GTC/371A/2010 QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S1,S2 AND S6

CHECKLIST FOR PLASTERING Date : SRUCTURE: Drawing no: Description of Checks


1. 2. 3. 4. 5 6 7 Plastering 'Materials as per approval MEP Clearance for plastering taken Mortar Machine available with spares & connected to water supply Level pads, plaster accessories fixed before start of plastering Fill the joint gaps (if any) of block works Apply specified key coat to concrete surfaces Corner beads, expanded mesh fixed as necessary at joint between concrete and masonry and corners / edges Plastering finish, evenness, alignment checked Right angle at wall /floor corners, openings checked Curing arrangement for plastering work done

RFI Ref No: Location no:

Yes

Acceptance No NA

Remarks

8 9 10

Checked by ( L&T)

Witnessed by ( Cust. Rep)