3x660 MW STPP NTPC Barh Project Stage-I

Owner: NTPC Ltd. Client: JSC TPE Contractor: IOT Engineering Projects Ltd.

Presentation over Technical & drawing aspects of the projects

Convection shaft area


1. 2. 3. 4. 5. 6. 7. 8. 9. Convection shaft hot suspension Convection shaft buckstays Convection shaft waterwalls(Front, rear, external & internal) Convection shaft suspension system Low pressure reheater Stage 1 Economizer Steam cooled hanger tubes-3 Convection shaft bottom casing shield & hoppers Convection shaft roof waterwall

Horizontal gas duct area


1. 2. 3. 4. 5. Horizontal gas duct waterwalls.(front, rear, bottom) Low pressure reheater stage 2 HP Convective superheater Steam cooled hanger tubes-2 Horizontal gasduct roof waterwall.

Furnace area
1. 2. 3. 4. 5. 6. 7. 8. Furnace hot suspensions. Furnace waterwall buckstays Furnace waterwalls (Front, rear, left & right) Steam cooled hanger tubes-1 Platen superheater stage 1, 2 & 3 Burners Furnace bottom hopper Furnace roof waterwall

Sl. No. Pressure Part Sequence

1
2 3 4

Hot Suspensions & Buckstays


Convection Shaft Front, Rear & External Conv. Heating Surface Conv. Roof water wall

5
6 7 8

Steam Cooled Hanger tubes 3


Conv. Internal Water wall Horizontal gas Duct Front & rear WW LPR Stage 2

9
10 11 12

Furnace Front & Rear WW


SCHT 2 & 1 Conv. Super Heater Horizontal Gas Duct Bottom WW

13
14 15 16

Furn. Hot Suspension Burners


Furn. Side WW Platen Super Heater

17

Furnace Bottom Hopper

Thanking You