Professional Documents
Culture Documents
STEP #1
ASSESSING ESMs: INVENTORY FRAMEWORK
With the support of
The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.
Objectives :
The Inventory framework has been the central tool for the data collection. The Inventory framework gathers main informations regarding the economic, energy and awaraness performance of every ESMs. This document is a data basis. Every SHO and NHA completed informations and facts about the different measures experimented during the last 5 years. The Inventory is divided into 5 Work Packages according to the Annex I. Every indicator may not be completed and has to be foreseen according to the concerned energy saving measure. The Inventory is a first step to look for informations about ESMs and to select the most relevant ones.
2. ESM ID
n 2.1. SHO concerned 2.2. Country of implementation 2.3. Adress (locating) of the building concerned 2.4. Year of construction of the building and implementation of the ESM Construction of building Implementation of the ESM 2.5. Building description 2.6. Name of the ESM 2.7. Description of the ESM 2.8. Perimeter of the ESM Number of buildings/dwellings Number of inhabitants 2.9. Surface of the ESM (m2) 2.10. Number of years of monitoring Before After
Before
After
Before
After
Before
After
Before
After
Before
After