You are on page 1of 6

Assignment 1 IT Infrastructure development for a college

Submitted to:
Prof. Vikas Maskeri

Prepared By:
Pranita A. Joshi.

Roll No. 21

IT infrastructure is all of the components needed to deliver IT services ; the hardware, software, network and facilities required to develop, test, deliver and support IT. IT infrastructure must be maintained correctly for everything to run smoothly. A good IT infrastructure will place you ahead of your competition by creating a more cost effective, responsive solution. IT infrastructure is often the driving force behind business which further accentuates the importance of why it needs to be efficient, flexible and secure. In the given Assignment Initial students are 100 in the college and college have departments initially as follows : 1. Admin department This department is associated with the following: a. Director b. Backend c. support 2. computer lab This department takes care of lab system available for students. 3. Library This department arranges the books for library 4. Canteen This department provides the canteen facility 5. Accounts This department looks after the academic fees, overall accounts of college 6. Security This department takes care of assets of college. 7. Teaching This is the department designed for teaching staff

TYPES OF NETWORKS TO BE USED- LAB and also server

a. Server- Distributed server access Storage: 1TB Processor: Pentium D: 2.66-3.6GHz clock speed; 2 processor cores RAM: 8GB Motherboard: Intel Server Board S4600LH2 Power Supply: 300 watts Monitor: 19-inches in size have a 1,280x1,024 pixel native resolution WIFI: Range 100 meters

b. Access restrictions: Based on time period c. Topology used: Star d. No. of systems (50- for 100 students/ admin-no. of teaching and non-teaching staffs ) 50 systems for 100 students, & 20 pcs for Admin person, teaching & non-teaching staff Connections: a. 1 LAN connection only for Computer lab b. 1 LAN for admin

STORAGE TYPES AND DEVICES a. Backup server o Storage: 1TB o Processor: Pentium D: 2.66-3.6GHz clock speed; 2 processor cores o RAM: 8GB o Motherboard: Intel Server Board S4600LH2 o Power Supply: 300 watts o Monitor: 19-inches in size have a 1,280x1,024 pixel native resolution o WIFI: Range of 100 meters b. Magnetic tapes c. Hard disks

PCS REQUIRED AND THE CONFIGURATION after 5 years Per year there is increase in number of students by 10. And after 5 years some departments are added in the college The following departments are added: Sports department To organize sport activities in college Campus recruitment placements/ summer internship department For recruitments and to keep in touch with companies. Event organizing department To organize intra as well as inter college Events.

a.

Server- Distributed server access Storage: 1TB Processor: Pentium D: 2.66-3.6GHz clock speed; 2 processor cores RAM: 16GB Motherboard: Intel Server Board S4600LH2 Power Supply: 300 watts Monitor: 19-inches in size have a 1,280x1,024 pixel native resolution WIFI: Range of 100 meters

b. Access restrictions: Based on time period c. Topology used: Star d. No. of systems (75- for 150 students/ admin-no. of teaching and non-teaching staffs ) 75 systems for 150 students, & 30 pcs for Admin person, teaching & non-teaching staff Connections: 2 LAN connection only for Computer lab 1 LAN for admin

STORAGE TYPES AND DEVICES Backup server o Storage: 1TB o Processor: Pentium D: 2.66-3.6GHz clock speed; 2 processor cores o RAM: 16GB o Motherboard: Intel Server Board S4600LH2

o o o

Power Supply: 300 watts Monitor: 19-inches in size have a 1,280x1,024 pixel native resolution
WIFI: Range of 100 meters

Magnetic tapes Hard disks

PCS REQUIRED AND THE CONFIGURATION after 10 years

Per year there is increase in number of students by 10. And after 10 years configurations required will be: a. Server- Distributed server access Storage: 1TB Processor: Pentium D: 2.66-3.6GHz clock speed; 2 processor cores RAM: 20GB Motherboard: Intel Server Board S4600LH2 Power Supply: 300 watts Monitor: 19-inches in size have a 1,280x1,024 pixel native resolution
WIFI: Range of 100 meters

b. Access restrictions: Based on time period c. Topology used: Star d. No. of systems (100 - for 200 students/ admin-no. of teaching and non-teaching staffs ) 100 systems for 200 students, & 30 pcs for Admin person, teaching & non-teaching staff Connections: 2 LAN connection only for Computer lab 1 LAN for admin

STORAGE TYPES AND DEVICES Backup server o o o o o o o Storage: 1TB Processor: Pentium D: 2.66-3.6GHz clock speed; 2 processor cores RAM: 20GB Motherboard: Intel Server Board S4600LH2 Power Supply: 300 watts Monitor: 19-inches in size have a 1,280x1,024 pixel native resolution
WIFI: Range of 100 meters

Magnetic tapes Hard disks

You might also like