Assessment of Transmission Line Linesman for Tower Erection.

1. Tower Erection is taken up after __________________ works are completed in all respects and ______ period is over. 2. For starting the tower erection the following details are required. They are a. ________________ b. ________________ c. ________________ d. ________________ 3. Tower structures are usually _________ type and normal bolts of ____, _____, _____ & _____ mm dia are used. 4. _________ Grades bolts are normally used in tower erection. 5. The galvanized bolts lengths ranging from _____ to _____mm. 6. Anti climbing device is designed within the limits of _____ and _____ m from the ground on the tower of normal height. 7. Fill the left one in the stages of the tower erection which is given below: a. Collect tower parts from site b. Identify different parts c. d. Load and Unload the tower parts into the truck e. f. g. Assemble Cross arm h. Lift first legs over stub assembly i. j. Tight the bolts and nuts using ___________ and ___________. k. l. Perform tack weld. m. Paint the bolts and nuts. n. 8. Identify and segregate the tower parts using _____________ and _____________. 9. Four methods of erecting of towers for transmission lines. They are, a. _____________________. b. _____________________. c. _____________________. d. _____________________. 10. Which method requires heavy machineries like cranes, etc., Yes No. 11. Which method tower erection of can be done in any kind of terrain and throughout the year. Yes No. 12. If cheap labor is available, which method can be used for erection?

Yes No. 13. __________________ Ropes should be used in tower erection. 14. __________________ Should be used to align the bolt holes for inserting the bolts and nuts. 15. Gin Poles are most commonly made up of __________ and ___________ materials. 16. Gin Poles consists of length from ___________ to ___________. 17. In which method the Gin Pole, Derrick and Mobile Cranes are used? Ans.________________. 18. The Gin Pole and Derrick should be ___________ to ___________ m in section and tilt up method. 19. To prevent the birds perching immediately above the suspension insulator string and fouling the same with droppings, ______________ arrangements should be provided. 20. Where the painting of full/top of tower should be provided with Red, Orange and White paints? Ans.________________. 21. Before doing the tower erection, __________________ should be provided properly. 22. What is the device used for checking the torque of bolts & nuts? 23. Conductor marking lights and Tower marking lights are _________________ markers. 24. While doing ground assembly arrange the tower parts sequentially as per the bill of materials using __________________. 25. Unload the tower parts on the _____________________ from the truck using the proper material handling devices like cranes, fork lift etc. 26. The cross arms is assembled about how many meters away from the tower in the piecemeal method? Ans._____________________. 27. What are the colors of the Phase Plates? Ans._____________________. 28. Give the approved torque value of the bolts according to the size. a. 12 mm __________________. b. 16 mm __________________. c. 22 mm __________________. d. 24 mm __________________. 29. What are the key parts of the tower? Ans._____________________. 30. After tightening of the bolts and nuts throughout the tower, welding process was done up to bottom cross arm level. Yes / No. 31. Threaded portion of bolts projected outside of nut is not less than 3mm. Yes /No. 32. Punching of bolts & nuts are done for all bolts & nuts of towers? Yes / No. 33. What is PPE? Ans._________________________. 34. What PPES are used in transmission lines?

Ans._________________________. 35. While doing the Tower Erection using Mobile Crane Walkie Talkie is used for communications. Yes / No. 36. 37. 38. 39. 40. Sorting of tower parts is done at ________ Sorting out of tower parts at site is to facilitate easy ______ Step bolts are used in ______ legs. Step bolts length is normally _______ mm with two nuts and spring washer. Cutting of members at site during erection is not allowed at site.

Yes /No. 41. Repair to galvanized surface of tower members is done using _______________________ 42. Gin poles are provided with a minimum of _____ stay ropes during erection. 43. Bolt & nut tightening is done from bottom to top. Yes / No. 44. While using crane hand signal is not important. Yes / No. 45. Erection tools and plants are checked for suitability before taking up erection. 46. Tower Accessories include. -ACD - Number / Number Plate. -Danger plate. -Phase plate. -Circuit plate. 47. What Details are Available in BOM____ 48. Tower Footing resistance for towers are measured using _______ and the value should be legs than_______ 49. Heavy hammering of bolts & nuts are used during erection. Yes / No 50. Erection Safety?

You might also like