Basement Level 1 Column 2 Beam 3 Detached Retwall Pre-cast Concrete at Canopy Super structure Basement Level 1 Column 2 Beam 3 Detached Retwall Pre-cast Concrete at Canopy Notes :
45 3/1/2012
Finish
Schedule 4/14/2012 Actual
Labor Quantity
Materials
Quantity Quality Requirements
Specs
Remarks
Reference
Avel
Remarks
Avel
Holy Angel Proffesional Building 27-Sep-12 Start Duration Days Schedule Actual Finish
Schedule Actual Labor Quantity
Materials
Required Actual Percentage Quality Requirements
Specs
Remarks
Basement Floor Level Masonry Works CHB Wall 150mm thick 100mm thick Ground Floor Level Masonry Works CHB Wall 150mm thick 100mm thick 3rd Floor Level Masonry Works CHB Wall 150mm thick 100mm thick 4th Floor Level Masonry Works CHB Wall 150mm thick 100mm thick 5th Floor Level Masonry Works CHB Wall 150mm thick 100mm thick 6th Floor Level Masonry Works CHB Wall
Reference
Avel
131 days 132 days 9/2/2012 9/2/2012 8/21/2012 1/9/2013 1/9/2013
23.74 50 961.27 592.09 61.59% 350 psi 350 psi S-01 S-01 Updated as of Sep. 27, 2012.
646.67 50 248.418
S-01 S-01
150mm thick 100mm thick 6th Floor Level Masonry Works CHB Wall 150mm thick 100mm thick
Notes :
Remarks
Avel
Updated as of Sep. 27, 2012.
Start
Schedule 7/19/2012 12/14/2012 7/19/2012 Actual
Finish
Schedule 3/5/2013 1/27/2013 12/25/2012 Actual
Materials
Quantity Unit Ref. Quality Requirements
Specs
Remarks
Reference
Metal Works Structural Steel Framing Metal Decking Ground Floor Phase 1 Phase 2 Second Floor Phase 1 Phase 2 Third Floor Phase 1 Phase 2 Metal Stairs Basement Ground First Floor Metal Fabrications Metal Grating Baseboard
230 45 160
Avel
Separate Group/Team
Marielle
Avel
75 7 30
Notes :
Remarks
Avel
Separate Group/Team
Avel
Start
Schedule Actual
Finish
Schedule Actual
Labor Quantity
Materials
Quantity Quality Requirements
Specs
Remarks Marinell
Reference
253 190
6/19/2012 6/19/2012
2/26/2013 12/25/2012
90 45
11/29/2012 1/13/2013
2/26/2013 2/26/2013
Notes :
Remarks Marinell
Start
Schedule Actual
Finish
Schedule Actual
Labor Quantity
Materials
Quantity Quality Requirements
Specs
Remarks Marinell
Reference
30 30
3/1/2012 3/1/2012
Notes :
Remarks Marinell
Start
Schedule Actual
Finish
Schedule Actual
Labor Quantity
Materials
Required Actual Percentage Quality Requirements
Specs
Remarks Avel
Reference
Finishes
Wall Finishes
Basement Portland Cement Plaster
Portland Cement Plaster interior walls Perimeter Walls with Cementitious Water proofing Plastering - Perimeter Walls including openings Numbers - Doors Numbers - Windows Gypsum Board Wall Glass Walls Graphic Wall Films
10/12/2012
3/10/2013 Cement Plaster : 1,871.73 70.48 590.31 S-01 213-A n/a A.201 interior = 7,244.21 sqm 213-A exterior = 10,702.17 sqm
0.00
Cement Plaster : interior = 7,244.21 sqm 1,346.38 646.64 443.36 exterior = 10,702.17 sqm
Notes :
Remarks Avel
= 10,702.17 sqm
= 10,702.17 sqm
Start
Schedule Actual
Finish
Schedule Actual
Labor Quantity
Materials
Quantity Quality Requirements
Specs
Remarks Avel
Reference
Finishes
Floor Finishes Basement
Tiling Works Wood Flooring Stone Works Non- Skid concrete
150
10/12/2012
3/10/2013
Ground Floor
Tiling Works Wood Flooring Stone Works Non- Skid concrete
Notes :
Start
Schedule Actual
Finish
Schedule Actual
Labor Quantity
Materials
Quantity Quality Requirements
Specs
Remarks Avel
Reference
Finishes
Floor Finishes Basement
Tiling Works Wood Flooring Stone Works Non- Skid concrete
150
10/12/2012
3/10/2013
Ground Floor
Tiling Works Wood Flooring Stone Works Non- Skid concrete
Notes :