You are on page 1of 48

VISION & MISSION of

ISO 9001

INTRODUCTION
VISION
Piling techs vision is to be recognized as one of the most dynamic and trusted engineering partners in the region, with a reputation for on time delivery, quality workmanship, superior staff, transparent dealings and a design & build contractor with creativity to innovate design and execution of complex solutions to serve the region. INTRODUCTION AND COMPANY PROFILE : We have the pleasure in presenting our company profile in which our services are outlined. PILING TECH L.L.C was established in U.A.E. since 2003. The company is one of the Civil Engineering companies in Foundation Engineering, designing and developing the latest techniue in boring and driven pilling systems. PILING TECH L.L.C offers clients of the Gulf industry through their professionally dedicated team, a unique package of specialist services to incorporate the design, construction testing and maintaining of foundation engineering solution employing a full range of bores and other techniques. THE BUSINESS AIMS OF PILING TECH L.L.C are ; To respond promptly and fully to the requirements of tender enquiries. To enter into equitable agreements with clients for piling and associated works entrusted to thee. To discharge its obligations under said agreements such that its services are executed safely and with total regards for quality and clients cost budgets and programs. Hope that the attached document meets your satisfaction; however you should require any further information please do not hesitate to contact the PILING TECH L.L.C.

MISSION
The Piling tech direction is based on a simple and timeless rule to treat its customers, vendors and employees in the same manner that we would have them treat us.To this end we pledge the following. * to provide our customers with a quality product at a fair prize, delivered in a timely manner. * to speed up the open communications. * to communicate the needs of the company, as well as to listen to the needs of others : * to treat our employees with dignity and respect. * to treat our subcontractors and vendors with the same dignity and respect.

ISO 9001

ISO 9001

ISO 9001

ISO 9001

PILING WORKS

BORED PILE USING BENTONITE SYSTEM

BORED PILE USING BENTONITE SYSTEM CONTINUOUS FLIGHT AUGER (CFA) SYSTEM

10

11

ISO 9001

ISO 9001

12

13

ISO 9001

ISO 9001

14

15

ISO 9001

ISO 9001

16

17

ISO 9001

ISO 9001

CONTINUOUS FLIGHT AUGER PILE (CFA System)

18

19

ISO 9001

ISO 9001

20

21

ISO 9001

ISO 9001

SHORING WORKS

SECANT PILE CONTIGUOUS PILE SOLDIER PILE

22

23

ISO 9001

ISO 9001

SHORING WORKS

SECANT PILE

24

25

ISO 9001

ISO 9001

Construction of Secant Pile Wall

26

27

ISO 9001

ISO 9001

CONTIGUOUS PILE

Construction of Contiguous Bored Pile Wall

28

29

ISO 9001

ISO 9001

30

31

ISO 9001

ISO 9001

SOLDIER PILE

32

33

ISO 9001

ISO 9001

ANCHORING WORKS

Tiebacks-Ground Anchors-Rock Anchors

34

35

ISO 9001

ISO 9001

STEPS IN MAKING A MULTILEVEL TIEBACK EXCAVATION

36

37

ISO 9001

ISO 9001

DEWATERING WORKS

Using Tieback Ground Anchor to Supporting Shoring Wall.

Using Anchor in Crown Test

38

39

ISO 9001

ISO 9001

CUTTING HEAD OF PILE

40

41

ISO 9001

ISO 9001

PILE TESTING WORKS

PILE STATIC LOAD TEST PILE DYNAMIC TEST PILE SONIC TEST PILE INTEGRITY TEST

42

43

ISO 9001

ISO 9001

PILE STATIC LOAD TEST (KENTLEDGE SYSTEM)

44

45

ISO 9001

ISO 9001

INTRODUCTION

I st CYCLE

46

47

ISO 9001

ISO 9001

II nd CYCLE

RESULTS

48

49

ISO 9001

ISO 9001

PILE STATIC LOAD TEST (CROWN SYSTEM)

50

51

ISO 9001

ISO 9001

52

53

ISO 9001

ISO 9001

PILE DYNAMIC TEST

54

55

ISO 9001

ISO 9001

SCOPE

DYNAMIC TESTING FIRM

56

57

ISO 9001

ISO 9001

TEST PILE REQUIRMENTS

58

59

ISO 9001

ISO 9001

TEST PROCEDURE TEST REPORT

GENERAL

TEST PILE REQUIREMENTS

TEST PILE

DYNAMIC TESTING RESULTS

60

61

ISO 9001

ISO 9001

PILE SONIC TEST

62

63

ISO 9001

ISO 9001

SCOPE

METHOD AND APPARATUS

TEST PILE REQUIREMENTS

64

65

ISO 9001

ISO 9001

TEST PROCEDURE

ANALYSIS PROCEDURE

66

67

ISO 9001

ISO 9001

TEST REPORT

PILE INTEGRITY TEST

68

69

ISO 9001

ISO 9001

SCOPE

SUMMARY

METHOD & APPARATUS

70

71

ISO 9001

ISO 9001

TEST PILE REQUIREMENTS ANALYSIS PROCEDURE

TEST PILE PROCEDURE

72

73

ISO 9001

ISO 9001

LIMITATIONS TEST REPORT

GENERAL

PILE SPECIFIES

REFERENCES

74

75

ISO 9001

ISO 9001

MACHINERIES AND EQUIPMENTS

MACHINERIES AND EQUIPMENTS (IMAGES)

76

77

ISO 9001

ISO 9001

78

79

ISO 9001

ISO 9001

EXECUTED PROJECTS

82

83

ISO 9001

ISO 9001

OUR PROJECT DETAILS

OUR PROJECT DETAILS

84

85

ISO 9001

ISO 9001

OUR PROJECT DETAILS

OUR PROJECT DETAILS

ISO 9001

ISO 9001

88

89

Piling Tech LLC Organisational Chart


Operations Manager
Eng. Hassan Ibrahim

PROJECTS DEPARTMENT

TECHNICAL DEPARTMENT
Technical Dept. Manager Eng. Ashok M. Pandi
Draftsman Mr. Ayman

QUALITY DEPARTMENT
Quality Manager Eng. Ahmed Jamal

ACCOUNTS DEPARTMENT

MAINTENANCE DEPARTMENT

Projects Manager Eng. Ahmed Jamal

Mr. Hector Casas

MAINTENANCE MANAGER Eng. Hassan Ibrahim

QA/QC ENGINEERS

SAFETY OFFICERS

MECHANICS

WELDERS

ELECTRICIANS

ERP Operators

STORE DEPARTMENT

PROJECT ENGINEERS

SURVEYOR DEPARTMENT

TESTING DEPARTMENT

STORE MANAGER
Mr. Yasser Adam

SITE ENGINEERS

CHIEF SURVEYOR
Eng. Naqib Ahmed

TESTING ENGINEERS TESTING FOREMANS

STORE KEPPER & ERP OPERTOR


Mr. Rajesh Manikoth

FOREMANS

SURVEYORS

STORE STAFF PUMP OPERATORS SHOVEL OPERATORS CRANE OPERATORS RIG OPERATORS

DRIVERS

CARPENTER

LABOURS

ISO 9001

ISO 9001

Commercial License - Ajman

Commercial License - Sharjah

92

93

ISO 9001

ISO 9001

Commercial License - Dubai

Commercial License - Abu Dhabi

94

95

Tel.: +971 6 7426878 Fax: +971 6 7426787 P.O. Box : 4048 Ajman - U.A.E. E-mail: info@pilingtech.ae Branches:
Iraq : +964 780 001 4444 , Baghdad. Sudan : +249 912 327 909

You might also like