You are on page 1of 30

Location

D1 - Hulu
q (t/m2)

b11

b12

b13

Top wall level


River bed level
Ground water level
River water level
Foundation level

=
=
=
=
=

79.00
69.50
75.00
74.00
67.50

m
m
m
m
m

Dimension
H = 11.50

B =

10.00

b11 =
b21 =

1.00
7.50

m
m

b12 =
b22 =

0.50
1.50

m
m

b13 =
b23 =

0.00
1.00

m
m

h1 =
h4 =

11.50
2.00

m
m

h31 =
hw1 =

1.00
7.50

m
m

h32 =
hw2 =

0.50
6.50

m
m

q =
gc =

0.50
2.40

t/m Kh =
t/m3
gw =

0.18
1.00

t/m3

a
a
b

0.00
5.71
0.00

(unit length)
1.00
m

a
H=h1

hw1

h32

hw2
h31

b21

b22

b23

Section of Retaining wall

h4

Backfill soil
t/m3
gsoil =
1.80
t/m3
gsat =
2.00
o
f =
30.0
t/m2
c =
0.00
Foundation soil
t/m3
gs' =
1.00
o
fB =
30.0
t/m2
cB =
0.00
Friction coefficient
m =
0.50
Uplift coefficient
Um =
1.00
Cover of bar
Wall
d back =
7
cm
d front =
7
cm
Footing
d upper =
7
cm
d lower =
7
cm

108393437.xls.ms_office-9/4/2012

=
=
=

o
o

(for stability analysis)


(for structural analysis)

Safety factor
(normal) (seismic)
|e| < B/6=1.92 B/3=3.33
Overturning
fs >
Sliding
2.00
1.25
Reaction of foundation soil
qmax > qa=qu/3 qae=qu/2
Allowable stress
2
Compressive sca =
kg/cm
60
90
2
Tensile
kg/cm
ssa =
1850
2775
Shear
kg/cm2
ta =
5.5
8.25
Young's modulus ratio
24
16

STABILITY

: D1 - Hulu

Normal Condition

Seismic Condition

a) Stability against overturning

a) Stability against overturning

|e| = 0.69 m < B/6 = 1.67 m

|e| = 1.09 m < B/3 = 3.33 m

OK!

b) Stability against sliding


Fs =

2.02

>

2.00

b) Stability against sliding


OK!

Fs =

c) Reaction of foundation soil


q1 =
q2 =

26.72
16.46

t/m2
t/m2

108393437.xls.ms_office-9/4/2012

OK!

< qa =
< qa =

1.26

>

1.25

OK!

c) Reaction of foundation soil


48.67
48.67

t/m2
t/m2

OK!
OK!

q1 =
q2 =

29.93
12.40

t/m2
t/m2

< qae =
< qae =

73.00
73.00

t/m2
t/m2

OK!
OK!

Stressing of Reinforcement and Concrete


Name of Structure
Location

: D1 - Hulu
: 0

Normal Condition

Allowable compressive stress (sca)


Allowable tensile stress (ssa)
Allowable shearing stress (ta)
Young's modulus ratio

Item
b (cm)
h (cm)
d1 (cm)
d2 (cm)
d (cm)
M (ton m)
S (ton)

Section A-A
100.0
90.0
7.0
back
7.0
front
83.0
7
5

=
=
=
=

60
1850
5.5
24

Section B-B
100.0
150.0
7.0
back
7.0
front
143.0
106
30

kg/cm2
kg/cm2
kg/cm2
Section C-C
100.0
150.0
7.0
lower
7.0
upper
143.0
12
23

Section D-D
100.0
150.0
7.0
upper
7.0
lower
143.0
106
22

Bar size and spacing (mm)


Section of Retaining wall

Bar (As1)
Bar (As2)
Stress sc
Stress ss
Stress t

Seismic Condition

A
C

7
390
0.61

200
250
OK!
OK!
OK!

D 25 D 16 -

Item
b (cm)
h (cm)
d1 (cm)
d2 (cm)
d (cm)
M (ton m)
S (ton)

Section A-A
100.0
90.0
7.0
7.0
83.0
11
8

100
125

35
1699
2.11

Allowable compressive stress (sca)


Allowable tensile stress (ssa)
Allowable shearing stress (ta)
Young's modulus ratio

A
D

D 25 D 16 -

D 16 D 16 -

OK!
OK!
OK!
=
=
=
=

90
2775
8.25
16

Section B-B
100.0
150.0
7.0
7.0
143.0
162
46

250
250

8
1080
1.62

OK!
OK!
OK!

D 25 D 16 35
1699
1.52

100
250
OK!
OK!
OK!

kg/cm2
kg/cm2
kg/cm2

Section C-C
100.0
150.0
7.0
7.0
143.0
13
26

Section D-D
100.0
150.0
7.0
7.0
143.0
162
28

Bar size and spacing (mm)


Section of Retaining wall

108393437.xls.ms_office-9/4/2012

Bar (As1)
Bar (As2)
Stress sc
Stress ss
Stress t

D 25 - 200
D 16 - 250
13
OK!
583
OK!
0.93 OK!

D 25 - 100
D 16 - 125
62
OK!
2554 OK!
3.19 OK!

D 16 - 250
D 16 - 250
11
OK!
1204 OK!
1.82 OK!

D 25 - 100
D 16 - 250
62
OK!
2554 OK!
1.95 OK!

Stability4/30

1. Design Data
1.1 Dimensions

q (t/m2)

10.00

11.50

1.00

m (unit length)

b11

1.00

b21

7.50

b12

0.50

b22

1.50

b13

0.00

b23

1.00

h1

11.50

h4

2.00

h31

1.00

h32

0.50

hw1
hw2

=
=

7.50
6.50

m
m

b11

b12

b13

H=h1

hw1
h32

1.2 Parameters

h31
2

gc

=
=
=

0.50
0.00
2.40

t/m (for normal condition)


t/m2 (for seismic condition)
t/m3

gw

1.00

t/m3

Backfill soil
gsoil
=

1.80

t/m3

gsat

2.00

t/m3

0.00

t/m2

30.00

b2

Foundation soil
gs '
=
1.00
cB
=
0.00

b2

Safety factor
Overturning

t/m3 (=gsat-gw)
t/m2

fB

30.00

0.50

(Friction coefficient)

Um

1.00

(Uplift coefficient)

0.000

0.000

(for stability analysis)

5.711

0.000

(for structural analysis)


(for stability analysis in normal condition, d = b)

20.00

(for structural analysis in normal condition, d = 2/3 f)

24.23

15.00

(for stability analysis in seismic condition, see Section 2.3)


(for structural analysis in seismic condition, d = 1/2 f)

= 10.204

b23

Section of Retaining
Wall
B

hw2

h4

normal

|e|<B/6=1.67m

seismic

|e|<B/3=3.33m

Sliding
normal
seismic

( = Arc tan(Kh) )

Kh

fs > 2.00
fs > 1.25

Reaction of foundation soil


qmax<qa
normal
seismic

qa=qu/3
qmax<qae
qae=qu/2

0.18

2. Stability Calculation
2.1 Case 1 (Normal condition, with vertical live load)
1.00
q =

0.50

t/m2

0.50
0.00

qa1

Pa1
Pa2

10

11.50

10.00

qa2
7.50

11

Pw1

12

Pa4

qa4

2.00

1
qw1

0.50

Pa3

qa3

qu2
1.50

1.00

Pu1
qu1
7.50

Pu2

Acting Load in Case 1

108393437.xls.ms_office-9/4/2012

Pp1
O

qp1

6.50
Pw2

1.00

qw2

Stability5/30
(1) Vertical Load
No.
1
1.00
2
1.50
3
1.00
4
0.50
5
0.50
6
0.50
7
10.00
8
0.50
9
0.50
10
7.50
11
7.50
12
0.50
q
0.50
T o t a l(1 to q)
Pu1
7.50
Pu2
6.50
Total ( 1 to Pu2)

x
x
x
x
x
x
x
x
x
x
x
x
x

Description
7.50
x
2.40
1.50
x
2.40
1.00
x
2.40
0.50
x
7.50
0.50
x
1.00
10.00 x
1.00
0.50
x
2.40
10.00 x
0.00
10.00 x
1.00
4.00
x
1.80
6.00
x
2.00
7.50
x
0.50
8.50

x
x

10.00
10.00

x
x

0.50
0.50

x
x
x

2.40
2.40
2.40

x
x

2.40
1.80

2.00

x
x

-1.00
-1.00

W
18.000
5.400
2.400
4.500
0.600
12.000
12.000
0.000
9.000
54.000
90.000
3.750
4.250
215.900
-37.500
-32.500
145.900

X
6.250
1.750
0.500
5.000
0.333
2.167
1.250
1.000
2.167
6.250
6.250
7.500
5.750
6.667
3.333

(2) Horizontal Load


Coefficient of Active earth pressure
Cos2(f -a)

Ka =
Cos2a x Cos(a+d) x

1+

Sin(f+d) x Sinf
Cos(a+d) x Cosa

(for stability analysis)


a
=
Cos (f -a) =
Cos2a
=

0.000

Cos(a+d)

Ka =

0.000

0.750

d
Sin(f+d)

0.500

1.000

Sinf

0.500

1.000

Cosa

1.000

20.000

0.831

d
Sin(f+d)

0.333 for stability analysis

(for structural analysis)


a
=
Cos (f -a) =
Cos2a
=

5.711

0.766

0.990

Sinf

0.500

Cos(a+d)

0.901

Cosa

0.995

Ka' =

0.341 for structural analysis

Coefficient of Passive earth pressure


Cos2(f+a)

Kp =
Cos2a x Cos(a -d) x

a
=
Cos2(f+a) =
Cos2a
=
Cos(a -d)
=

Sin(f+d) x Sinf
Cos(a -d) x Cosa

d
Sin(f+d)
Sinf
Cosa

=
=
=
=

0.000
0.500
0.500
1.000

=
=
=
=

0.167
2.400
2.567
2.500

qw 1 = hw1 x gw

7.500 ton/m

qw 2 = hw2 x gw
qp1 = Kp x h4 x (gsat - gw)

=
=

6.500 ton/m
6.000 ton/m

Kp =
qa1
qa2
qa3
qa4

=
=
=
=

0.000
0.750
1.000
1.000

1-

3.000
Ka x q
Ka x (h1- hw1) x gsoil
qa1 + qa2
Ka x hw1 x (gsat - gw)

108393437.xls.ms_office-9/4/2012

ton/m
ton/m
ton/m
ton/m

WxX
112.50
9.45
1.20
22.50
0.20
26.00
15.00
0.00
19.50
337.50
562.50
28.13
24.44
1,158.92
-250.00
-108.33
800.58

Stability6/30
No.
Pa1
Pa2
Pa3
Pa4
Pw1
Pw2
Pp1
Total

0.167
2.400
2.567
2.500
7.500
-6.500
-6.000

Description
4.00
4.00
x
0.50
7.50
7.50
x
0.50
7.50
x
0.50
6.50
x
0.50
2.00
x
0.50

x
x
x
x
x
x
x

H
0.667
4.800
19.250
9.375
28.125
-21.125
-6.000
35.092

Y
9.500
8.833
3.750
2.500
2.500
2.167
0.667

HxY
6.33
42.40
72.19
23.44
70.31
-45.77
-4.00
164.90

(3) Stability Calculation


a) Stability against overturning
a) -1 Without Uplift
B = 10.00 m
SWxX-SHxY
X =

1,158.92 -

SW
X

800.58

4.357

4.357

0.643

0.50

164.90

1.667

OK !

< B/6

1.667

OK !

b) Stability against sliding


b)-1 Without Uplift
SH
Sliding force :

35.092 ton

HR = m x S W

Resistance :

(friction coefficient : m =
HR

0.50

3.076

>

35.092 ton

215.900 =

107.950 ton

107.950
=

2.00

OK !

35.092
SH

HR = m x S W

Resistance :

(friction coefficient : m =
HR
SH

< B/6

10.00
X

Fs =

145.900

SH
b)-2 With Uplift
Sliding force :

0.396

4.604

Fs =

SW

e =

SWxX-SHxY
X =

4.604

10.00
-

2
a) -2 With Uplift
B = 10.00

=
215.900

B
e =

164.90

0.50

145.900 =

72.950

ton

<

qa

2
48.667 t/m

OK !

<

qa

2
48.667 t/m

OK !

0.5 )

72.950
=

2.079

>

2.00

OK !

35.092

c) Reaction of foundation soil


SW
6xe
q1,2 =
x (1 +
)
B
B
215.900
q1 =

6x

0.396

x (1 +
10.00
215.900

q2 =

) =

2
26.720 t/m

10.00
6x
x (1 -

10.00

0.396

2
) = 16.460 t/m
10.00
Reaction of Foundation Soil in Case 1

2
16.460 t/m

2
- t/m

26.720 t/m
in case, e > 0
(applicable)

108393437.xls.ms_office-9/4/2012

- t/m

in case, e < 0
(not applicable)

Stability7/30
2.2 Case 2 (Normal condition, without vertical live load)
1.00
q =

0.50

t/m2

0.50
0.00

qa1

Pa1
Pa2

10

11.50

10.00

qa2
7.50

11

Pw1

12

Pa4

qa4

2.00

qw1

0.50

Pa3

qu2
1.50

Pu2

Pu1

qa3

qu1
7.50

Pp1
O

qp1

qw2

1.00

Acting Load in Case 2


(1) Vertical Load
No.
1
1.00
2
1.50
3
1.00
4
0.50
5
0.50
6
0.50
7
10.00
8
0.50
9
0.50
10
7.50
11
7.50
12
0.50
T o t a l (1 to 12)
Pu1
7.50
Pu2
6.50
Total ( 1 to Pu2)

x
x
x
x
x
x
x
x
x
x
x
x

Description
7.50
x
2.40
1.50
x
2.40
1.00
x
2.40
0.50
x
7.50
0.50
x
1.00
10.00 x
1.00
0.50
x
2.40
10.00 x
0.00
10.00 x
1.00
4.00
x
1.80
6.00
x
2.00
7.50
x
0.50

x
x

10.00
10.00

x
x

0.50
0.50

x
x
x

2.40
2.40
2.40

x
x

2.40
1.80

2.00

x
x

-1.00
-1.00

W
18.000
5.400
2.400
4.500
0.600
12.000
12.000
0.000
9.000
54.000
90.000
3.750
211.650
-37.500
-32.500
141.650

X
6.250
1.750
0.500
5.000
0.333
2.167
1.250
1.000
2.167
6.250
6.250
7.500
6.667
3.333

WxX
112.50
9.45
1.20
22.50
0.20
26.00
15.00
0.00
19.50
337.50
562.50
28.13
1134.48
-250.00
-108.33
776.15

(2) Horizontal Load


Coefficient of Active
earth pressure
Cos2a x Cos(a+d) x
Ka =

0.333 (for stability analysis)

Ka ' =

0.341 (for structural analysis)

Coefficient of Passive earth pressure


Kp =

3.000

qa1 = Ka x q
qa2 = Ka x (h1- hw1) x gsoil

=
=

0.167 ton/m
2.400 ton/m

qa3 = qa1 + qa2


qa4 = Ka x hw1 x (gsat - gw)
qw 1 = hw1 x gw

=
=

2.567 ton/m
2.500 ton/m

7.500 ton/m

qw2 = hw2 x gw
qp1 = Kp x h4 x (gsat - gw)

=
=

6.500 ton/m
6.000 ton/m

No.
Pa1
Pa2
Pa3
Pa4
Pw1
Pw2
Pp1
Total

0.167
2.400
2.567
2.500
7.500
-6.500
-6.000

x
x
x
x
x
x
x

108393437.xls.ms_office-9/4/2012

Description
4.00
4.00
x
0.50
7.50
7.50
x
0.50
7.50
x
0.50
6.50
x
0.50
2.00
x
0.50

H
0.667
4.800
19.250
9.375
28.125
-21.125
-6.000
35.092

Y
9.500
8.833
3.750
2.500
2.500
2.167
0.667

6.50
Pw2

1.00

HxY
6.33
42.40
72.19
23.44
70.31
-45.77
-4.00
164.90

Stability8/30
(3) Stability Calculation
a) Stability against overturning
a)-1 Without Uplift
B = 10.00 m
SWxX-SHxY
X =

1,134.48 -

SW
X

776.15

4.315

4.315

0.685

0.50

164.90

< B/6

1.667

OK !

< B/6

1.667

OK !

10.00
X

b) Stability against sliding


b)-1 without Uplift Pressure
SH
Sliding force :

35.092 ton

HR = m x S W

Resistance :

(friction coefficient : m =
HR

211.650 =

105.825 ton

0.5 )

105.825
=

SH
35.092
b)-2 with Uplift Pressure
SH
Sliding force :

3.02

2.00

(friction coefficient : m =
HR

>

OK !

35.092 ton

HR = m x S W

Resistance :

SH

141.650

Fs =

0.419

4.581

Fs =

SW

e =

SWxX-SHxY
X =

4.581

10.00
-

2
a)-2 With Uplift
B = 10.00

=
211.650

B
e =

164.90

0.50

141.650 =

70.825

ton

0.5 )

70.825
=

2.02

>

2.00

OK !

35.092

c) Reaction of foundation soil


SW

6xe
x (1 +

q1,2 =
B
211.650
q1 =

)
B
6x

0.419

x (1 +
10.00
211.650

q2 =

) =

2
26.486 t/m

<

qa

2
48.667 t/m

OK !

) =

2
15.844 t/m

<

qa

2
48.667 t/m

OK !

10.00
6x

0.419

x (1 10.00

10.00

2
15.844 t/m

2
- t/m

26.486 t/m

in case, e > 0
(applicable)
Reaction of Foundation Soil in Case 2

108393437.xls.ms_office-9/4/2012

- t/m

in case, e < 0
(not applicable)

Stability9/30
2.3 Case 3 (Seismic condition)
1.00
0.50
0.00
9

10.00

11

qa1
7.50

0.50

Pa2
Pw1

10

Pa1

11.50

12

Pa3

2.00

qw1

qa3

Pp1

qu2
1.50

Pu2
1.00

Pu1

qa2

qu1
7.50

qp1

Acting Load in Case 3

(1) Vertical Load

= Same as Case 2

(2) Horizontal Load


f
b
q

30.00 o
a
=
0.000 o (for stability analysis)
o
0.00
a
=
5.711 o (for structural analysis)
2
0.00 t/m (for seismic condition)

=
=
=

=
10.204 o
(F = Arc tan(Kh) )
Kh
=
0.18

Coefficient of Active earth pressure


Cos2(f-F-a)

Kae =
CosF x Cos2a x Cos(a+d+F) x 1+

Sin(f+d) x Sin(f-b-F)
Cos(a+d+F) x Cos(a-b)

(for stability analysis)


a

0.000

tan d =

Sin f Sin ( F + D - b )
1 - Sin f Cos ( F + D - b )

sin D=

Sin ( F + b )
Sin f

Sin (F+ b ) ==

0.177

Sin D

=
Sin(F+D-b) =

0.354

tan d

0.450

Cos2(f-F-a)=
CosF

Cos2a

24.23

Sin f

0.500

D
=
Cos(F+D-b)=

20.73

0.885

Sin(f+d)

0.811

0.984

Sin(f-b-F)

0.339

1.000

Cos(a-b)

1.000

Cos(a+d+F) =

0.825

15.00

Kae =

0.438

then

0.514

0.858

(for stability analysis)

(for structural analysis)


a
=
Cos (f-F-a)=

5.711
0.941

d
Sin(f+d)

0.707

CosF

0.984

Sin(f-b-F)

0.339

=
Cos(a+d+F)=

0.990

Cos(a-b)

0.995

Cos2a

108393437.xls.ms_office-9/4/2012

0.858

6.50
Pw2

1.00

qw2

Stability10/30
Kae =

0.481

(for structural analysis)

Coefficient of Passive earth pressure


Cos2(f-F+a)

Kpe =
CosF x Cos2a x Cos(a+d-F) x 1-

a
=
Cos (f-F+a)=
CosF
=
Cos2a
=
Cos(a+d-F)=
2

Kpe =

0.000
0.885
0.984
1.000
0.970

Sin(f-d) x Sin(f+b-F)
Cos(a+d-F) x Cos(a-b)

d
=
Sin(f-d)
=
Sin(f+b-F) =
Cos(a-b)
=

24.23
0.101
0.339
1.000

1.406

qa1 = Kae x ( h1 - hw1) x gsoil


qa2 = qa2
qa3 = Kae x hw1 x (gsat - gw)
qw 1 = hw1 x gw

=
=
=

3.154 ton/m
3.154 ton/m
3.285 ton/m

7.500 ton/m

qw 2 = hw2 x gw
qp1 = Kp x h4 x (gsat - gw)

=
=

6.500 ton/m
2.812 ton/m

No.
1
2
3
4
5
6
7
8
Pw1
Pw2
Pa1
pa2
Pa3
Pp1
Total

0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.50
0.50
0.50
3.15
0.50
-2.812

x
x
x
x
x
x
x
x
x
x
x
x
x
x

Description
18.00
5.40
2.40
4.50
0.60
12.00
12.00
0.00
7.50
x
7.50
-6.50 x
6.50
3.15
x
4.00
7.50
3.285 x
7.50
2.00
x
0.50

H
3.240
0.972
0.432
0.810
0.108
2.160
2.160
0.000
28.125
-21.125
6.307
23.652
12.319
-2.812
56.348

Y
0.500
0.750
0.500
1.167
1.167
4.833
6.500
4.833
2.500
2.167
8.833
3.750
2.500
2.000

HxY
1.62
0.73
0.22
0.95
0.13
10.44
14.04
0.00
70.31
-45.77
55.71
88.70
30.80
-5.62
222.24

(3) Stability Calculation


a) Stability against overturning
a)-1 Without Uplift
B = 10.00 m
SWxX-SHxY
X =

1,134.48 -

SW
X

4.310

0.690

222.24
=

3.910

1.090

< B/3

3.333

OK !

< B/3

3.333

OK !

m
776.15
=

SW

141.650

B
e =

SWxX-SHxY
X =

4.310

10.00
-

2
a)-2 With Uplift
B = 10.00

=
211.650

B
e =

222.24

10.00
-

108393437.xls.ms_office-9/4/2012

3.910

Stability11/30
b) Stability against sliding
b)-1 Without Uplift
SH
Sliding force :

56.348 ton

HR = m x S W

Resistance :

(friction coefficient : m =
HR
Fs =

SH
b)-2 With Uplift
Sliding force :

1.88

>

0.50

211.650 =

105.825 ton

1.25

OK !

56.348
SH

56.348 ton

HR = m x S W

(friction coefficient : m =
HR
SH

105.825
=

Resistance :

Fs =

0.50

0.50

1.26

>

0.50

141.650 =

70.825

ton

70.825
=

1.25

OK !

56.348

c) Reaction of foundation soil


c-1) in case, |e| < B/6
SW

(applicable)
6xe

x (1 +

q1,2 =
B
211.650
q1 =

)
B
6x

0.690

x (1 +
10.00
211.650

q2 =

) = 29.927

t/m2

<

qae

= 73.000

t/m2

OK !

) = 12.403

t/m2

<

qae

= 73.000

t/m2

OK !

qae

t/m2

10.00
6x

0.690

x (1 10.00

c-2) in case, B/6 < |e| < B/3

10.00
(not applicable)

2xSW
q1' =
=
3 x (B/2-|e|)

t/m2

2
12.403 t/m
2
29.927 t/m

in case, e > 0 and e < B/6


(applicable)

2
- t/m

in case, e > 0 and B/6 < e < B/3


(not applicable)

2
- t/m
2
- t/m

2
- t/m

in case, e < 0 and |e| < B/6


(not applicable)

in case, e < 0 and B/6 < |e| < B/3


(not applicable)

Reaction of Foundation Soil in Case 3

108393437.xls.ms_office-9/4/2012

Stability12/30
2.4 Bearing Capacity of soil
(1) Design Data
fB

30.00

10.00

cB

0.00

t/m2

gs '

1.00

t/m3 (=gsat-gw)

2.00

1.00

m (unit length)

(2) Ultimate Bearing Capacity of soil, (qu)


Calculation of ultimate bearing capacity will be obtained by applying the following
Terzaghi's formula :
qu

= (a x c x Nc) + (gsoil' x z x Nq) + (b x gsoil x B x Ng)


Shape factor (Table 2.5 of KP-06)
a

1.00

Shape of footing :

=
1

0.50
(strip)
a
1.00
1.30
1.11
(= 1.09 + 0.21 B/L)
(= 1.09 + 0.21 L/B)
1.30

Shape of footing
1 strip
2 square
3 rectangular, B x L
(B < L)
(B > L)
4 circular, diameter = B

b
0.50
0.40
0.40

0.30

Bearing capacity factor (Figure 2.3 of KP-06, by Capper)


Nc

36.0

Nq

Nc
0
5
10
15
20
25
30
35
37
39 >

qu

23.0
Nq
0.0
1.4
2.7
4.5
7.5
13.0
23.0
44.0
50.0
50.0

5.7
7.0
9.0
12.0
17.0
24.0
36.0
57.0
70.0
82.0

(a x c x Nc)

0.000

(gsoil x z x Nq)

46.000

(b x gsoil x B x Ng)

100.000

Ng

20.0

Ng
0.0
0.0
0.2
2.3
4.7
9.5
20.0
41.0
55.0
73.0

2
146.000 t/m

(3) Allowable Bearing Capacity of soil, (qa)


qa
qae

=
=

108393437.xls.ms_office-9/4/2012

qu / 3
qu / 2

2
48.667 t/m

73.000 t/m

(safety factor = 3 , normal condition)


(safety factor = 2 , seismic condition)

Structure13/30

3. Structure Calculation
3.1 Normal Condition
(1) Wall

1.00
q =

0.50

t/m2

0.50
0.00

qa1
Pa1
10.00

Pa2
A

0.9

qa2
6.00

Pw1

Pw2

Pa4
Pa3

0.50

qw1

1.00

qa4

5.00

qw2

qa3

1.00
7.50

1.50

1.00

Load Diagram on Wall in Normal Condition


Ka =

Kha

0.341
a
=
5.711 o
d
=
20.00 o
cos (a+d) =
0.901
= Ka x cos (a+d)
=

0.307

a) Section A - A
h = 4.00
m
qa1 = Kha x q
qa2 = Kha x h x gsoil
No.
Pa1
Pa2
Total

0.153 x
2.210 x

0.153 ton/m

2.210 ton/m

Description
4.00
4.00
x
0.50

Sa =

Ha
0.614
4.420
5.034

5.034

ton

6.00

Ma =

Y (from A-A)
2.000
1.333

7.122

Ha x Y
1.228
5.894
7.122

ton m

b) Section B - B
hw1 =
h = 4.00
m
qa1 = Kha x q
qa2 = Kha x h x gsoil
qa3 = qa1 + qa2
qa4 = Kha x hw2 x (gsat - gw)
qw1 = hw1 x gw
qw2 = hw2 x gw
No.
Pa1
Pa2
Pa3
Pa4
Pw1
Pw2
Total

0.153
2.210
2.364
1.842
6.000
-5.000

x
x
x
x
x
x

Description
4.00
4.00
x
0.50
6.00
6.00
x
0.50
6.00
x
0.50
5.00
x
0.50

Sb =

108393437.xls.ms_office-9/4/2012

30.242

hw2 =

5.00 m

0.153 ton/m

=
=
=

2.210 ton/m
2.364 ton/m
1.842 ton/m

=
=

6.000 ton/m
5.000 ton/m
Hb
0.614
4.420
14.182
5.525
18.000
-12.500
30.242

ton

Mb =

Y (from B-B)
8.000
7.333
3.000
2.000
2.000
1.667

106.090

Ha x Y
4.911
32.416
42.546
11.051
36.000
(20.833)
106.090

ton m

Structure14/30
(2) Footing
Case 1 (with vertical live load)
q =

Case 2 (without vertical live load)

t/m2

0.50

q =

4.00

t/m2

0.50

4.00

6.00

6.00

0.50

0.50

1.00

1.00

3
D
7.50

C
1.50

7.50

1.00

1.50

1.00

5
4

4
3

in case, e > 0

in case, e > 0
6

6
2

10.260

2
16.460 t/m

24.925

2
15.844 t/m
2

24.155 t/m
2
25.694 t/m

23.826 t/m
2
25.422 t/m
2
26.720 t/m

2
26.486 t/m

in case, e < 0

in case, e < 0
2

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

Load Diagram on Footing in Normal Case


a) Section C - C
Case 1 (with vertical live load)
No.
Description
1
1.000 x
1.00
x
2.40
0.500 x
1.00
x
2.40
2
-25.694 x
1.00
-1.026 x
1.00
x
0.50
Total
Case 2 (without vertical live load)
No.
Description
1
1.000 x
1.00
x
2.40
0.500 x
1.00
x
2.40
2
-25.422 x
1.00
-1.064 x
1.00
x
0.50
Total
Case 1
Case 2

108393437.xls.ms_office-9/4/2012

Sc
Sc

= -23.207 ton
= -22.954 ton

0.50

0.50

Hc
2.400
0.600
-25.694
-0.513
-23.207

X (from C-C)
0.500
0.333
0.500
0.667

Hc x X
1.200
0.200
-12.847
-0.342
-11.789

Hc
2.400
0.600
-25.422
-0.532
-22.954

X (from C-C)
0.500
0.333
0.500
0.667

Hc x X
1.200
0.200
-12.711
-0.355
-11.666

Mc
Mc

=
=

-11.789
-11.666

ton m
ton m

Structure15/30
b) Section D - D
Case 1 (with vertical live load)
No.
Description
3
1.000 x
7.50
x
2.40
0.500 x
7.50
x
2.40
4
4.000 x
7.50
x
1.80
6.000 x
7.50
x
2.00
0.500 x
7.50
x
2.00
5
0.500 x
7.50
6
-16.460 x
7.50
-7.695 x
7.50
x
0.50
Total
Case 2 (without vertical live load)
No.
Description
3
1.000 x
7.50
x
2.40
0.500 x
7.50
x
2.40
4
4.000 x
7.50
x
1.80
6.000 x
7.50
x
2.00
0.500 x
7.50
x
2.00
6
-15.844 x
7.50
-7.982 x
7.50
x
0.50
Total
Case 1
case 2

Sd
Sd

=
=

0.50

0.50

0.50

0.50

Hd
18.000
4.500
54.000
90.000
3.750
3.750
-123.450
-28.856
21.694

X (from D-D)
3.750
2.500
3.750
3.750
5.000
3.750
3.750
2.500

Hd x Y
67.500
11.250
202.500
337.500
18.750
14.063
-462.938
-72.141
116.484

Hd
18.000
4.500
54.000
90.000
3.750
-118.830
-29.931
21.489

X (from D-D)
3.750
2.500
3.750
3.750
5.000
3.750
2.500

Hd x Y
67.500
11.250
202.500
337.500
18.750
-445.613
-74.827
117.061

21.694 ton
21.489 ton

Md
Md

=
=

116.484
117.061

ton m
ton m

3.2 Seismic Condition


(1) Wall

1.00
0.50
0.00

Pa1

10.00

10.50

qa1
6.00

Pw1

0.50
1.00

Pa2

Pa3

qw1

5.00

Pw2

qa3

qw2

qa2

1.00
7.50

1.50

1.00

Load diagram on Wall for Seismic case


Kae =

Khea

0.481
a
=
5.711 o
d
=
15.00 o
cos (a+d) =
0.935
= Kae x cos (a+d)
=

0.450

Kh =

0.18

a) Section A - A
h =
4.00 m
qa1 = Khae x h x gsoil
No.
1
0.500 x
2
4.000 x
3
0.500 x
Pa1
3.239 x
Total

=
Description
4.000
x 0.400
0.500
x 2.400
4.000
x 0.000
4.000
x 0.500

Sae =
b) Section B - B

108393437.xls.ms_office-9/4/2012

7.688

x
x
x

ton

2.400
0.180
2.400

3.239 t/m

0.180

0.180

Mae =

Hae
0.346
0.864
0.000
6.479
7.688
10.827

Y (from A-A) Hae x Y


1.333
0.461
2.000
1.728
1.333
0.000
1.333
8.638
10.827
ton m

Structure16/30

hw1 =
h =
4.00 m
qa1 = Khae x h x gsoil
qa2 = qa1
qa3 = Khae x hw1 x ( gsat - gw)

hw2 =

6.00 m

qw1 = hw1 x gw
qw2 = hw2 x gw
No.
Pa1
Pa2
Pa3
Pw1
Pw2
1
2
3
Total

3.463
3.463
2.699
6.000
-5.000
0.500
10.000
0.500

x
x
x
x
x
x
x
x

Description
4.00
x
0.50
6.00
6.00
x
0.50
6.00
x
0.50
5.00
x
0.50
10.00 x
1.00
0.50
x
2.40
10.00 x
0.00

Sbe

x
x
x

2.40
0.18
2.40

5.00 m

=
=
=

3.463 t/m
3.463 t/m
2.699 t/m

=
=

6.000 ton/m
5.000 ton/m

0.18

0.18

45.624 ton

Mbe

Hbe
6.926
20.779
8.098
18.000
-12.500
2.160
2.160
0.000
45.624
=

162.495

Y (from B-B) Hbe x Y


7.333
50.794
3.000
62.338
2.000
16.197
2.000
36.000
1.667
-20.833
3.333
7.200
5.000
10.800
3.333
0.000
162.495
ton m

(2) Footing
in case, e < B/6

in case, B/6 < e < B/3

4.00

4.00

6.00

6.00

0.50

0.50

1.00

1.00

3
D
7.50

C
1.50

3
D

1.00

7.50

C
1.00

1.50

in case, e > 0 ande < B/6

in case, e > 0 and B/6 < e < B/3


6

2
2
12.403 t/m

2
- t/m
2
25.546 t/m
2
28.175 t/m

2
- t/m
2
29.927 t/m

2
- t/m

in case, e < 0 and B/6 < |e| < B/3

in case, e < 0 and |e| < B/6


2

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

Load Diagram on Footing in Seismic Case

108393437.xls.ms_office-9/4/2012

2
- t/m

Structure17/30
a) Section C - C
No.
1
2

1.000
0.500
-28.175
-1.752

x
x
x
x

Description
1.00
x
2.40
1.00
x
2.40
1.00
1.00
x
0.50

0.50

Total
Sce

= -26.051 ton

Mce

Hce
2.400
0.600
-28.175
-0.876
-26.051

X (from C-C)
0.500
0.333
0.500
0.667

Hce x X
1.200
0.200
-14.087
-0.584
-13.271

= -13.271 ton m

b) Section D - D
No.
3
4
5

1.000
0.500
10.000
0.500
-12.403
-13.143

x
x
x
x
x
x

Sde

Description
7.50
x
2.40
7.50
x
2.40
7.50
x
1.92
7.50
x
2.00
7.50
7.50
x
0.50

0.50

0.50

Total
27.941 ton

Mde

Hde
18.000
4.500
144.000
3.750
-93.023
-49.286
27.941

X (from D-D)
3.750
2.500
3.750
5.000
3.750
2.500

Hde x X
67.500
11.250
540.000
18.750
-348.834
-123.216
165.450

= 165.450 ton m

3.3 Design Bending Moment and Shear Force


(1) Bending moment and shear force in each case
Description

Section
Section
Section
Section

A-A
B-B
C-C
D-D

Bending Moment
Normal
Seismic
Case 1
Case 2
Case 3
7.122
7.122
10.827
106.090
106.090
162.495
11.789
11.666
13.271
116.484
117.061
165.450

Shear Force
Normal
Case 1
Case 2
5.034
5.034
30.242
30.242
23.207
22.954
21.694
21.489

(2) Design bending moment and shear force


Description
Section
Section
Section
Section
Notes:

Bending Moment
Shear Force
Normal
Seismic
Normal
Seismic
A-A
7.122
10.827
5.034
7.688
B-B
106.090
162.495
30.242
45.624
C-C
11.789
13.271
23.207
26.051
D-D
106.090
162.495
21.694
27.941
- Moment at Section C-C < Moment at Section B-B
- Moment at Section D-D < Moment at Section B-B

108393437.xls.ms_office-9/4/2012

Seismic
Case 3
7.688
45.624
26.051
27.941

Structure (2)18/30

3. Structure Calculation
3.1 Normal Condition
(1) Wall

1.00
q =

0.50

t/m2

0.50
0.00

qa1
Pa1
10.00

Pa2
A

0.9

qa2
6.00

Pw1

Pw2

Pa4
Pa3

0.50

qw1

1.00

qa4

5.00

qw2

qa3

1.00
7.50

1.50

1.00

Load Diagram on Wall in Normal Condition


Ka =

Kha

0.341
a
=
5.711 o
d
=
20.00 o
cos (a+d) =
0.901
= Ka x cos (a+d)
=

0.307

a) Section A - A
h = 4.00
m
qa1 = Kha x q
qa2 = Kha x h x gsoil
No.
Pa1
Pa2
Total

0.153 x
2.210 x

0.153 ton/m

2.210 ton/m

Description
4.00
4.00
x
0.50

Sa =

Ha
0.614
4.420
5.034

5.034

ton

6.00

Ma =

Y (from A-A)
2.000
1.333

7.122

Ha x Y
1.228
5.894
7.122

ton m

b) Section B - B
hw1 =
h = 4.00
m
qa1 = Kha x q
qa2 = Kha x h x gsoil
qa3 = qa1 + qa2
qa4 = Kha x hw2 x (gsat - gw)
qw1 = hw1 x gw
qw2 = hw2 x gw
No.
Pa1
Pa2
Pa3
Pa4
Pw1
Pw2
Total

0.153
2.210
2.364
1.842
6.000
-5.000

x
x
x
x
x
x

Description
4.00
4.00
x
0.50
6.00
6.00
x
0.50
6.00
x
0.50
5.00
x
0.50

Sb =

108393437.xls.ms_office-9/4/2012

30.242

hw2 =

5.00 m

0.153 ton/m

=
=
=

2.210 ton/m
2.364 ton/m
1.842 ton/m

=
=

6.000 ton/m
5.000 ton/m
Hb
0.614
4.420
14.182
5.525
18.000
-12.500
30.242

ton

Mb =

Y (from B-B)
8.000
7.333
3.000
2.000
2.000
1.667

106.090

Ha x Y
4.911
32.416
42.546
11.051
36.000
(20.833)
106.090

ton m

Structure (2)19/30
(2) Footing
Case 1 (with vertical live load)
q =

Case 2 (without vertical live load)

t/m2

0.50

q =

4.00

t/m2

0.50

4.00

6.00

0.50

6.00

1.00

1.00

3
E

D
7.50

C
1

3
E

C
1.50

0.50

7.50

1.00

1.50

1.00

5
4

4
3

in case, e > 0

in case, e > 0
6

6
2

10.260

2
16.460 t/m

24.925

2
15.844 t/m
2

24.155 t/m
2
25.694 t/m

20.308

23.826 t/m
2
25.422 t/m

19.835
2
26.720 t/m

2
26.486 t/m

in case, e < 0

in case, e < 0
2

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

Load Diagram on Footing in Normal Case


a) Section C - C
Case 1 (with vertical live load)
No.
Description
1
1.000 x
1.00
x
2.40
0.500 x
1.00
x
2.40
2
-25.694 x
1.00
-1.026 x
1.00
x
0.50
Total
Case 2 (without vertical live load)
No.
Description
1
1.000 x
1.00
x
2.40
0.500 x
1.00
x
2.40
2
-25.422 x
1.00
-1.064 x
1.00
x
0.50
Total
Case 1
Case 2

108393437.xls.ms_office-9/4/2012

Sc
Sc

= -23.207 ton
= -22.954 ton

0.50

0.50

Hc
2.400
0.600
-25.694
-0.513
-23.207

X (from C-C)
0.500
0.333
0.500
0.667

Hc x X
1.200
0.200
-12.847
-0.342
-11.789

Hc
2.400
0.600
-25.422
-0.532
-22.954

X (from C-C)
0.500
0.333
0.500
0.667

Hc x X
1.200
0.200
-12.711
-0.355
-11.666

Mc
Mc

=
=

-11.789
-11.666

ton m
ton m

Structure (2)20/30
c) Section E - E
Case 1 (with vertical live load)
No.
Description
3
1.000 x
3.75
x
2.40
0.500 x
3.75
x
2.40
4
4.000 x
3.75
x
1.80
6.000 x
3.75
x
2.00
0.500 x
3.75
x
2.00
5
0.500 x
3.75
6
-16.460 x
3.75
-3.848 x
3.75
x
0.50
Total
Case 2 (without vertical live load)
No.
Description
3
1.000 x
3.75
x
2.40
0.500 x
3.75
x
2.40
4
4.000 x
3.75
x
1.80
6.000 x
3.75
x
2.00
0.500 x
3.75
x
2.00
6
-15.844 x
3.75
-3.991 x
3.75
x
0.50
Total
Case 1
Case 2

Sd
Sd

=
=

0.50

0.50

0.50

0.50

18.061 ton
18.227 ton

Hd
9.000
2.250
27.000
45.000
1.875
1.875
-61.725
-7.214
18.061

X (from D-D)
1.875
1.250
1.875
1.875
2.500
1.875
1.875
1.250

Hd x Y
16.875
2.813
50.625
84.375
4.688
3.516
-115.734
-9.018
38.139

Hd
9.000
2.250
27.000
45.000
1.875
-59.415
-7.483
18.227

X (from D-D)
1.875
1.250
1.875
1.875
2.500
1.875
1.250

Hd x Y
16.875
2.813
50.625
84.375
4.688
-111.403
-9.353
38.619

Md
Md

=
=

38.139
38.619

ton m
ton m

3.2 Seismic Condition


(1) Wall

1.00
0.50
0.00

Pa1

10.00

10.50

qa1
6.00

Pw1

0.50
1.00

Pa2

Pa3

qw1

5.00

Pw2

qa3

qw2

qa2

1.00
7.50

1.50

1.00

Load diagram on Wall for Seismic case


Kae =

Khea

0.481
a
=
5.711 o
d
=
15.00 o
cos (a+d) =
0.935
= Kae x cos (a+d)
=

0.450

Kh =

0.18

a) Section A - A
h =
4.00 m
qa1 = Khae x h x gsoil
No.
1
0.500 x
2
4.000 x
3
0.500 x
Pa1
3.239 x
Total

=
Description
4.000
x 0.400
0.500
x 2.400
4.000
x 0.000
4.000
x 0.500

Sae =
b) Section B - B

108393437.xls.ms_office-9/4/2012

7.688

x
x
x

ton

2.400
0.180
2.400

3.239 t/m

0.180

0.180

Mae =

Hae
0.346
0.864
0.000
6.479
7.688
10.827

Y (from A-A) Hae x Y


1.333
0.461
2.000
1.728
1.333
0.000
1.333
8.638
10.827
ton m

Structure (2)21/30

hw1 =
h =
4.00 m
qa1 = Khae x h x gsoil
qa2 = qa1
qa3 = Khae x hw1 x ( gsat - gw)

hw2 =

6.00 m

qw1 = hw1 x gw
qw2 = hw2 x gw
No.
Pa1
Pa2
Pa3
Pw1
Pw2
1
2
3
Total

3.463
3.463
2.699
6.000
-5.000
0.500
10.000
0.500

x
x
x
x
x
x
x
x

Description
4.00
x
0.50
6.00
6.00
x
0.50
6.00
x
0.50
5.00
x
0.50
10.00 x
1.00
0.50
x
2.40
10.00 x
0.00

Sbe

x
x
x

2.40
0.18
2.40

5.00 m

=
=
=

3.463 t/m
3.463 t/m
2.699 t/m

=
=

6.000 ton/m
5.000 ton/m

0.18

0.18

45.624 ton

Mbe

Hbe
6.926
20.779
8.098
18.000
-12.500
2.160
2.160
0.000
45.624
=

162.495

Y (from B-B) Hbe x Y


7.333
50.794
3.000
62.338
2.000
16.197
2.000
36.000
1.667
-20.833
3.333
7.200
5.000
10.800
3.333
0.000
162.495
ton m

(2) Footing
in case, e < B/6

in case, B/6 < e < B/3

4.00

4.00

6.00

6.00

0.50

0.50

1.00

1.00

3
D
7.50

C
1.50

3
D

1.00

7.50

C
1.00

1.50

in case, e > 0 ande < B/6

in case, e > 0 and B/6 < e < B/3


6

2
2
12.403 t/m

18.975

2
- t/m
2
25.546 t/m
2
28.175 t/m

2
- t/m
2
29.927 t/m

2
- t/m

in case, e < 0 and B/6 < |e| < B/3

in case, e < 0 and |e| < B/6


2

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

2
- t/m

Load Diagram on Footing in Seismic Case

108393437.xls.ms_office-9/4/2012

2
- t/m

Structure (2)22/30
a) Section C - C
No.
1
2

1.000
0.500
-28.175
-1.752

x
x
x
x

Description
1.00
x
2.40
1.00
x
2.40
1.00
1.00
x
0.50

Hce
2.400
0.600
-28.175
-0.876
-26.051

0.50

Total
Sce

= -26.051 ton

Mce

X (from C-C)
0.500
0.333
0.500
0.667

Hce x X
1.200
0.200
-14.087
-0.584
-13.271

= -13.271 ton m

b) Section E - E
No.
3
4
5

1.000
0.500
10.000
0.500
-12.403
-6.572

x
x
x
x
x
x

Sde

Description
3.75
x
2.40
3.75
x
2.40
3.75
x
1.92
3.75
x
2.00
3.75
3.75
x
0.50

0.50

0.50

Hde
9.000
2.250
72.000
1.875
-46.511
-12.322
26.292

Total
26.292 ton

Mde

X (from D-D)
1.875
1.250
1.875
2.500
1.875
1.250

Hde x X
16.875
2.813
135.000
4.688
-87.209
-15.402
56.764

56.764 ton m

3.3 Design Bending Moment and Shear Force


(1) Bending moment and shear force in each case
Description

Section
Section
Section
Section

A-A
B-B
C-C
E-E

Bending Moment
Normal
Seismic
Case 1
Case 2
Case 3
7.122
7.122
10.827
106.090
106.090
162.495
11.789
11.666
13.271
38.139
38.619
56.764

Shear Force
Normal
Case 1
Case 2
5.034
5.034
30.242
30.242
23.207
22.954
18.061
18.227

(2) Design bending moment and shear force


Description
Section
Section
Section
Section
Notes:

Bending Moment
Shear Force
Normal
Seismic
Normal
Seismic
A-A
7.122
10.827
5.034
7.688
B-B
106.090
162.495
30.242
45.624
C-C
11.789
13.271
23.207
26.051
E-E
38.619
56.764
18.227
26.292
- Moment at Section C-C < Moment at Section B-B
- Moment at Section D-D < Moment at Section B-B

108393437.xls.ms_office-9/4/2012

Seismic
Case 3
7.688
45.624
26.051
26.292

Re-bar 23/30

Reinforcement Bar Arrangement and Stress


Normal Condition
Name of Structure
Location

:
:

D1 - Hulu
0

Bending moment
Shearing force (joint)
Axial force

M
S
N

kgfcm
kgf
kgf

Height of member
Covering depth
Effective height
Effective width
Young's modulus ratio

h
d'
d
b
n

cm
cm
cm
cm
-

Asreq

cm2

Required R-bar
R-bar arrangement
Reinforcement
Perimeter of R-bar

As
U

cm2

cm

Compressive stress
Allowable stress

sc
sca

kgf/cm2
kgf/cm2

Tensile stress
Allowable stress

ss
ssa

kgf/cm2
kgf/cm2

Shearing stress at joint


Allowable stress

t
ta

kgf/cm2
kgf/cm2

Dist. from neutral axis

As

cm2

Minimum requirement of distribution bar

108393437.xls.ms_office-9/4/2012

90.0
7.0
83.0
100.0
24

Wall (lower)
Section B-B
back
front
10,609,021
30,242
0
150.0
7.0
143.0
100.0
24

5.18

Footing (toe)
Section C-C
lower
upper
1,178,900
23,207
0
150.0
7.0
143.0
100.0
24

45.09

Footing (heel)
Section D-D
lower
upper
10,609,021
21,694
0
150.0
7.0
143.0
100.0
24

4.69

45.09

25~200

16~250

25~100

16~125

16~250

16~250

25~100

16~250

24.54
39.27

8.04
ok

49.09
78.54

16.08
ok

8.04
20.11

8.04
ok

49.09
78.54

8.04
ok

25.93

47.45

21.64

47.45

7.4
60.0

35.2
60.0

8.0
60.0

35.2
60.0

390
1,850
ok
0.61
5.50
ok

ok
1,699
1,850
ok
2.11
5.50
ok

ok
1,080
1,850
ok
1.62
5.50
ok

ok
1,699
1,850
ok
1.52
5.50
ok

ok

Resisting Moment
Mr
kgfcm
Mr for compression
Mrc
kgfcm
x for Mrc
cm
ss for Mrc
kgf/cm2
Mr for tensile
Mrs
kgfcm
x for Mrs
cm
sc for Mrs
kgf/cm2
Distribution bar (>As/6 and >Asmin)
Reinforcement

Wall (upper)
Section A-A
back
front
712,163
5,034
0

3,350,296
3,350,296
21
2,598
3,620,083
27
62
4.09
16~250
8.04
ok

1.34
16~250
8.04
ok

As min =

13,748,467
14,771,164
44
2,693
13,748,467
55
59
8.18
16~125
16.08
ok

4.50

2.68
16~250
8.04
ok

cm2

1,565,235
4,568,003
17
6,427
1,565,235
19
20
1.34
16~200
10.05
ok

1.34
16~200
10.05
ok

13,738,413
14,733,743
44
2,690
13,738,413
55
59
8.18
16~200
10.05
ok

1.34
16~200
10.05
ok

Re-bar 24/30

Reinforcement Bar Arrangement and Stress


Seismic Condition
Name of Structure
Location

:
:

D1 - Hulu
0

Bending moment
Shearing force (joint)
Axial force

M
S
N

kgfcm
kgf
kgf

Height of member
Covering depth
Effective height
Effective width
Young's modulus ratio

h
d'
d
b
n

cm
cm
cm
cm
-

Asreq

cm2

Required R-bar
R-bar arrangement
Reinforcement
Perimeter of R-bar

As
U

cm2

cm

Compressive stress
Allowable stress

sc
sca

kgf/cm2
kgf/cm2

Tensile stress
Allowable stress

ss
ssa

kgf/cm2
kgf/cm2

Shearing stress at joint


Allowable stress

t
ta

kgf/cm2
kgf/cm2

Mr
Mrc

kgfcm
kgfcm
cm
kgf/cm2
kgfcm
cm
kgf/cm2

Dist. from neutral axis

Resisting Moment
Mr for compression
x for Mrc
ss for Mrc
Mr for tensile
x for Mrs
sc for Mrs

Mrs

90.0
7.0
83.0
100.0
16

Wall (lower)
Section B-B
back
front
16,249,484
45,624
0
150.0
7.0
143.0
100.0
16

5.15

Footing (toe)
Section C-C
lower
upper
1,327,143
26,051
0
150.0
7.0
143.0
100.0
16

45.18

Footing (heel)
Section D-D
upper
lower
16,249,484
27,941
0
150.0
7.0
143.0
100.0
16

3.49

45.18

25~200

16~250

25~100

16~125

16~250

16~250

25~100

16~250

24.54
39.27

8.04

49.09
78.54

16.08

8.04
20.11

8.04

49.09
78.54

8.04

21.91

40.19

17.94

40.19

13.1
90.0

62.4
90.0

10.8
90.0

62.4
90.0

583
2,775
ok
0.93
8.25
ok

ok
2,554
2,775
ok
3.19
8.25
ok

ok
1,204
2,775
ok
1.82
8.25
ok

ok
2,554
2,775
ok
1.95
8.25
ok

ok

Distribution bar (>As/6 and >Asmin)


Reinforcement
As
cm2

108393437.xls.ms_office-9/4/2012

Wall (upper)
Section A-A
back
front
1,082,719
7,688
0

4,067,715
4,067,715
18
3,231
4,934,281
21
102
16~250
8.04

17,311,334
17,311,334
36
3,304
18,933,061
43
99
16~250
8.04

16~125
16.08

2,188,388
5,253,008
14
7,766
2,188,388
15
36
16~250
8.04

16~200
10.05

17,279,913
17,279,913
36
3,302
18,920,938
43
99
16~200
10.05

16~200
10.05

16~200
10.05

Re-bar 25/30

Data of Reinforcement Bar


f
Sectional Perimeter Arrangement
Area
(mm) (cm2)
(cm)
12
1.131
3.770 12@125
12@150
12@250
12@300
16
2.011
5.027 16@125
16@150
16@250
16@300
19
2.835
5.969 19@125
19@150
19@250
19@300
22
3.801
6.912 22@125
22@150
22@250
22@300
25
4.909
7.854 25@75
25@150
25@250
25@300
32
8.042
10.053 32~125
32@150
32@250
32@300
12@250 + 16@250
12,16@125
12,19@125
12,22@125
12,25@125
12,32@125
16,19@125
16,22@125
16,25@125
16,32@125
19,22@125
19,25@125
19,32@125
22,25@125
22,32@125
25,32@125
12@300 + 16@300
12,16@150
12,19@150
12,22@150
12,25@150
12,32@150
16,19@150
16,22@150
16,25@150
16,32@150

108393437.xls.ms_office-9/4/2012

Area
(cm2)
9.05
7.54
4.52
3.77
16.08
13.40
8.04
6.70
22.68
18.90
11.34
9.45
30.41
25.34
15.21
12.67
49.09
32.72
19.63
16.36
64.34
53.62
32.17
26.81
12.56
15.86
19.73
24.15
36.69
19.38
23.25
27.67
40.21
26.55
30.97
43.51
34.84
47.38
51.80
10.47
13.22
16.44
20.13
30.58
16.15
19.37
23.06
33.51

Perimeter
(cm)
30.16
25.13
15.08
12.57
40.21
33.51
20.11
16.76
47.75
39.79
23.88
19.90
55.29
46.08
27.65
23.04
78.54
52.36
31.42
26.18
80.42
67.02
40.21
33.51
35.19
38.96
42.73
46.50
55.29
43.99
47.76
51.53
60.32
51.53
55.30
64.09
59.07
67.86
71.63
29.33
32.47
35.61
38.75
46.08
36.66
39.80
42.94
50.27

Footing (heel)
Section E-E
lower
upper
3,861,855
18,227
0
125.0
7.0
118.0
100.0
24
19.44
25~200

16~250

24.54
39.27

8.04
ok

31.86
Calculation Check
12.56
35.19
15.86
38.96
19.73
42.73
24.15
46.50
36.69
55.29
19.38
43.99
23.25
47.76
27.67
51.53
40.21
60.32
26.55
51.53
30.97
55.30
43.51
64.09
34.84
59.07
47.38
67.86
51.80
71.63
10.47
29.33
13.22
32.47
16.44
35.61
20.13
38.75
30.58
46.08
16.15
36.66
19.37
39.80
23.06
42.94
33.51
50.27

22.6
60.0
ok
1,465
1,850
ok
1.54
5.50
ok
3,623,270
3623270.48
22
2673.99317
4,289,501
27
59
4.09
16~200
10.05
ok

1.34
16~300
6.70
ok

Re-bar 26/30

19,22@150
19,25@150
19,32@150
22,25@150
22,32@150
25,32@150

22.12
25.81
36.26
29.03
39.48
43.17

42.94
46.08
53.41
49.22
56.55
59.69

22.12
25.81
36.26
29.03
39.48
43.17

42.94
46.08
53.41
49.22
56.55
59.69
Footing (heel)
Section E-E
upper
lower
5,676,445
26,292
0
125.0
7.0
118.0
100.0
16
18.75
25~200

16~250

24.54
39.27

8.04

26.77
38.9
90.0
ok
2,120
2,775
ok
2.23
8.25
ok
4,706,450
4,706,450
19
3,405
5,815,251
22
95
16~200
10.05

108393437.xls.ms_office-9/4/2012

16~300
6.70

Reinforcement Bar Arrangement


(
D1 - Hulu
)

1.00 0.50 0.00

+ 79.00

D25~200
4.00

D16~250
D16~250

11.50

D16~250
A

D25~100

7.50

D16~125
D16~250

D16~125
D16~200
D25~100

D
B

D16~200
D16~250
B

+ 69.50
0.50
1.00
+ 67.50

D16~250
D16~200

7.50

C
D16~250

1.50

D16~200

1.00

10.00

Section of Retaining wall


#
#
cost estimate

108393437.xls.ms_office-9/4/2012

=
=
=

#REF! m3
#REF! kg
#REF!

4. Wooden Pile

(Not applicable for this Project)

4.1 Bearing Capacity of a Pile


(1) Design data
Diameter of wooden pile
Length of pile
Area of pile section
Perimeter of pile
SPT N-Value

D
L
A
W

=
15.0 cm
=
2.00 m
2
= 1/4 x p x D
= pxD
=
30

Ni : Average N value in a soil layer


fi : friction of soil
= 0.20 x Ni

=
=

=
=

2
0.018 m
0.471 m

30
2
6.00 t/m

(2) Ultimate vertical bearing capacity, (qu)


qu = (40 x N x A) + (W x fi x li)
= ( 40
x
30.0 x
0.018 )+( 0.471 x
6.00 x
= 21.206 + 5.655
= 26.861 ton/pile

2.0 )

(3) Ultimate vertical bearing capacity, (qu)


qa = qu/n

= 26.861 / 3

8.954

ton/pile

(safety factor : n = 3)
4.2 Allowable horizontal bearing capacity
Horizontal bearing capacity depend on displacement of a pile
(1) Design data
Class of timber (pile)
: III Class
2
kg/cm
E = 80,000
(Young's modulus)
d = Allowable horizontal displacement
N = SPT N-value is assumed as

=
=

0.01 m
30

p x D4
4
= 2,485.0 cm

I =

(I : Moment of Inertia for a pile)

64
(2) Horizontal bearing capacity of one pile (Ha)
a = 0.20
-3/4
Kh = a x E x D
= 0.20 x(
4

Kh x D

b =

E =
28

28

30.0 )x(
22.041

N
-3/4

15.0 )

x 15.0

=
4 EI

=
4 x

Kh x D
b

80,000 x
22.041 x

x d

Ha =

22.041 kg/cm

0.025 cm

2,485.0
15.0
x

= 13,020.22 kg

0.025
=

13.020 ton

(3) Allowable horizontal bearing capacity due to the stress of a pile itself
Ha = 2 x b x Ma
s = Allowable stress of timber III class

2
75.00 kg/cm

p x D3
3
= 331.34 cm

W =

; (W : section modulus of a pile)

32
Ma =

Ha = 2 x b x Ma
=
2
x

W
0.025

75.00 x

331.34 = 24,850.5 kg cm

x 24,850.5 = 1,262.06 kg/pile

1.262 ton/pile

Allowable horizontal bearing capacity acting on the pile top depend upon the allowable
stress of pile itself.
4.3 Spacing of Pile
(1) For horizontal load
Ha =

1.262 ton/pile

Hr = H - Hf

; (Ha : Horizontal load carried by pile)

= H - V x tan(2f/3)
Ha

Spacing of pile

=
=

56.348 - 78.581 = -22.233 ton/m

1.262
=

Hr
Spacing of pile

=
=

-0.06

-22.233

-0.06 m (center to center) by horizontal force

(2) For vertical load


V = 215.900 ton/m
qa =

8.954 ton/pile

: Vertical load carried by pile


: Allowable vertical bearing capacity of a pile

qa
Spacing of pile

8.954
=

0.04

215.900

Spacing of pile can be determined 0.75 m for a pile ( f 150, L

2.00

Vp = ####### ton/m

: Vertical load carried by pile

qa =

: Allowable vertical bearing capacity of a pile

8.954 ton/pile
qa

Spacing of pile

8.954
=

Vp

m ),

-0.05

-177.334

Spacing of pile can be determined 1.50 m for a pile ( f 150, L

2.00

m ),

12th Oct,

Stability Analysis
Uplift pressure are added for stability analysis.
Reinforcement Bar Arrangement
Reinforcement bar for Footing (heel) are collected.

Jan. 7, '03 Stability


Calculation formula in case of (B/6 < e < B/3) under seismic condition are corrected.
(distributed width of reaction of foundation soil)