NOTES
GENERAL: With normal soil and site conditions, this standard precast manhole may be used for any required manhole depth. Sections of the precast manhole shall be cast and assembled with either all tongue or all groove ends up. Lift holes may be provided in each section for handling. Handling device for the flat slab shall be left in place. TOP:This section shall be a flat slab, unless an eccentric cone is specified. 1 6" [ 400] Frame and cover TRANSITION (OR REDUCER): This section can be either eccentric cone or flat slab. BASE: Manhole No. 3 is shown with a monolithic floor and riser which may be cast in one or two operations. A permissible alternate is to cast and ship the floor and barrel separately. Openings for inlet and outlet pipes shall be provided, either when the unit is cast or later, to meet project requirements. Bottom channels may be formed of concrete, precast in the base or field constructed as shown on SCD MH-1.1 and MH-3.1. RISER SECTIONS: Openings for 18" [450] and smaller inlet pipes may be either prefabricated, or cut in the field provided the sides of the pipe at the springline do not project into the manhole. CONNECTIONS: Connections between precast manhole sections, and pipes on sanitary sewers, may be sealed with resilient connectors conforming to ASTM C 923. JOINT SEAL: Seal between precast manhole sections on sanitary sewers shall be resilient and flexible gasket joints per CMS 706.11. OPENINGS: The maximum pipe opening shall be the O.D. of the pipe being supplied plus 2" [50] when fabricated or field cuts. Fill any voids per CMS 601. MATERIALS: Materials for bases and other precast sections, including reinforcement not specified hereon, shall comply with the requirements of CMS 706.13. DROP PIPE: When specified on the plans, drop pipe shall be constructed as shown on SCD MH-3.1. STEPS, FRAMES AND COVERS: Shall comply with the requirements set forth on SCD MH-1.1. Open n + 6" [ 50] mi . ig 1 n TOP SLAB REBAR: Reinforcing steel used within the top slab shall be epoxy coated.
Risers
max.
Mortar
REVISIONS
( I BRACKETS [ ) ARE N ]
Step (Typ.)
32" [ 800] mi . n
f cheek
Eccentric transition
STRUC TURA L M A N H O LE N o. 3
Base I.D.
24" [ 600]
max.
e z i S
4:1 Base
Base
I \ pr Const ucton Dr : \ r i awi ngs\ SCD\ Hy aul dr i cs\ M H\ M H1 2_ j . an06_ V8. dgn
. x a M
e e s (
Bottom channel
LEGEND
1 Reconstruction to grade only. Approved materials are kept on file by the Office of Materials Management.
Bottom channel
See ALTERNATE CORNER Detail As per CMS 706.13 Location of station and offset for manhole As per CMS 706.13 Location of station and offset for manhole
MIN. "t"
5" [125] 6" [150] 7" [175] 7" [190] 8" [200] 9" [230]
6" [ 50] mi . 1 n
e p i P
) e l b a t
] 0 5 . 7 x [ a " m 0 . 3 D . I
4:1
6" [ 50] mi . 1 n
O FFI E C
108" [2750]
M H -1. 2 2
EN G I EERI G N N
OF
OTHERWI SE NOTED.
J Stai s . n
NOTES
8" [200] 24" [600] dia. 6" min. [150] 24" [ 600] as step spaci g n 48" [1200] dia. 8" [200] MANHOLE NO. 3 W/ " BASE I.D. AND " DIVERSION WEIR: Furnish manhole base with precast diversion weir or construct diversion weir from Structure Concrete, Class C or Brick and Masonry Units conforming to CMS 604. A bottom channel section for the manhole is not required when a diversion weir is specified on the plans. Place diversion weir perpendicular to flow of inflowing trunk sewer. Dowel concrete or masonry units into the base of the manhole to a depth of 3" [75] using epoxy coated #4 reinforcing bars. Start dowels at the center of the diversion weir and space 16" [400] on center across the entire weir. All materials and labor, including excavation and backfill, shall be paid for at the contract priceITEM 604 for MANHOLE NO. 3 WITH " BASE I.D. AND " DIVERSION WEIR.
dia. + 2t
A
Diversion Weir
Dowel
mi . n
5" [125]
Manhole No. 3 48" [1200] dia. 60" to 96" [1500 to 2400] dia.
Same
8"
REVISIONS
ALTERNATE
7-20-01 7-19-02
7-15-06 7-20-06
( I BRACKETS [ ) ARE N ]
f cheek
SECTION A-A
(NTS)
I \ pr Const ucton Dr : \ r i awi ngs\ SCD\ Hy aul dr i cs\ M H\ M H1 2_ j . an06_ V8. dgn
8" [200]
8" [ 200]
Dowel
SCD NUMBER
mi . n
EN G I EERI G N N
O FFI E C
OF
OTHERWI SE NOTED.
6" [ 50] 1
mi . n
J Stai s . n