EDIFICIO DE OFICINAS

PRESUPUESTO OBRA:

Lista de tems

Escribir solamente en columnas verdes

tems

Un

Cantidad

C.Unitario

Sub Total

Cartel de obra

m2

0.00

0.00

Cerco de obra

ml

0.00

0.00

Picado de revoques

m2

0.00

0.00

Rebajo de cordn

ml

0.00

0.00

Demolicin solado 20cm

m2

0.00

0.00

Demolicion mamposteria

m3

0.00

0.00

Demolicion hormigon ado

m3

0.00

0.00

Desmonte a maquina

m3

0.00

0.00

Excavacion maquina

m3

0.00

0.00

Entoscado

m3

0.00

0.00

Suelo cemento 6%

m3

0.00

0.00

Relleno de arena

m3

0.00

0.00

Retiro de tierra

m3

0.00

0.00

Excavacion zanjas a mano

m3

0.00

0.00

Excavacion bases a mano

m3

0.00

0.00

Hormigon comn (6,00hh)

m3

0.00

0.00

Armadura colocada (0,20hh)

kg

0.00

0.00

Encofrado (2,60hh)

m2

0.00

0.00

Ho.Ado. (s/cant. de Horm,Arm y Enc)

m3

0.00

0.00

Ho.Ado.pavimento 15cm

m2

0.00

0.00

Ho.Ado.base (50-3)

m3

0.00

0.00

Ho.Ado.zapata (30-6)

m3

0.00

0.00

Ho.Ado.zapata (60-6)

m3

0.00

0.00

Ho.Ado.columna (105-11)

m3

0.00

0.00

Ho.Ado.viga fund (75-7)

m3

0.00

0.00

Ho.Ado.viga (120-16)

m3

0.00

0.00

Ho.Ado.losa 10cm (80-10)

m3

0.00

0.00

Ho.Ado.losa 15cm (75-6,66)

m3

0.00

0.00

Ho.Ado.losa premoldeada

m2

0.00

0.00

Ho.Ado.tab.10cm (110-20)

m3

0.00

0.00

Ho.Ado.tab.15cm (110-13,33)

m3

0.00

0.00

Ho.Ado.tanque (90-13,33)

m3

0.00

0.00

Mamp. ladrillo comn cimientos

m3

0.00

0.00

Mamp. ladrillo comn submuracin

m3

0.00

0.00

Mamp. ladrillo comn 15cm

m3

0.00

0.00

Mamp. ladrillo comn 30cm

m3

0.00

0.00

Mamp. ladrillo vista 15cm

m3

0.00

0.00

Mamp. ladrillo vista 30cm

m3

0.00

0.00

Mamp. ladrillo media mquina 15cm

m3

0.00

0.00

Mamp. ladrillo media mquina 30cm

m3

0.00

0.00

Tabique ladrillo comn 8cm

m2

0.00

0.00

Tabique ladrillo hueco 8x15x20 (10)

m2

0.00

0.00

Tabique ladrillo hueco 12cm

(15)

m2

0.00

0.00

Tabique ladrillo hueco 18cm

(21)

m2

0.00

0.00

Tabique bloque 12x18x40cm

(15)

m2

0.00

0.00

Tabique bloque 18x18x40cm

(21)

m2

0.00

0.00

Cemento: azotado

ml

0.00

0.00

Cemento: capa aisladora s/muros

m2

0.00

0.00

Cemento: piso rodillado

m2

0.00

0.00

Cemento: piso con ferrocemento

m2

0.00

0.00

Cemento: toma de juntas

m2

0.00

0.00

Cemento: revoque

m2

0.00

0.00

Cemento: revoque tanque

m2

0.00

0.00

(08)

Cemento: zcalo 10cm

m2

0.00

0.00

Pintura cal

m2

0.00

0.00

Pintura latex exterior

m2

0.00

0.00

Pintura latex interior

m2

0.00

0.00

Pintura latex cielos

m2

0.00

0.00

Pintura especial 1

m2

0.00

0.00

Pintura especial 2

m2

0.00

0.00

Enduido s/paredes

m2

0.00

0.00

Pintura satinol muros

m2

0.00

0.00

Pintura s/carp.madera

m2

0.00

0.00

Pintura s/carp.metalica

m2

0.00

0.00

Hormigon elaborado colado (4,00hh)

m3

0.00

0.00

Armadura colocada (0,10hh)

kg

0.00

0.00

Encofrado (2,60hh)

m2

0.00

0.00

Ho.Ado. (s/cant. de Horm,Arm y Enc)

m3

0.00

0.00

H.Elab.pavimento 15cm

m2

0.00

0.00

H.Elab.base (50-3)

m3

0.00

0.00

H.Elab.zapata (30-6)

m3

0.00

0.00

H.Elab.zapata (60-6)

m3

0.00

0.00

H.Elab.columna (105-11)

m3

0.00

0.00

H.Elab.viga fund (75-7)

m3

0.00

0.00

H.Elab.viga (120-16)

m3

0.00

0.00

H.Elab.losa 10cm.(80-10)

m3

0.00

0.00

H.Elab.losa 15cm.(75-6,66)

m3

0.00

0.00

H.Elab.losa premoldeada

m2

0.00

0.00

H.Elab.tab.10cm.(110-20)

m3

0.00

0.00

H.Elab.tab.15cm.(110-13,33)

m3

0.00

0.00

H.Elab.tanque (90-13,33)

m3

0.00

0.00

TOTAL LISTA MATERIALES

TOTAL EQUIPOS
TOTAL LISTA MANO DE OBRA

0.00

Alumno

: Dennis Eleuterio Riquelme Montecinos

Rut

: 16.038.699-1

Tema

: TRABAJO FINAL "JEFE DE OBRA"

ITEM
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
2
2.1
2.2
2.3
2.5
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17
4.18
4.19
4.20

MATERIAL
MATERIALES
Arboles
Rodillo Chiporro 23cm
Brochas 2"
Alambre negro
Clavos
Alzaprimas
Terciado Estructural 18mm (losa)
Desmoldante
Pino 2x3" para encofrado
Terciado para encofrado
Transporte material escarpe
Retroescavadora
Obras Civiles
Estabilizado
Arena relleno escarpe
Compactadora
Otros
Fundaciones
Enfierradura d = 12
Enfierradura d = 8
Enfierradura d = C
Estribos d = 12
Estribos d = 8
Hormign fundaciones
Hormigon Sobrecimiento
Losa radier
Flete de Enfierradura
Bomba de Hormigon
Otros
Estructura vertical
Enfierradura Pilares d = 10 mm
Enfierradura Pilares d = 12 mm
Enfierradura Pilares d = 8 mm
Estribos pilares d = 8 mm
Enfierradura vigas d = 12 mm
Enfierradura vigas d = 16 mm
Enfierradura vigas d = 8 mm
Estribos vigas d = 8 mm
Enfierradura cadena d = 12 mm
Enfierradura cadena d = 16 mm
Enfierradura cadena d = 8 mm
Estribos cadena d = 8 mm
Malla Acma d = 5 mm (radier)
Enfierradura muro d = 12 mm
Hormigon Pilares 1er Piso
Hormigon Pilares 2do Piso
Hormigon Vigas 1er Piso
Hormigon Vigas 2do Piso
Hormigon Cadenas 1er Piso
Hormigon Cadenas 2do Piso

Fecha :

1/12/2012

Un

CANTIDAD

C.Unitario

Sub Total

Unid
Und
Und
Kg
Caja
Unid
Unid
Tineta
Unid
Unid
Camion
Dia

40.00
15.00
10.00
50.00
2.00
150.00
24.00
2.00
300.00
82.00
13.00
3.00

54,613
1,672
2,690
1,059
19,950
2,520
13,437
29,067
1,101
10,664
35,000
120,000

2,184,538
25,084
26,900
52,926
39,900
378,000
322,487
58,134
330,252
874,437
455,000
360,000

M3
M3
Dia

22.01
42.19
5.00
0.00

10,900
3,700
10,084
0

239,909
156,099
50,420
0

Kg
Kg
Kg
Kg
Kg
M3
M3
M3
Unid
Unid

289.13
128.61
0.00
110.09
196.59
22.35
5.34
5.51
1.00
1.00
0.00

560
560
0
560
560
48,651
47,090
43,073
20,000
273,388
0

161,913
72,022
0
61,650
110,090
1,087,350
251,461
237,332
20,000
273,388
0

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Unid
Kg
M3
M3
M3
M3
M3
M3

164.49
886.40
9.80
382.51
158.64
188.18
47.04
163.29
190.37
225.81
56.45
141.21
8.00
0.00
5.34
3.29
1.49
2.50
2.59
1.96

560
560
560
560
560
560
560
560
560
560
560
560
16,989
0
49,544
49,544
49,544
49,544
49,544
49,544

92,114
496,384
5,488
214,206
88,838
105,381
26,342
91,442
106,607
126,454
31,612
79,078
135,912
0
264,565
163,000
73,821
123,860
128,319
97,106

5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
8
8.1
8.2
8.3
8.4
8.5
9
9.1
9.2
9.3
9.4
9.5
9.6
10
10.1
10.2
10.3
10.4
10.5
10.6
10.7
10.8
10.9
10.9
11
11.1
11.2
11.3
11.4
12
12.1
12.2

Albaileria
Ladrillo Chonchon
Saco cemento (Mortero de pega)
Arena (Mortero de pega)
Saco cemento (Estuco Interior)
Arena (Estuco Interior)
Saco Cemento (Estuco Exterior)
Arena (Estuco Exterior)
Muros
Empastado muros interior
Pintura muros interior.
Pintura muros exterior.
Ceramico Baos
Adhesivo Ceramico
Frague
Otros
Losas
Estructura Losa 1 piso d = 10mm
Hormigon
Bomba de Hormigon
Hormigon escalera
Estructura escalera
Tubular 40mm
Tubular 50mm
Soldadura
Otros
Tabiquera
Panel Tipo
Estuco tabiques
Revestimiento cermica
Pegamento cermica
Otros
Cielos
Estructura cielos pino 2x2 cadeneteado
Planchas de volcanita 10 mm
Molduras perimetrales
Vigas a la vista
Revestimiento cielo
Otros
Cubierta
Cubierta
Fieltro aluminio papel una cara
Estructura cubierta (cerchas) P 1x5"
Estructura cubierta (cerchas) P 1x4"
Costaneras Pino
Aislante Lana Mineral
Bajadas de aguas lluvias
Canales y Forros de aguas lluvias
Cubetas de aguas lluvias
Otros
Terraza
Pilares
Vigas
Entramado
Cubierta
Pisos
Afinado radier
Piso Tipo A

Und
Und
M3
Unid
M3
Unid
M3

4,870.00
53.00
7.50
64.00
9.00
43.00
6.00

135
3,300
3,700
3,300
3,700
3,300
3,700

657,450
174,900
27,750
211,200
33,300
141,900
22,200

Tineta
Galon
Galon
Unid
Unid
Unid

18.00
16.00
14.00
15.00
6.00
4.00
0.00

8,857
9,655
9,235
2,761
1,420
832

159,429
154,487
129,294
41,408
8,520
3,328
0

Kg
M3
Und
M3
Kg
Unid
Unid
Kilo

761.00
8.26
1.00
1.30
61.98
4.00
2.00
3.00
0.00

560
48,651
273,388
48,651
560
7,555
8,815
2,429
0

426,160
401,857
273,388
63,246
34,709
30,218
17,630
7,286
0

M2
M2
M2
Unid

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0
0
0
0
0

Und
Unid
Unid
Unid
M2
GL

105.00
19.00
41.00
0.00
118.46
0.00

990
3,702
4,613
0
12,315

103,941
70,332
189,133
0
1,458,887
0

Und0
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
GL

48.00
2.00
70.00
28.00
70.00
15.00
10.00
40.00
2.00
0.00

7,218
27,471
2,681
1,079
990
9,875
2,374
9,403
9,403
0

346,487
54,941
187,647
30,212
69,294
148,122
23,739
376,134
18,806
0

Unid
Unid
Unid
M2

0.00
0.00
0.00
0.00

0
0
0
0

0
0
0
0

M2
Und

173.43
63.00

1,460
5,534

253,208
348,618

12.3
12.4
12.5
12.6
12.7
13
13.1
13.2
13.3
13.4
13.5
13.6
14
14.1
14.2
14.3
14.4
14.5
14.6
14.7
14.8
14.9
14.10
14.11
14.12
15
15.1
15.2
15.3
15.4
15.5
15.6
16
16.1
16.2
16.3
16.4
16.5
16.6
16.7
16.8
16.9
16.10
16.11
16.12
16.13
16.14
16.15
17
17.1
17.2
17.3
17.4
17.5
17.6
18

Piso Tipo B
Piso Baos
Adhesivo piso
Frague
Otros
Puertas y Ventanas
Puerta Tipo 1 (80 cm)
Puerta Tipo 2 (65 cm)
Marco Puerta
Bisagras
Chapas
Ventanas
Accesorios Elctricos
Centros de Luz (Tubo Fluorescente)
Centros de Luz (Embutidos)
Interruptor 9/12
Interruptor 9/15
Interruptor 9/24
Enchufe Simple
Enchufe Doble
Enchufe Triple
Tablero automtico
Focos exteriores
Empalme elctrico
Otros
Accesorios bao - cocina
Juego completo bao 1
Juego completo bao 2
Mueble Cocina
Mueble Colgante
Calefont XX ltr.
Otros
Personal
Constructor Civil
Jefe de Obra
Albail Primera (2 albail)
Albail Ayudante (2 ayudantes)
Enfierrador, Maestro
Carpintero, Maestro (2 carpintero)
Carpintero, Ayudante (2 ayudantes)
Pintor, Maestro
Trazador
Hojalateros
Jornaleros (2 jornales)
Electricista ($12000 por centro)
Gsfiter
Gsfiter Ayudante
Otros.
Costos Indirectos
Oficinas
Seguridad
Administrativo 1
Administrativo 2
Administrativo 3
Otros
Tiempo de Ejecucion

Unid
Unid
Unid
Und
GL

49.00
3.00
44.00
26.00
0.00

5,534
5,516
1,420
832
0

271,147
16,548
62,487
21,630
0

Unid
Unid
Unid
Unid
Unid
Unid

7.00
2.00
9.00
9.00
9.00
1.00

18,479
18,479
10,916
3,353
7,050
3,374,000

129,353
36,958
98,244
30,176
63,454
3,374,000

GL
GL
GL
GL
GL
GL
GL
GL
GL
Unid
GL
GL

24.00
12.00
6.00
6.00
4.00
9.00
2.00
9.00
1.00
2.00
1.00
0.00

17,555
14,277
2,176
2,933
2,176
1,252
2,706
3,269
18,303
14,277
180,000
0

421,311
171,328
13,059
17,597
8,706
11,269
5,412
29,420
18,303
28,554
180,000
0

GL
GL
GL
GL
Unid

1.00
1.00
2.00
1.00
0.00
0.00

40,328
40,328
47,639
19,487
0
0

40,328
40,328
95,277
19,487
0
0

Mes
Mes
Mes
Mes
Kg
Mes
Mes
M2
Mes
Mes
Mes
Unid
Mes
Mes

6.00
6.00
4.00
4.00
4099.61
5.00
5.00
554.98
4.00
1.00
6.00
72.00
2.00
2.00
0.00

1,000,000
750,000
840,000
400,000
200
840,000
400,000
1,300
400,000
300,000
400,000
12,000
350,000
200,000
0

6,000,000
4,500,000
3,360,000
1,600,000
819,922
4,200,000
2,000,000
721,474
1,600,000
300,000
2,400,000
864,000
700,000
400,000
0

Mes
Mes
Mes
Mes
Mes

6.00
6.00
4.00
0.00
0.00
0.00
6.00

150,000
250,000
320,000
0
0
0

900,000
1,500,000
1,280,000
0
0
0

Meses

SUB TOTAL

55,328,755

UTILIDAD

9%

4,979,588

GASTOS GENERALES

11%

6,086,163

IVA

18%

9,959,176

76,353,682

TOTAL