.0 mtrs excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centring and shuttering etc. and also including cost of all materials, binding wire, labour and T&P etc. required for proper completion of the work. CSI No. 5.12 Same as item No. (13) above but in heavier beams having span more than 6.0m CSI No. 5.13 17 Same as item No. (13) above but in R.C.C. T. beams slab & columns CSI No. 5.16 18 Same as in item No. (13) above but in R.C.C. raft foundation and footing. C.S.I. No. 5.15 19 12mm thick plaster with cement mortar in proportion 1:6 cement and coarse sand of 1.8 to 2.5 fineness modulus over brick work minimum thickness not to be less than 10 mm. including supply of all materials, labour and T&P etc. required for proper completion of the work. C.S.I. No. 11.10 12mm thick plaster with cement mortar in proportion 1:4 cement and coarse sand of 1.8 to 2.5 fineness modulus over brick work minimum thickness not to be less than 10 mm. including supply of all materials, labour and T&P etc. required for proper completion of the work. C.S.I. No. 11.08 Add for extra labour to all item of plaster if done on ceiling. C.S.I. No. 11.11 Add for extra labour & materials for plaster over rough face of one brick thick wall. CSI No. 11.15 2cm thick palster in dado or skirting consisting of one part of cement and two parts of approved coarse sand laid in panels finished with 3mm. Floating coat of neat cement or cement and marble dust in ratio of 2:1 including supply of all materials, labour & T&P required for proper completion of the work. CSI No. 11.16 M3 300.00 M3 150.00

M3

35.00

5158.00 (Rs. Five thousand one hundred fifty eight only)

16 M3 5.00

5592.00 (Rs. Five thousand five hundred nintey two only) 5237.00 (Rs. Five thousand two hundred thirty seven only) 3909.00 (Rs. Three thousand nine hundred nine only) 76.40 (Rs. Seventy Six & forty paisa only)

M2

3000.00

20

M2

2000.00

84.00 (Rs. Eighty Four only)

21

M2

200.00

6.40 (Rs. Six & paisa forty only) 7.00 (Rs. Seven only)

22

M2

1000.00

23

M2

10.00

137.00 (Rs. One hundred thirty seven only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 4

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
24 Providing (12x15) mm section groove in plaster at the junction of ceiling & walls, including all material, labour and (T&P) etc. required for proper completion of the work. CSI No. 11.19 3mm. thick floating coat of neat cement finish including supply of all materials, labour and T&P etc. required for proper completion of the work. (including cost of cement), cement consumption 0.044 bag/Sq.m.CSI No 20.23 Making drip course (25x12) mm. in 1:2 cement and course sand including supply of all materials, labour and T&P etc. required for proper completion of the work. CSI No. 11.22 Mild steel or iron in plain work such as rainforced concrete or reinforced brick work (when not included in an over all rates ) wrought to required shape as necessary including supply of steel , its wastage , bend , hooks and authorized overlapping shall be measured (steel not to be supplied by the departments). CSI No. 9.05 Supply and fabrication of M.S. (tor) reinforcement cages for piles including cutting, bending, welding as per design and placing of the cage in the pile bore including cost of all material, labour and T&P etc. as may be required for proper completion of the work including all incidental wastage. (Steel shall be arrnaged by the contractor). C.S.I. No. 21.22 R.C.C. work with cement, approved coarse sand 2 cm gauge approved stone ballast in 1:2:4 proportion for concreting in all type of piles labour for proper completion of the work. Measurement of work be done according to design diameter and depth of pile upto cut off level. Under reamed concrete shall be measured as per IS 2911 Part-II, the rates are including cost of cement. C.S.I. No. 21.24. Providing and fixing of 110 mm dia. PVC pipe 6Kg/Sq.cm for water supply mains and rain water pipe of Tirupati or equi. make with special such as Tee, bend, socket, elbow etc. including cutting of pipe where necessary and including excavation of trenches for laying the pipe line of approved size (600x900 mm) and including its back filling after testing the pipe line, watering, ramming etc. complete including disposal of surplus earth from the sides upto 100 Meter as per direction of Engineer/IC as required for proper completion of work. CSI No. 26.64 (a) 4.80 (Rs. Four & paisa eighty only) 17.00 (Rs. Seventeen only) 7.50 (Rs. Seven & paisa fifty only)

RM.

300.00

25

M2

300.00

26

RM.

200.00

27

MT

25.00

59134.00 (Rs. Fifty Nine thousand one hundred thirty four only)

28

MT

25.00

60021.00 (Rs. Sixty thousand twenty one only)

29

250.00

4400.00 (Rs. Four thousand four hundred only)

30

RM.

60.00

195.00 (Rs. One hundred ninety five only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 5

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
31 Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to and also fixing in proper position and alignment including supply of steel bolts nuts wastage etc. and their fixing required for proper completion of the work, including cost of steel (which shall be arranged by the contractor.) CSI No. 9.03 Providing M.S. Frames work for R.C.C. trench covers and edging with M.S. Angles including cutting, bending and welding of M.S. Angle and cutting and welding of M.S. bars for reinforcement and lifting hooks as per approved design. The rate is including cost of all materials, labour etc. as required for proper completion of the work.CSI No. 9.27 S/F hexagonal fan box with hexagonal side of approx 80 mm in length fabricated from 16 SWG MS sheet incorporating 10 mm dia M.S. round bar duly bent for supporting fan hanger duly painted with red oxide and screwing arrangement with wiring conduit laid in the R.C.C. roof before concreting along with supply of all material, labour, T&P etc. required for proper complition of the work. Electrical schedule Item 1149 34 Supply and fixing rolling shutters of approved make made of 80x1.25mm gauge cold rolled M.S. lathes inter locked through out their inner length and joined together at the end by end lock and mounted on specially designed pipe shaft with brackets side guides and arrangements for inside and outside locking with push and pull operation complete but excluding the cost of top cover and springs. CSI No. 9.15

MT

18.00

61277.00 (Rs. Sixty one thousand two hundred seventy seven only)

32

MT

12.00

58507.00 (Rs. Fifty eight thousand five hundred seven only)

33

Nos.

10.00

94.00 (Rs. Ninty four only)

M2

14.00

1343.00 (Rs. One thousand three hundred forty three only)

35 Providing and fixing 27 cm. long wire spring grades 2 for rolling shutters. CSI No. 9.16 36 Providing and fixing top cover for rolling shutters. CSI No. 9.17 RM. 6.00 Each 6.00

425.00 (Rs. Four hundred twenty five only) 391.00 (Rs. Three hundred ninty one only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 6

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
37 2.5cm. thick 1:2:4 plain cement concrete floor with cement approved coarse sand and 2cm. graded approved stone ballast laid in panels finished with 3mm. floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified over marble dust in ratio of 5:1 as specied over without base concrete, including supply of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 12.02) Same as item No. 37 but 40mm thick 1:2:4 plain cement concrete floor complete. CSI No. 12.03 Providing and fixing glass strips of 5.50 mm. thickness in joints of floor and skirting at the time of laying, floors flush with floor level including labour, Tools and plants etc. complete. (a) of 40 mm. depth. CSI No. 12.19 + Diffrence of thickness Providing and fixing glass strips of 3.15 mm. thickness in joints of floor and skirting at the time of laying, floors flush with floor level including labour, Tools and plants etc. complete. (a) of 25 mm. depth. CSI No. 12.18 Flooring with 25mm. thick Kota stone slab over lease of 20mm. thick cement mortar 1:6 mix and jointed with grey cement slurry mixed with pigment to match the shade of slab including rubbing and polishing complete for proper completion of the work. CSI No. 12.24 S/F 6mm white glazed tiles of size 200x300 mm in skirting, wall or dado laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials labour and Tools and Plants etc. required for proper completion of the work. CSI No. 12.17 (a). S/F 6mm white glazed tiles of size 300x300 mm in flooring laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials labour and Tools and Plants etc. required for proper completion of the work. CSI No. 12.17 (b). Supply and fixing of 4 cm thick C.P. Teak wood fully pannelled door and window shutter including supply and fixing of wooden cleats and stoppers and including fixing and adjustment of hinges bolts, locks, handles, springs and/or other fittings but excluding their supply but including painting with two coats of black Japan on all Iron fittings if necessary. C.S.I. No. 8.10

300.00

134.00 (Rs. One hundred thirty four only)

38

M2

1000.00

200.00 (Rs. Two hundred only) 16.20 (Rs. Sixteen & Paisa Twenty only)

39

RM.

300.00

40

RM.

100.00

13.10 (Rs thirteen & Paisa Ten only)

41

M2

160.00

695.00 (Rs. Six hundred ninty five only)

42

M2

45.00

800.00 (Rs. Eight hundred only)

43

25.00

795.00 (Rs. seven hundred ninty five only)

44

M2

3.60

3452.00 (Rs. Three thousand four hundred fifty two only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 7

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
45 Same as above item No. (44) but for jali door shutter with panels of heavy quality galvanized iron wire mesh of size 14x24. C.S.I. No. 8.45 2577.00 (Rs. Two thousand five hundred seventy seven only)

M2

12.00

46

Providing and fixing 40mm. thick of double leaf flush door shutter (boiled water resistance, phenol Fermaldehide resin bonded, hot pressed factory made) commercial quality to I.S.2202 part1 (1983) ISI marked including and adjustment of hinges, including supply of all labour, materials and T&P etc. required for work. CSI No. 8.80(c) + 8.80(d)

M2

3.60

1221.00 (Rs. One thousand two hundred twenty one only)

47(a) Providing and fixing 32mm. thick of single leaf flush door shutter (boiled water resistance, phenol Fermaldehide resin bonded, hot pressed factory made) commercial quality to I.S.2202 part1 (1983) ISI marked including and adjustment of hinges, including supply of all labour, materials and T&P etc. required for work. CSI No. 8.80(a). (b) Same as above but for double leaf shutter. C.S.I. No. 8.80(d).

20.00

975.00 (Rs. Nine hundred seventy five only)

M2

4.00

48

Approximate cost of anodized Aluminum fitting with screw bolts and nuts for door, windows etc. CSI No. 8.59. Supply and fixing galvanished mosquito proof jali (14x24 gauge) with M.S. flat of 20x3 mm. size, on both sides screwed or welded to window or door frame. CSI No. 9.25 Painting or varnishing new iron work in small area or new wood work with one coat of ready mixed priming paint and two coat of approved superior quality ready mixedpaint "Luxol" or equilent make including supply of all material labour T&P etc. required for proper completion of the work (paint to be used should confirm I.S. 103-1950 CSI No. 13.01+13.02 Cement washing one coat with slack lime in ratio 1:2 (Cement : lime) including supply of all materials, labour and T&P etc. required for proper completion of the work.CSI No. (14.09) Same as item no. (51) for additional coat. C.S.I. No. 14.10

M2

35.00

49

M2

35.00

1030.00 (Rs. One Thousand thirty only) 240.00 (Rs. Two hundred forty only) 549.00 (Rs. Five hundred forty nine only)

50

M2

1000.00

53.80 ( Rs Fifty three & eighty paise only)

51

M2

3000.00

4.70 (Rs.Four & paisa seventy only) 3.60 (Rs. Three & paisa sixty only)

52

M2

3000.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 8

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
53 Painting one coat with APEX or equivalent brand weather coat paint on new wall surfaces (well prepared with Birla putty and one coat of primer ICI or equivalent which shall be paid separately) including through washing with water including cost of all materials, labour, T&P required for proper completion of work. CSI No 13.23 Same as in item no 42 above but for every additional coat of water proof emulsion paint APEX / weather sheild over first first coat as per direction of Engineer In Charge including cost of all materials, labour, T&P required for proper completion of work. CSI No 13.24 White washing with three coats including supply of all materials, labour and T&P etc. required for proper completion of the work. CSI No. 14.03 One priming coat and one coat oil bound distemper on new work including preparation of base with whitings, including supply of all materials, labour and T&P etc. required. CSI No. 13.17 As item no. 56 above but for every coat after first coat, including supply of material, labour and T&P required for proper completion of work. CSI No. 13.14 Chemfering the edge of concrete in autxilary structure of size 25 mm wide in traingular section including all materials, labour and T&P etc. complete. CSI No. 11.21 Placing of trench cover of all size in proper position including transportation from different places the S/S area including all labour, T&P etc. required for proper completion of the work as per direction of Engineer-in-charge. CSI No. 20.11 Providing and fixing white glazed earthen ware W.C. "Orissa" pan Hind Ware or equivalent make of size (58x44) cm including supply of all materials, labour and T&P etc. complete. CSI No 27.02(b) Providing and fixing P.V.C. cistern Hindware or equivalent make 10 litres. Capacity complete with all accessories (Low level) including all materials, labour and T&P etc. complete. CSI No. 27.16(b),

M2

500.00

41.00 (Rs Forty one only)

54

M2

500.00

21.00 (Rs. Twenty one only)

55

M2

200.00

6.00 (Rs. Six only) 29.70 (Rs. Twenty nine & paisa seventy only)

56

M2

400.00

57

M2

400.00

11.80 (Rs. Eleven & paisa eighty only

58

RM.

1000.00

4.60 (Rs. Four & paisa sixty only)

59

No.

1100.00

5.60 (Rs. Five & sixty paisa only) 1244.00 (Rs. One thousand two hundred forty four only) 1430.00 (Rs. One thousand four hundred thirty only

60

Each

2.00

61

Each

2.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 9

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
62 Providing and fixing 550 mmx400 mm. wash hand basin of white glazed earthen ware first quality I.S.I. marked (Hindware, Neycer/Cera make) with R.S. or C.I. braket painted white 15 mm dia C.P. brass pillar cock with C.P. metal handle (Weight not less than 400 qms.) I.S.I. marked and 32 mm dia C.P. brass chain with rubber plug, 32 mm dia C.P. brass standard pattern with check nut with 32 mm dia C.P. brass "P" or "S" trap and unions complete with P.V.C. connection. 5"size including supply of all materials, labour and T&P etc. required for proper completion of the work and including cutting and making good the walls and floor with cement coarse sand and grit fittings used should be superior quality. CSI No. 27.07 Providing and fixing 610 mmx 450 mm x 250 mm white glazed fire clay Sink Hindware. Perry, Purushottam or equivalent make first quality ISI marked with R.S. or C.I. brackets, C.P. brass chain with rubber plug 32 mm C.P. brass waste complete with checknut, 32 mm. C.P. brass trap with necessary unions including supply of all materials, labour and T&P etc. required for proper completion of the work and including cutting and making good the walls where required with cement, sand and grit, fittings used should be of superior quality. CSI No. 27.10 Providing and fixing 450 mmx 600 mm beveled edge mirror of Atul/Kiran make glass with Indian polish 6.50 mm thick complete with back of 600 mm x450 mm x6 mm hard board sheet fixed to wooden cleats with C.P. brass screws and washers including supply of all materials, labour and T&P required for proper completion of the work. CSI No. 27.23(a) Providing and fixing of Syntex or equivalent make water stroage tank including all materials, labours, T&P etc. required for proper completion of the work. CSI No. 26.50 Providing and fixing Nahani Trap India make of heavy approved quality complete with C.P. brass grating, Nahani Trap laid over base cement concrete 1:6:12 including cost of cement supply of all materials, labour and T&P etc. required for proper completion of the work. CSI No. 27.70

Each

2.00

1470.00 (Rs. One thousand four hundred seventy only)

63

Each

2.00

2265.00 (Rs. Two thousand two hundred sixty five only)

64

Each

2.00

550.00 (Rs. Five hundred fifty only)

65

Litre

1000.00

7.50 (Rs. Seven & paisa fifty only)

66

Each

2.00

257.00 (Rs. Two hundred fifty seven only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 10

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
67 Providing and fixing 600 mmx 20 mm size C.P. brass towel rail of approved quality (weight 250 gms including brackets) with pair of C.P. brass brackets. (to fit the size of towel rail). Fixed on the wall with C.P. brass screws including supply of all materials, labour and T&P etc. required for proper completion of the work and cutting and making good the wall plaster etc. required for work. CSI No. 27.26. Providing and fixing 15 mm. dia B-class Jindal, JTC, ISI marked G.I. pipe complete with special such as bend, tee, socket, cross, clamp etc. earth work including filling the trenches etc. required for proper completion of the work, the rate also includes concealed GI fitting where required, cutting and making good the walls etc. and all materials, labour and T&P complete. CSI No. 26.01

Each

2.00

287.00 (Rs. Two hundred eighty seven only)

68

RM.

20.00

128.00 (Rs. One hundred twenty eight only)

69(a) Same as item no. (68) but 20 mm dia. RM. (b) Same as item no. (68) but 25 mm dia. RM. (c) Same as item no. (68) but 32 mm dia. RM. 70 Supply and fixing C.P. Brass Bib cock heavy quality 15 mm dia (400 Gms) ISI mark including supply of all materials, labour, T&P etc. required for proper completion of work. CSI No. 26.53 Supply and fixing of C.P. brass shower heavy quality 100 mm dia (weight not less than 225 gms) capted including C.P. brass stop cock heavy quality 15 mm dia ISI mark including supply of all materials, labour, T&P etc. required for proper completion of work. CSI No. 26.56 Providing and fixing full way G.M. gate valve 15 mm dia with wheel, ISI mark heavy quality including supply of all materials, labour and T&P required for proper completion of work. CSI No. 26.22 100.00 100.00 50.00

157.00 (Rs. One hundred fifty seven only) 224.00 (Rs. Two hundred twenty four only) 263.00 (Rs. Two hundred sixty three only) 374.00 (Rs. Three hundred seventy four only) 583.00 (Rs. Five hundred eighty three only)

Each

5.00

71

Each

2.00

72

No.

2.00

286.00 (Rs. Two hundred eighty six only) 424.00 (Rs. Four hundred twenty four only)

73(a) Same as above in item no. (72) but 20 mm dia. No. 2.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 11

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
(b) Same as above in item no. (72) but 25 mm dia. No. (c) Same as above in item no. (72) but 32 mm dia. No. 74 Providing and fixing steel glazed window and ventilators of standard rolled Mann or Mahavir steel sections coforming to IS 7452-1974 as per drawing joints metered and welded with 100x14x3.15 mm holdfast embedded in cement concrete block 15x10x10 cm. size of 1:3:6 proportion i.e. 1 part of cement 3 part of approved coarse sand and 6 part of graded stone aggregated 20 mm nominal size including S/F of glass panes of plain pin headed 4mm thick nuts glazing clips and special putty of approved make complete and including a cost of red oxide paint. The fabrication should confirm to I.S. 10381975. (Alumunium beading with rubber packing included) CSI No. 9.24 Providing and injecting chemical emulsion for pre-constructional anti-termite treatment and creating a chemical barrier under and alround the column pits, wall trenches, basement excavation top external perimeter of binding expansion joints, surrounding of pipes and conduit etc. complete (Plinth area of the building at ground floor only shall be measured as per I.S. 6313 (Part II 1981). Aldrine emulsifiable concentrate or any other approved material such as Heptrachlor or chlordance will be used. The rate of application of chemical emulsion shall be as follws: (1)- Treatment for Masonary & foundation 5 litres/Sq.M. (2)- Back fill in immediate contact with foundation 7.5 litres/Sq.M. (3)-Treatment of top surface of plinth filling 5 litres/Sq.M. (4)- Treatment junction of wall and the floor 7.5 litres/Sq.M. (5)-Treatment of soil along External perimeter of building 7.50 litres/Sq.M. (6)-Treatment of soil under Apron along external perimeter 5 litres/ Sq.M.CSI No.17.01 joints sand First class brick on edge floor laid dry, filled, including preparation of base to proper slope and its ramming including supply of all material labour & T&P etc. required for proper completion of the work. CSI No. 12.08 2.00 2.00 567.00 (Rs. Five hundred sixty seven only) 655.00 (Rs. Six hundred fifty five only)

M2

34.00

3596.00 (Rs. Three thousand five hundred ninty six only)

75

M2

250.00

95.00 (Rs. Ninty five only)

76

500.00

206.00 (Rs. Two hundred six only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 12

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
77(a) Brick soling with straight over burnt bricks on edge and dry with brick edging on both sides including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth of P.I. 5 to 7 spreading blinding coat of 1 cm. depth of local earth over the entire surface and including supply of all materials, labour and T&P, etc. required for proper completion of the work. C.S.I. No. 18.08 77(b) Laying C.C. Road slab consisting of 1 cement 2 approved coarse sand 4 approved stone ballast 2 cm gauge over prepared subgrade after its rectification and bringing it to proper camber and including supply of all materials, labour and T&P etc. required for proper completion of the work, finished to required template as per directions of the Engineer Incharge but excluding cost of metals required for the rectification of the subgrade. CSI No. 18.13 78 Filling of 20 mm wide 80/100/115 mm deep joint with coarse sand and saw dust mixed with hot bitumen etc. complete CSI No. 18.20 Supply and mixing approved water proofing compound in cement mortar in plaster or concrete work in the proportion as recommended by the manufacturer. CSI No. 11.18 Supply and fixing 50x50mm, 8 gauge G.I. chain link fencing 2.4 M high including fixing to vertical posts, horizontal runners with 10 mm dia 40mm long bolts, nuts and washers complete with all material, labour and T&P etc. required for proper completion of work chain link of 8 gauge shall be galvanised by hot dipped method as as per relevant IS code (excluding cost of vertical posts and horizontal runners) CSI No. 9.34) Fixing and grouting the bolt below 25 mm dia M.S. Anchor bolts in proper alighment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. CSI No. 9.21 Fixing and grouting the bolt 32/28 mm dia M.S. Anchor bolts 900 mm long in proper alighment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. CSI No. 9.19

2000.00

189.00 (Rs. One hundred eighty nine only)

M3

200.00

4511.00 (Rs. Four thousand five hundred eleven only)

RM.

200.00

29.10 (Rs. Twenty nine & paisa ten only) 42.20 (Rs. Forty two & paisa twenty only)

79

Kg.

10.00

80

150.00

437.00 (Rs. Four Hundred Thirty Seven only)

81

No.

600.00

32.00 (Rs. Thirty two only)

82

No.

700.00

41.80 (Rs. Forty one & paisa eighty only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 13

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
83 Grouting of M.S. rail of 90 lbs including cost of all metarials, labour and T&P for fixing of rail in proper alighment, level and position in transformer plinth foundation etc. as per direction of Engineer in charge Rails to be supplied by the department free of cost. CSI No. 9.41. Fixing of pale fencing alongwith horizontal runner and pales with 6 mm dia. 30 mm long galvanized iron bolts and nuts with washer in true alignment and level between the vertical post already grouted as per direction of I/C CSI no. 9.26 Boring holes 3.5 M deep below cutoff level in all types of strata including loose sandy strata under water requiring use of modified auger and cutting tools with gravity valves and removable casing pipe, if required for proper completion of work with cost of all labour materials. T&P etc. as may be required for proper completion of work. CSI No. 21.01 300 mm dia piles CSI No. 21.03 each (b) 400 mm dia piles CSI No 21.04 Each 86 Cutting the bore hole for providing under ream of 2.5 times the dia. Of pile upto 3.50 metre below the cut off level tools including cleaning the bore hole and including cost of all materials, labour and T&P etc. as may be required for proper completion of the work. CSI No 21.06 For 300 mm dia Piles CSI No. 21.08 Each (b) For 400 mm dia Piles CSI No. 21.09 Each 87 Extra for every additional depth of boring work as described in item No. 85 above but beyond 3.50 Metre below the cut off level CSI No. 21.11 For 300 mm dia Piles CSI No. 21.13 RM. 108.00 226.00 (Rs. Two hundred twenty six only) 24.00 48.00 233.00 (Rs. Two hundred thirty three only) 289.00 (Rs. Two hundred eighty nine only) 88.00 72.00

RM.

16.00

245.00 (Rs. Two hundred forty five only)

84

RM.

30.00

80.00 (Rs. Eighty only)

85

(a)

406.00 (Rs. Four hundred six only) 517.00 (Rs. Five hundred seventeen only)

(a)

(a)

J.E.

S.D.O.

COMPUTER

E.E.

Page 14

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
(b) For 400 mm dia Piles CSI No. 21.14 RM. 88 As in item No. 86 above but for under reaming beyond 3.50 metre below the cut of level. CSI No. 21.16 300 mm dia piles CSI No. 21.18 Each (b) 400 mm dia piles CSI No 21.19 Each 89 Providing and filling bentonite solution in pile bore under unstable and/or high water table soil condition for retaining shape of bore 5 kg of bentonite will be used in 100 Lt. clear water (Bentonite) solution shall be used with continuous process of circulation) including all material, labour, T&P etc. The measurement shall be done as per design dia & depth of pile upto cut off level. CSI No. 21.21. Extra for concreting in bore holes filled with water or bentonite solution (Bore under loose unstable/under water) by displacement method, using tremie pipe and including cost of 10% extra cement required over normal 1:2:4 mix including cost of all labour & T&P etc. as may be required for proper completion of the work. CSI. No. 21.25 Cutting & chipping the piles top above the cut off level including bending & straightening the pile reinforcement as directed including cost of all materials labour and T&P etc. as may be required for completion of the work. CSI No. 21.27 For 300 mm dia Pile CSI No. 21.29 Each (b) For 400 mm dia Pile CSI No. 21.30 Each 92 Conducting load test on working piles or test piles up to 12 mm settlment as per I.S.S. CSI No. 21.32 88.00 72.00 100.00 96.00 200.00 305.00 (Rs. Three hundred five only)

(a)

269.00 (Rs. Two Hundred Sixty Nine only) 477.00 (Rs. Four hundred seventy seven only)

110.00

472.00 (Rs. Four hundred seventy two only)

90

110.00

216.00 (Rs. Two hundred sixteen only)

91

(a)

129.00 (Rs. One hundred twnety nine only) 169.00 (Rs. one hundred sixty nine only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 15

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
(a) For 300 mm dia pile CSI No. 21.33 Each 1.00 7982.00 (Rs. Seven thousand nine hundred eighty two only) 9578.00 (Rs. Nine thousand five hundred seventy eight only)

(b)

For 400 mm dia pile CSI No. 21.34 Each 1.00

93

(a)

Conducting load test on working piles or test piles up to 12 mm settlment as per I.S.S. CSI No. 21.35 For 300 mm dia pile CSI No. 21.36 Each 1.00

(b)

For 400 mm dia pile CSI No. 21.37 Each 1.00

5747.00 (Rs. Five thousand seven hundred forty seven only) 6397.00 (Rs. Six thousand three hundred ninety seven only)

94

(a)

Conducting load test by lateral thrust on working piles upto 12 mm lateral deflection as per I.S.S. CSI No. 21.38 For 300 mm dia pile CSI No. 21.39 Each 1.00

3831.00 (Rs. Three thousand eight hundred thirty one only) 4257.00 (Rs. Four thousand two hundred fifty seven only) 69.00 (Rs. Sixty nine only)

(b)

For 400 mm dia pile CSI No. 21.39 Each 1.00

95

6 mm thick plaster with 1:3 cement and coarse sand including labour, materials and T&P etc. required for proper completion of the work. CSI No. 11.20 3 mm thick floating coat of neat cement finish including supply of all materials, labour and T&P etc. required for proper completion of the work (including cost of cement), cement consumption 0.044 bag/sq.m. CSI No. 20.23

150.00

96

150.00

17.00 (Rs. Seventeen only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 16

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
97 Making of four bore hole upto 12 m depth by any method required as per site condition in accordance with IS-1892-1979 and 1498-1970, conducting standard penetration test in accordance with IS-2131-1981 at every 1.5 m depth in each bore and collection of disturbed and undisturbed soil sample at a depth of approx. 1.5 m depth as per site requirement in accordance with IS-1892-1978 including laboratory investigation in accordance with IS2720 (Part-1) 1983 such as sieve analysis test, Atterberg's Limit test, Particle size analysis, natural moisture content, wet & dry density test specific gravity, triaxial compression, consolidation test and other disturbed soil sample tests complete as per direction of Engineer-in-charge also including submission of four copies of test report with detailed descriptions. Supply and laying of 80 mm thick Cement Concrete interlocking tiles grey coloured 'I' shaped including supply of all material, labour and T&P etc. required for proper completion of work. C.S.I. No. 12.27 Wiring point for light with 1.5 Sq. mm FR PVC insulated multistrand copper conductor cable as earth wire drown inside in heavy guage rigid PVC conduit pipe partly concealed in the wall and partly laid in slab alongwith the reinforcement before concreting, complete with 1.5 Sq.mm. copper earth continuity wire and piano type switch & ceiling rose/angle/batten holder on 3 mm thick phenolic laminated backelite sheet etc. complete in all respects, as directed, including matching colour wash. P.W.D. Electrical Schedule 2007 no. 138(C). Same as above in item no. 99 but for fans/fresh air fan/exhaust fan. P.W.D. Electrical Schedule 2007 no. 140(C). Same as above in item no. 99 but for plug point. P.W.D. Electrical Schedule 2007 no. 141(C). Same as above in item no. 99 but call bell. P.W.D. Electrical Schedule 2007 no. 142(C).

Job

1.00

40000.00 (Rs. Forty thousand only)

98

M2

100.00

468.30 (Rs. Four hundred sixty eight & paisa thirty only)

99

No.

25.00

366.00 (Rs. Three hundred sixty six only)

100

No.

10.00

101

No.

12.00

102

No.

2.00

442.00 (Rs. Four hundred forty two only) 200.00 (Rs. Two hundred only) 348.00 (Rs. Three hundred forty eight only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 17

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
103 Supply and fixing and concealing of 20 mm dia, 2mm thick PVC conduit pipe with I.S.I. mark embossed and with PVC accessories confirming to IS No. 3419 for drawing wires, duly sealed at joints with original resin/adhesive to make the complete piping rigid, plastering with cement sand mortar finished to the level with matching colour wash including cost of all material labour and T&P etc. required for proper completion of the work as per directions and to the satisfaction of Engineer I/C PWD Electrical Schedule 2007 no. 148(A). Same as above in item no. 103 but for 25mm dia, 2 mm thick PWD Electrical schedule 2007 no. 148(A). Supply and fixing of 2/3/4 ways round steel junction box confirming to ISS for 20 mm dia 16 gauge conduit concealed in the wall, keeping its level of plaster duly provided with proper size cover screwed as directed at site by the Engineer I/C with the supply of all material, labour and T&P required for proper completion of work. P.W.D. electrical Schedule 2007 no. 154(A). Supply and fixing of 2/3/4 ways round steel junction box confirming to ISS for 25 mm dia 16 gauge (1.5 mm) thick rigid steel conduit concealed in the wall, keeping its level of plaster duly provided with proper size cover screwed as directed at site by the Engineer I/C with the supply of all material, labour and T&P required for proper completion of work. P.W.D. Electrical Schedule 2007 no. 155(A). Supply and fixing of switch box made up of 16 SWG (1.5 mm) thick M.S. sheet of 100x100x65 mm size duly painted with red oxide primer and flushed in wall including cutting of brick work, fixing it to the level with cement sand mortar including matching colour wash with supply of all materials labour and T&P required for proper completion of work as directed at site by the E/I. P.W.D. Electrical Schedule 2007 no.159. Same as item No. 107, but for 150x150x65 mm size. P.W.D. Electrical Schedule 2007 no. 160.

RM.

80.00

38.00 (Rs. Thirty eight only)

104

RM.

80.00

44.00 (Rs. Forty four only)

105

No.

25.00

10.00 (Rs. Ten only)

106

No.

25.00

11.00 (Rs. Eleven only)

107

No.

10.00

31.50 (Rs. Thirty one & paisa fifty only)

108

No.

5.00

53.50 (Rs. Fifty three & paisa fifty only) 71.00 (Rs. Seventy one only)

109

Same as item No. 108 but for 200x250x65 mm size P.W.D. Electrical Schedule 2007 no. 162.

No.

5.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 18

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
110 Supply & wiring of submains with 2 nos. 2.5 sq. mm. & with 1 no. earth wire of 1.5 sq. mm. FR PVC insulated 1100 V grade single core multistrand copper conductor cable in existing PVC conduit complete, including supply of all material, labour and T&P etc. required for proper completion of the work as directed by Engineer I/C. P.W.D. Electrical Schedule 2007 no. 291. Supply & wiring of submains with 2 nos. 4 sq. mm. & with 1 no. earth wire of 2.5 sq. mm. FR PVC insulated 1100 V grade single core multistrand copper conductor cable in existing PVC conduit complete, including supply of all material, labour and T&P etc. required for proper completion of the work as directed by Engineer I/C P.W.D. Electrical Schedule 2007 no. 291(A) Same as item No. 111, but for 2 nos. 6 sq. mm 1 No. 4 Sq. mm FR PVC insulated condutor cable. P.W.D. Electrical Schedule no. 291(D) S/F of 32 Amp. 240 V DP metal clad rewireable type switch fuse unit on M.D.F.E.G./Teak wood board complete in all respects. Cat. B P.W.D. Electrical Schedule 2007 no. 305. Supply and buying of 600mmx600mmx6.0 mm G.I. plate vertically for earthing with its top at least 3 metres below ground level complete with 20mm dia G.I. pipe and funnel for watering and one earthing lead of two no. 8 to 10 SWG GI wire in 15mm dia G.I. pipe up to switch board (from appron to switch board the cost of G.I. pipe and G.I. wire will be extra) 30 cm square C.I. frame with hinged cover masonry housing alternate layers of charcoal/coke and salt at least 150 mm thick alround etc. as per directors of Engineer incharge complete in all respects P.W.D. Electrical Schedule 2007 no. 703. S/fixing of one number 8 SWG G.I. wire in 15mm dia G.I. pipe for earthing, laid in ground or in wall duly concealed including the cost of cement, sand, labour, T&P other material required for proper completion of the work as directed at site. P.W.D. Electrical Schedule 2007 no. 721. S/F of 0.5 A to 5 Amp. SP, MCB (10KA) P.W.D. Electrical Schedule 2007 no. 1001

RM.

100.00

38.00 (Rs. Thirty eight only)

111

RM.

80.00

57.00 (Rs. Fifty seven only)

112

RM.

80.00

84.00 (Rs. Eighty Four only) 927.00 (Rs. Nine hundred twenty seven only)

113

No.

2.00

114

No.

1.00

3119.00 (Rs. Three thousand one hundred ninteen only)

115

RM.

20.00

105.00 (Rs. One hundred five only) 150.00 (Rs. One hundred fifty only)

116

No.

10.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 19

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
117 S/F of 6/10/16/20/25/32 Amp. MCB (10KA) P.W.D. Electrical Scheudle 2007 no. 1002 120.00 (Rs. One hundred twenty only) 387.00 (Rs. Three hundred eighty seven only) 196.00 (Rs.One hundred ninety six only)

No.

10.00

118

119

S/F surface/flush mounting 4 ways SPN distribution board without MCB complete in all respect and as directed at site P.W.D. Electrical Schedule 2007 no. 1022. S/F of 40 Amp. SP MCB (10KA) P.W.D. Electrical Schedule 2007 no. 1003(a)

No.

2.00

No.

2.00

120

Supply and fixing of power plug with 15A/240 V flush type switch and 5 pin 15A/250V flush type universal socket in suitable M.S. box of 175mmx100mmx 50mm size with phenolic laminated bakelite sheet cover 3mm thick fixed with brass machine screw and cup washer. P.W.D. Electrical Schedule 2007 no. 1139. Supply and fixing of 16 guage M.S. drum duly painted including making hole in the wall for exhaust fan and finishing, properly complete in all respects. P.W.D. Electrical Schedule 2007 no. 1122. Supply and fixing of factory wired, HPF box type, fluorescent tube light fitting suitable for 1x40 watt fluorescent tube complete including tubes etc. on surface complete in all respects. Cat AA P.W.D. Electrical Schedule 2007 no. 453 Supply and fixing of factory wired, HPF box type, fluorescent tube light fitting suitable for 2x40 watt fluorescent tube complete including tubes etc. on surface complete in all respects. Cat. AA P.W.D. Electrical Schedule 2007 no. 454 Supply and fixing of fan regulator, dimmer, 300/400 watt, ISI marked, on the existing switch board including making connections, required material, labour T/P etc. for proper completion of work to the satisfaction of Engineer I/C of work. P.W.D. Electrical Schedule 2007 no. 1203. Supply & laying of 20 mm dia heavy duty 2 mm thick PVC conduit complete with bends and other accessories as required and 14 SWG fish steel wire etc. in slab alongwith reinforcement, before concreting and plastering etc. complete in all respects. P.W.D. Electrical Schedule 2007 no. 281(A).

No.

10.00

209.00 (Rs. Two hundred nine only)

121

No

2.00

460.00 (Rs. Four hundred sixty only)

122

No.

10.00

690.00 (Rs. Six hundred ninety only)

123

No.

10.00

1030.00 (Rs. One thousand thirty only)

124

No.

8.00

239.00 (Rs. Two hundred thirty nine only)

125

RM.

30.00

26.00 (Rs. Twenty six only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 20

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
126 Supply and laying of 25 mm dia heavy duty (2 mm thick) PVC conduit complete with bends and other accessories as required and 14 SWG fish steel wire etc. in slab alongwith reinforcement before concreting and plastering etc. complete in all respects. P.W.D. Electrical Schedule 2007 no. 282(A). S/F of factory fabricated M.S. box in existing sunk of size 480 mmx480mm x 200mm deep with Godrej type almirah, cover with handle etc. fabricated from 18 SWG (1.25) mm) M.S. sheet duly painted with red oxide primer followed by two coats of synthetic enamel paint complete with necessary conduit entry and D.P./T.P.N. fixing arrangements and provisions for compartment for loose wires openable housing on the top and hold fast etc. including supply of all material, labour, T&P etc. required for proper completion of the work. P.W.D. Electrical Schedule 2007 no. 1148. Add for fixing of tube fitting as pendent with two number 19mm dia, 16 gauge rigid steel conduit double check nuts: spring loaded flanges or M.S. hook fabricated from 25mmx3mm flat iron duly grouted in the ceiling upto 4 height of ceiling, including painting with synthetic enamel paint. Alongwith suply of all materials, labour & T&P etc. required for proper completion of work. P.W.D. Electrical Schedule 2007 no. 1143+ (item no. 1144). Applying Birla or equivalent putty on new interior or exterior surface over one coat of water based cement primer of ICI or equivalent brand for smoothening and leveling of the surface as per requirement and direction of Engineer I/C including cost of all material, labour T&P etc. required for proper completion of work. C.S.I. No. 13.21 Levelling and dressing and making proper slopes including cutting and filling of earth upto a depth 100 mm if so required including all labour T&P etc. required for proper completion of work. C.S.I. No. 4.12 Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm x 10 mm including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position. C.S.I. No. 13.20

RM.

30.00

35.00 (Rs. Thirty five only)

127

No.

1.00

1013.00 (Rs. One thousand thirteen only)

128

No.

10.00

173.00 (Rs. One hundred seventy three only)

129

M2

360.00

43.00 (Rs. Forty three only)

130

M2

8000.00

2.60 (Rs. Two & Paisa sixty only)

131

Each

1100.00

6.25 (Rs. Six & paisa twenty five only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 21

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
132 Supply & installation of India mark II hand pump including 150 mm dia boring 45 m deep upto IInd strata including lowering & extraction of pipes, arrangement of water if required for boring in all type of strata including supply & lowering in the same bore 110mm dia to 63 mm PVC pipe (10kg/cm2) with strainer reducer jointing 90 mm dia long cylinder 32mm dia GI pipe of 3 m length including supply & filling around the strainer of approved quality coarse sand 2.50 F.M. as required at the sites of the work including developing the bore so that clear whater & sand free water is recived from continous 60 minutes including cost of all materials, cartage, labour, and T&P etc. for installation of hand pump complete as per drawing & design & instruction of E/I & making platform & drain around the India mark second hand pump at site as per drawing. NSI [Approved by DGM (C) LKO] Clearing jungle including uprooting of rank vegetations, grass, bush, wood, trees and saplings of girth upto 30cm measured at a height of 1.0 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of UPPCL area cleared. C.S.I. No.4.09 Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. C.S.I. No. 9.45 Fixing of template in position level and alighment for grouting of Anchor bolt in main gantry (Labour rate only). C.S.I. No. 9.46 Same as above item no. 139 but for auxiliary structure. C.S.I. No. 9.47 Drilling 200 mm dia bore from G.L. to 180 M B.G.L. work to be completed in seven days of 3 shifts of 8 hours each as per direction of Engineer I/C. From 90 M BGL C.S.I. No. 19.11(a) RM. (b) From 90 M BGL to 120 M BGL C.S.I. No. 19.11(b) 90.00

No.

2.00

25000.00 (Rs. Twenty five thousand only)

133

M2

4000.00

2.80 (Rs. Two & paisa eighty only)

134

RM.

1200.00

7.30 (Rs. Seven & Paisa thirty only) 36.50 (Rs. Thirty six & paisa fifty only) 14.60 (Rs.Fourteen & paisa sixty only)

135

No.

40.00

136

No.

100.00

137

(a)

RM.

30.00

740.00 (Rs. Seven hundred forty only) 853.00 (Rs. Eight hundred fifty three only)

J.E.

S.D.O.

COMPUTER

E.E.

Page 22

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
138 Lowering of tube well assembly alongwith surrounding with pea gravels, testing, verticality of Tube well and washing of the tube well from G.L. to 120 Meter B.G.L. the cost including all labour, materials, T&P required for proper completion of work but excluding the cost of slotted pipe/plain M.S. pipe assembly. From GL to 90 M BGL C.S.I. No. 19.13(a) RM. (b) From 90 M BGL to 120 M BGL C.S.I. No. 19.13(b) Supply and lowering of 160 mm outer dia PVC pipe of "uniplas" or equivalent make as approved by Engineer - in - charge of class 3 (6Kg./ Cm.) confirming IS 498 S/ 1988 required for proper completion of the work. C.S.I. No. 19.130 Supply and lowering of PVC strainer pipe of 160 mm outer dia meter of "uniplas" or equivalent make as approved by Engineer-in- charge of class 3(6 Kg./Cm) confirming to IS 498 S/1988 with 25 mm, dia holes covered with best quality PVC mesh as per direction of Engineer-in-charge including cost of all materials, labour and T&P etc. C.S.I. No. 19.131 S/F 150 mm dia PVC top or bottom plug/bail plug of "Uniplas" or equivalent make of heavy quality including all cost of all materials, labour and T&P etc. C.S.I. No. 19.132 S/F 40 mm dia G.I. ("B" class) column pipe of approved make with column coupling in random length of 3 Meters (2.50-2.90 MT) C.S.I. No 19.129 Supply and stacking of pee gravel (Lal Kuan) properly at levelled ground for measurement as directed by Engineer I/C, including all labour, T&P required for proper completion of work. C.S.I. No. 19.134 Transportation and installation of tube well drilling & development and other equipment at site of work & back. C.S.I. No. 19.142 90.00

(a)

154.00 Rs. One hundred fifty four only) 173.00


(Rs. One hundred seventy three only)

RM.

30.00

139

RM.

80.00

550.00 (Rs. Five hundred fifty only)

140

RM.

40.00

600.00 (Rs. Six hundred only)

141

Each

2.00

150.00 (Rs. One hundred fifty only) 300.00 (Rs. Three hundred only) 2125.00 (Rs. Two thousand one hundred twenty five only) 14438.00 (Rs. Fourteen thousand four hundred thirty eight only) 33450.00 (Rs.Thirty three thousand four hundred fifty only)

142

RM.

30.00

143

M3

6.00

144

Job

1.00

145

Supply & Installation of submersible pump of 3HP outlet 32 mm dia. or more, Head 60/24m, Discharge in LPH 6000/14,000 of K.S.B. or eqt. make including cost of labour, T&P and material complete with one year of warranty of site. C.S.I. No. 19.148

Each

1.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 23

BILL OF QUANTITY FOR CONSTRUCTION OF CONTROL ROOM, SECURITY WALL, BOUNDARY WALL & C.C. ROAD CULVERT AT 132 KV. SUB-STATION, BILSI (BADAUN)
146 Supply & installation of electrical control panel of L&T or Havells or equivalent make for single phase submersible pumpset containing contractor relay condenser up to 3.0 HP pum set. C.S.I. No. 19.144 Supply & fixing of submersible cable size 2.5 mm2 for upto 3 H.P. pump set of 'Havells' or equivalent make. C.S.I. No. 19.151 Supply & fixing of steel wire rope for submersible pump. C.S.I. No. 19.153 Development of tubewell by O.P. Unit, including cost of all labour, materials, T&P etc. required for proper completion of work and as per direction of Engineer I/C. C.S.I. No. 19.15 First class brick work in foundation & plinth with old dismantled bricks (supplied by department free of cost) and coarse sand of FM 1.8 to 2.5 mortar in 1:6 including supply of all labour, materials, T&P etc. complete. Concrete work with 40 mm gauge brick ballast obtained from breaking brick bats (brick bats supplied by the department free of cost) in proportion of 12:6:1 in foundation and under floors. C.S.I. No. 5.22 Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metres. C.S.I. No. 15.01 Same as in item No. (152) above but in mud mortar. C.S.I. No. 15.02 Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the EngineerIncharge within a distance of 60 metres. C.S.I. No. 15.03 Supply and fixing welded wire mesh size 75x25 mm and rectangular made out of 10 SWG over M.S. angle frame with M.S. flat with nut and bolt welded as required including cost of drilling holes, bolts, nuts, washer wilding etc as required including cost of all labour, materials, T&P required for proper completion of the work except cost of angle iron and flat. C.S.I. No. 9.33 5675.00 (Rs. Five thousand six hundred seventy five only) 89.00 (Rs. Eighty nine only) 37.00 (Rs. Thirty seven only) 470.00 (Rs. Four hundred seventy only) 962.00 (Rs. Nine hundred sixty two only) 1515.00 (Rs. One thousand five hundred fifteen only) 171.00 (Rs. One hundred seventy one only) 85.50 (Rs. Eighty five & Paisa fifty only) 370.00 (Rs. Three hundred seventy only)

Each

1.00

147

RM.

50.00

148

RM.

35.00

149

Hour

72.00

150

M3

6.00

151

M3

3.00

152

M3

5.00

153

M3

5.00

154

2.00

155

150.00

371.00 (Rs. Three hundred seventy one only)

Rupees One Crore Eighty Lacs Eighty Three Thousand Eighty Two & Paisa Sixty only

J.E.

S.D.O.

COMPUTER

E.E.

Page 24

NTROL ROOM, LVERT AT 132 KV.

Amount

63360.00

42750.00

1552500.00

612000.00

515200.00

878000.00

818300.00

231700.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 25

NTROL ROOM, LVERT AT 132 KV.

484600.00

91672.00

2625.00

1657.00

614210.00

82660.00

166740.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 26

NTROL ROOM, LVERT AT 132 KV.

180530.00

27960.00

785550.00

1172700.00

229200.00

168000.00

1280.00

7000.00

1370.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 27

NTROL ROOM, LVERT AT 132 KV.

1440.00

5100.00

1500.00

1478350.00

1500525.00

1100000.00

11700.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 28

NTROL ROOM, LVERT AT 132 KV.

1102986.00

702084.00

940.00

2002.00

2550.00

2346.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 29

NTROL ROOM, LVERT AT 132 KV.

40200.00

200000.00

4860.00

1310.00

111200.00

36000.00

19875.00

12427.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 30

NTROL ROOM, LVERT AT 132 KV.

30924.00

4395.60

19500.00

4120.00

8400.00

19215.00

53800.00

14100.00

10800.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 31

NTROL ROOM, LVERT AT 132 KV.

20500.00

10500.00

1200.00

11880.00

4720.00

4600.00

6160.00

2488.00

2860.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 32

NTROL ROOM, LVERT AT 132 KV.

2940.00

4530.00

1100.00

7500.00

514.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 33

NTROL ROOM, LVERT AT 132 KV.

574.00

2560.00

7850.00

22400.00

26300.00

1870.00

1166.00

572.00

848.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 34

NTROL ROOM, LVERT AT 132 KV.

1134.00

1310.00

122264.00

23750.00

103000.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 35

NTROL ROOM, LVERT AT 132 KV.

378000.00

902200.00

5820.00

422.00

65550.00

19200.00

29260.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 36

NTROL ROOM, LVERT AT 132 KV.

3920.00

2400.00

29232.00

45496.00

11184.00

6936.00

24408.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 37

NTROL ROOM, LVERT AT 132 KV.

61000.00

25824.00

47700.00

51920.00

23760.00

9288.00

14872.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 38

NTROL ROOM, LVERT AT 132 KV.

7982.00

9578.00

5747.00

6397.00

3831.00

4257.00

10350.00

2550.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 39

NTROL ROOM, LVERT AT 132 KV.

40000.00

46830.00

9150.00

4420.00

2400.00

696.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 40

NTROL ROOM, LVERT AT 132 KV.

3040.00

3520.00

250.00

275.00

315.00

267.50

355.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 41

NTROL ROOM, LVERT AT 132 KV.

3800.00

4560.00

6720.00

1854.00

3119.00

2100.00

1500.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 42

NTROL ROOM, LVERT AT 132 KV.

1200.00

774.00

392.00

2090.00

920.00

6900.00

10300.00

1912.00

780.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 43

NTROL ROOM, LVERT AT 132 KV.

1050.00

1013.00

1730.00

15480.00

20800.00

6875.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 44

NTROL ROOM, LVERT AT 132 KV.

50000.00

11200.00

8760.00

1460.00

1460.00

66600.00

25590.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 45

NTROL ROOM, LVERT AT 132 KV.

13860.00

5190.00

44000.00

24000.00

300.00

9000.00

12750.00

14438.00

33450.00

J.E.

S.D.O.

COMPUTER

E.E.

Page 46

NTROL ROOM, LVERT AT 132 KV.

5675.00

4450.00

1295.00

33840.00

5772.00

4545.00

855.00

427.50

740.00

55650.00

18083082.60

o & Paisa Sixty only

J.E.

S.D.O.

COMPUTER

E.E.

25

S/F water proof craft paper in double layer with grease in between over 4cm thick C.C. 1:1.5:3 in cement, coarse sand & 12mm gauge stone grit. (C.C. 1:1.5:3 shall be paid separately ) CSI No. 10.13

M2

50.00

40.80 (Rs. Forty & paisa eighty only)

2040.00

20

Supply and fixing 5.08 cm dia 25 cm. long G.I. Pipe in chhajja etc. CSI No. 10.14

No

6.00

90.90 (Rs. Ninty & paisa ninty only