Environmental Engineering - II
Contents:
1. Activated Sludge Process - Design 2. Trickling filters Details & Design 3. Oxidation Pond - Design
SST
Qw X R = y Q (Yo YE ) ke Xt V
+ ke X t V = y Q (Yo YE )
Q Yo F = M V Xt
V Xt
+ ke ) X t V = y Q (Yo YE )
y Q (Yo YE ) c V Xt = (1 + ke c )
Ds DO saturation value for sewage DL Operation DO level in aeration tank - correction factor for O2 transfer for sewage (0.8- 0.85) Ns O2 @ std. condition 1.2 - 2.4 kg O2/kWh
Design of ASP
1.Compute daily sewage flow, YO and YE based on desired BOD removal 2. Find the F/M ratio and MLSS conc. from the std. table 3. From F/M, calculate V of the tank 4. Check the HRT (t = V/Q) & verify the value
Design of ASP
5. Check the SRT (c) to be maintained 6. Check the volumetric loading = Q YO/V 7. Check return sludge ratio (QR/Q) 0.25 to 0.50 8. Calculate tank dimensions, d 3-4.5 m; W 5 to 10 m & L 30 to 100 m
Design of ASP
9. Calculate the rate of air supply 100 m3 of O2/kg of BOD removed 10. Calculate no. of diffusers reqd. each length, 1.2 m3 O2/min/m2 11. Design the SST by assuming the surface loading rate; SST = 20 m3/d/m2 12. Finally design the sludge drying bed loading
High-rate TF
R I F = R [1 + 0 .1 ] 2 I
100
Y 1 + 0.0044 VF
Oxidation Ponds
o Open flow earthen basin o Longer detention period (few days to several days) o Stabilization ponds o O2 demand met by o Algae By aerobic bacteria algae and microbes
o Algal-photosynthesis or algal-symbiosis produce O2 during photosynthesis CO2, NH3 and phosphates below 0.5 m o End products o Very small depth
Oxidation Ponds
o Practically pure aerobic ponds are difficult to operate o Facultative ponds are used 1 to 1.5 m o Oxidation pond partially treated sewage is introduced as influent o Sewage Lagoon received raw sewage o Oxidation pond treatment reduced BOD/OM algae discharged along effluent
Oxidation Ponds
o Oxidation pond effluent not disposed in the U/S end of the dams/rivers o Oxidation Pond effluent used for land irrigation
90 to 60 kg/ha/day
o L = 2 W & depth ~ 1 to 1.5 m o Detention time 20 to 30 days o Free board 1m o BOD5 loading rate depends on latitude
o BOD removal - 90% & Coliform removal - 99% o Sludge accumulated in ponds 2 to 5 cm/year o Sludge removal required once in 6 years o Min liquid depth to be maintained 0.3 m
Design Problems
1. Design a conventional ASP to treat domestic sewage with diffused air aeration system, given the following data: Population 35,000; Ave. sewage flow 180 lpcd; BOD of sewage 220 mg/L; BOD removed in PST 30%; Overall BOD reduction desired 85%
2. Design suitable dimensions of a circular trickling filter units for treating 5 ML of sewage per day. The BOD of sewage is 150 mg/L. Also design suitable dimensions for its rotary distribution system, as well as under-drainage system.