Breakthrough Management Group

Cause and Effect Matrix


Scratch Line Pinch marks Coil Buildup Sooot marks
M1 = MAN, M2=MACHINE, M3=MATERIAL M4= METHOD , M5=MEASUREMENT, M6 = MOTHER NATURE [ENVIRONMENT]

3 Thickness Nagative

5 Dent marks

6 Waviness

7 Roll marks

8 Edge damage

10

11

12 Untrimmed

13 Edge burrs

14 Rusty spot

15

16

17

18

19

20

Width variation Width variation Thickness possitive

Blackish surface

Process Step

Process Input CRANE OPERATOR SLINGHOPPER SKINPASSED / UNSKINPASSED COILS

Customer Priority Six M's M1 M2 M3 M1 M2 M1 M2 M1 M1 M1 M2 M2 M2 M1 M3 M2 M2 M1 M3 M2 M2

Coil wt. 6 Total 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 3 0 3 3

1 2 3 4 5 6 7 8 9

COIL SHIFT ON I/P SADDLE

0 0 0 0 0 1 1 0 1 1 0 8 8 0 0 0 0 0 0 0 0

0 0 0 0 0 1 1 0 1 1 0 8 8 0 0 0 0 0 0 0 0

0 0 0 0 0 1 1 0 1 1 0 3 3 0 0 0 0 0 0 0 0

0 0 3 2 1 0 0 0 0 0 0 3 3 0 0 0 0 3 0 0 0

0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 1 0 0 0 0 0 0 0 0 3 0 0 0 0 3 0 0 0 0

0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 2 2 0 1 0 0 0 0 0 0 3 3 0 0 2 0 3 0 3 0

0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 8 8 0 8 2 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0

0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 6 0 5 0 0

18 12 62 12 12 27 27

LOAD COIL ON OPERATOR ENTRY DESK UNCOILER MANDREL

ENTRY COIL CAR


COIL DATA SELECT

OPERATOR ENTRY DESK L 2 SYSTEM OPERATOR ENTRY DESK OPERATOR/ TECHANICIAN SHIFT INCHARGE ARBOR FIXING SPACERS & CUTTERS SETTING GAP SETTING ARBOR TIGHTENING SAMPLE CUTTING SLITTING / TRIMMING TENSIONER SETTING OPERATOR COIL BUILDUP EXIT COIL CAR CRANE

OILING

10 SLITTING 11 12 13 14 15 16 17 18 19 TENSIONER UNIT 20 21 RECOILER UNIT 22 23 24 25 26 27 28 29 30 31 SYSTEM UPDATION 32 33 34 COILS PACKING 35 36


SHIFTING TO 37 STORAGE YARD OUTPUT COIL DECISION OUTPUT COIL WEIGHTMENT

21 21 0 237 219 0 40 52 0 42 0 54 20

18 0

M1 QA/QC ENGG TESTING EQUIPMENT VISUAL INSP DIMENSINS MOTHER NATURE OPERATOR'S Entry Operator IDENTIFYING COIL BY LEVEL2 PASTING OF BARCODE STICKER RIGGER PACKING VCI PAPER PACKING METHOD BY CRANE MOTHER NATURE OPERATOR'S M2 M4 M5 M6 M1 M2 M1 M1 M3 M4

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 3 3 3 0 0 0 0 0

0 0 0 0 0 18 18 18 0 0 0 0 0 0 0 0 0 0 0

M2 M6

38

Total LSL TGT USL


1. 2. 3. 4. 5.

160

160

50

90

42

132

10

130 30

10

56 120

List the key outputs to the process. Rate each output on a 1-10 scale. List the inputs and process steps. Use the process map and fishbone for inputs. Rank each input as to how it affects each output on a 1-10 scale. Sort the rows based on the Total column. The inputs are now ordered by customer's priorities.

Note: If modifications are made to this worksheet (e.g. adding rows or columns, calculations should be verified.

Page 1

You might also like