CUADRO DE CARACTERISTICAS Y CONEXIONES DE SUMIDEROS

CARRERA xxxx
DE
SUMIDERO

A
POZO

A
A
A
A
A

2A
2B
6
8
10

SUMIDERO
TIPO
TV
ESP
TV
TV
TV

3m
T1
3m
3m
3m

AREA
ha
0.25
0.07
0.14
0.15
0.03

INTEN.
lps/Ha
137.8
137.8
137.8
137.8
137.8

CAUDAL
lps
31.01
8.68
17.37
18.61
3.72

RASANTE
SUMIDERO
POZO
msnm
msnm
2711.73
2711.11
2715.34
2716.43
2747.06
2745.58
2754.06
2753.58
2758.62
2758.79

LONG.

DIAM.

PEND.

m
3.93
21.26
8.29
1.80
2.27

m
0.40
0.30
0.40
0.40
0.40

%
9.5
0.3
13.1
5
2

15.56

743.91

CLAVE
SALIDA LLEGADA
msnm
msnm
2710.68
2710.31
2714.73
2714.67
2745.26
2744.17
2753.06
2752.97
2758.02
2757.97
2742.50
43.62

C. CLAVE
S. POZO
msnm
2710.01
2714.62
2742.40
2752.94
2757.93
749.35
749.06

PEND. RECUBRIMIENTO
VIA
ENTRADA SALIDA
%
m
m
9.83
1.05
0.80
9.83
0.61
1.76
15.05
1.80
1.41
7.10
1.00
0.61
7.10
0.60
0.82

EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA - ESP


SISTEMA PLUVIAL COLECTOR : Carrera xxxxxx
NODO REPRESENTATIVO

990.667 E

997.360 N

I = C1 * (d + X0)^

TR

C1

X0

C2

3.00

2443.30

24.50

-1.06

5.00

2857.40

23.00

-1.07

10.00

3547.10

22.30

-1.08

C2

PAG1

DISEO:

Nov-11
Area

Tr

T. Concentra

Intens

Ha

Aos

Incr

Total

L/H/S

0.06

0.68

15.00

137.82

0.17

0.30

15.00

137.82

De

2B

2A

2A

De

2B

2A

258.4

2A

29.4

Q0

Caida
Tramo

Cota Clave
Super
Infer

3.66

4.50

2714.62 2710.12

0.93

0.15

V0

0.45

0.30

Q Dis

Long

Pend

Diam

lt/s

m,"

0.90

7.4

54.31

8.28

0.30

0.90

21.0

15.84

0.93

0.20

Coefic

Caida
Pozo
2709.67

14.64

Cota Rasante
Super
Infer

Recubrimiento
Super
Infer

Vr

m/s

mts

0.03

1.33

0.71

0.89

Energia
Espec.

Q/Q0

0.03

2.56

0.03

0.14

0.80

0.13

V2/2g
mts

Yc
mts

Hw

Hc

2716.43

2711.11

1.81

0.99

0.13

0.09

0.06

0.10

0.09

2711.11

2710.10

2710.66

2709.80

0.18

0.04

0.12

0.22

0.18

EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA - ESP


DISEO Y REVISION DE CIMENTACION DE TUBERIAS CONDICION ZANJA
Tipo de Relleno a utilizar:
Arcilla plastica(saturada)
Arcilla ordinaria(seca)
Suelo nat. saturado(limo)
Mez. arenas gravas(recebo)
Mat. granular sin cohesion
Turba-Tierra vegetal
Greda-marga arcilla pobre

Tipo de relleno
Pozo
De
2B

2A

Diam
Nom
(mm)

A
2A

300

200

Bd
(m)

0.78

0.65

1
2
3
4
5
6
7
4 Camion
De
(m)

0.38

0.25

Altura
Rell
(m)

Tipo de Tuberia

Tipo de Zanja

Gres
Concreto simple

1
2
3

Concreto reforzado

Talud Vertical
Talud 1:5

Colector: Carrera xxxx


1 Localidad:Ciudad Bolivar
A
2lcaldia:
Fecha:

7500 kg.|| Ku'=

0.165 Peso unitario


Tipo de zanja

1950 kg/m3
1

Cd

Cs

FS

Wd
(kg/ml)

Wv
Wt
(kg/ml) (kg/ml)

CR o CF
(kg/ml)

Nov-11
PAG2
1.00 m.

Long. tubo

FCc

FCr

Tuberia
Clase

Material

1.81

1.63

1907.0

0.05

382.4

2289.4

1.50

2650

1.30

1.5

1.40

1.36

1593.8

0.08

612.1

2205.9

1.50

2650

1.25

1.5

0.99

1.04

1220.8

0.15

1109.3

2330.1

1.50

2650

1.32

1.5

2710.66

3.03

2496.6

0.00

0.0

2496.6

1.50

2243

1.67

1.9

2710.23

3.03

2496.6

0.00

0.0

2496.6

1.50

2243

1.67

1.9

2709.80

3.03

2496.6

0.00

0.0

2496.6

1.50

2243

1.67

1.9

NOTA: Se recomienda utilizar un factor de Carga de 1.9.

EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA - ESP


Colector:

Carrera xxxx

CUADRO CALCULO DE VOLUMENES

PAG3
Nov-11

Aguas Lluvias
Pozo
De
A

Long
(m)

2B

2A

2A

De

2B

2A

2A

Diam
Pulg

De

Diam
Nom

Di

Bd

F.C

Cota Terreno
Sup
Inf

Cota Clave
Sup
Inf

Recubrim
Sup
Inf

H med
EXC. 1

54.31 12.0

0.37

0.30

300

0.77

1.5

2716.43

2711.11

2714.62

2710.12

1.81

0.99

1.75

15.84

0.24

0.20

200

0.64

1.9

2711.11

2710.10

0.45

0.30

2710.66

2709.80

2710.46

V rell
Atraq

Vexc.

8.0

H med Diam Ext Pozo


Lreal
EXC. 2 Sup
Inf

Vexc
Pozo

Vexc
Tub

V rell
Base

Vrell 1

Vrell
Volumen V exc
V conc.
Recub
Tubera bajo caj

1.75

1.7

1.7

52.79611

4.4

87.4

4.2

2.0

91.9

6.2

80.1

5.5

70.8

2710.46

1.7

1.7

14.14071

6152.7

24679.5

0.9

0.8

30832.2

1.7

30829.8

0.7

24677.0

Cantidades de obra
Volumen de excavacin Total
Volumen de material para cimentacin de tubera
Volumen de recebo para cubrir tubera
Volumen de concreto
Volumen de sobrantes
Volumen de Sub-base
Volumen de Base
Volumen de Rotura y reconstruccin de pavimento

De

Diam
(" , m)

Long
real

Clase

Material

2B

2A

0.3

53.3

2A

0.2

14.6

30924.1
7.9
30870.3

30924.1
24.8
14.9

long
inclinada
54.50

15.84

V Rell
T5
12.1287
2.73131

14.86

EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA - ESP


SISTEMA PLUVIAL COLECTOR : Carrera xxxxx
NODO REPRESENTATIVO

990.667 E

997.360 N

I = C1 * (d + X0)^

TR

C1

X0

C2

3.00

2443.30

24.50

-1.06

5.00

2857.40

23.00

-1.07

10.00

3547.10

22.30

-1.08

C2

PAG1

DISEO:
De

Nov-11
Area

Tr

T. Concentra

Intens

Ha

Aos

Incr

Total

L/H/S

Coefic

Q Dis

Long

Pend

Diam

lt/s

m,"

Q/Q0

Vr

m/s

mts

6A

0.32

0.29

15.00

137.82

0.90

39.7

54.68

23.00

0.30

0.09

3.15

0.07

4.64

0.05

6A

6B

0.47

0.14

15.00

137.82

0.90

58.3

28.98

22.60

0.30

0.14

3.51

0.08

4.55

0.06

6B

5B

0.47

0.14

15.00

137.82

0.90

58.3

26.53

16.10

0.30

0.16

3.12

0.09

3.82

0.07

0.14

0.07

15.00

137.82

0.90

17.4

0.40

0.02

1.94

0.04

3.41

0.03

De

Q0

V0

Caida
Tramo

Cota Clave
Super
Infer

Caida
Pozo

8.29

Cota Rasante
Super
Infer

13.10

Recubrimiento
Super
Infer

Energia
Espec.

V /2g
mts

Yc
mts

Hw

Hc

6A

430.6

6.09

12.58

2742.50 2729.92

2745.58

2730.88

3.08

0.96

0.57

0.50

0.15

0.26

0.21

6A

6B

426.9

6.04

6.55

2729.22 2722.67

0.70

2730.88

2723.39

1.66

0.72

0.71

0.63

0.19

0.33

0.27

6B

5B

360.3

5.10

4.27

2722.19 2717.92

0.48

2723.39

2719.33

1.20

1.41

0.59

0.50

0.19

0.33

0.27

699.9

5.57

1.09

2745.26 2744.17

2747.06

2745.58

1.80

1.41

0.23

0.19

0.09

0.15

0.12

EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA - ESP


DISEO Y REVISION DE CIMENTACION DE TUBERIAS CONDICION ZANJA
Tipo de Relleno a utilizar:
Arcilla plastica(saturada)
Arcilla ordinaria(seca)
Suelo nat. saturado(limo)
Mez. arenas gravas(recebo)
Mat. granular sin cohesion
Turba-Tierra vegetal
Greda-marga arcilla pobre

Tipo de relleno
Pozo
De

Diam
Nom
(mm)

6 6A

6A

6B

300

6B

300

5B

300

400

Bd
(m)
0.78

0.78

0.78

0.90

1
2
3
4
5
6
7
4 Camion
De
(m)
0.38

0.38

0.38

0.50

Altura
Rell
(m)

Tipo de Tuberia

Tipo de Zanja

Gres
Concreto simple

Colector:
Talud Vertical 1 Localidad:Ciudad Bolivar
Talud 1:5
2 Alcaldia:
Fecha:

1
2
3

Concreto reforzado

7500 kg.|| Ku'=

0.165 Peso unitario


Tipo de zanja

1950 kg/m3
1

Cd

Cs

FS

Wd
(kg/ml)

Wv
Wt
(kg/ml) (kg/ml)

CR o CF
(kg/ml)

Nov-11

PAG2
1.00 m.

Long. tubo

FCc

FCr

Tuberia
Clase

Material

3.08

2.21

2592.9

0.02

138.1

2731.0

1.50

2650

1.55

1.9

2.02

1.75

2047.5

0.04

311.1

2358.6

1.50

2650

1.34

1.5

0.96

1.02

1190.9

0.16

1166.1

2356.9

1.50

2650

1.33

1.5

1.66

1.54

1798.7

0.06

449.0

2247.8

1.50

2650

1.27

1.5

1.19

1.20

1410.9

0.11

814.6

2225.4

1.50

2650

1.26

1.5

0.72

0.80

937.1

0.24

1986.7

2923.8

1.50

2650

1.66

1.9

1.20

1.21

1420.0

0.11

802.9

2222.8

1.50

2650

1.26

1.5

1.30

1.29

1513.1

0.09

693.5

2206.6

1.50

2650

1.25

1.5

1.41

1.37

1602.1

0.08

604.4

2206.4

1.50

2650

1.25

1.5

1.80

1.46

2312.5

0.07

511.7

2824.3

1.50

3059

1.38

1.5

1.60

1.35

2129.2

0.08

631.7

2760.9

1.50

3059

1.35

1.5

1.41

1.22

1932.2

0.11

797.2

2729.4

1.50

3059

1.34

1.5

NOTA: Se recomienda utilizar un factor de Carga de 1.9.

EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA - ESP


Colector:

CUADRO CALCULO DE VOLUMENES

PAG3
Nov-11

Aguas Lluvias
Pozo
De
A

Long
(m)

Diam
Pulg

De

Diam
Nom

Di

Bd

Cota Terreno
Sup
Inf

F.C

Cota Clave
Sup
Inf

Recubrim
Sup
Inf

H med
EXC. 1

long
inclinada

6A

54.68 12.0

0.37

0.30

300

0.77

1.9

2745.58

2730.88

2742.50

2729.92

3.08

0.96

2.37

56.11

6A

6B

28.98 12.0

0.37

0.30

300

0.77

1.9

2730.88

2723.39

2729.22

2722.67

1.66

0.72

1.54

6B

5B

26.53 12.0

0.37

0.30

300

0.77

1.5

2723.39

2719.33

2722.19

2717.92

1.20

1.41

1.66

8.29 16.0

0.49

0.41

400

0.89

1.5

2747.06

2745.58

2745.26

2744.17

1.80

1.41

2.07

6A

2.37

1.7

1.7

54.40846

5.9

115.9

4.4

5.2

121.8

9.6

106.5

5.7

98.8

6A

6B

1.54

1.7

1.7

28.01099

4.0

41.9

2.2

2.7

45.8

4.9

38.0

2.9

33.0

6B

5B

1.66

1.7

1.7

25.17143

4.2

39.8

2.0

0.9

44.1

2.9

38.5

2.6

31.9

2.07

1.7

1.7

6.661352

5.2

15.5

0.6

0.3

20.7

0.9

18.5

1.2

12.3

29.71
26.87
8.36
V Rell
T5
12.499
6.435
5.783
1.774

232.4

26.49

De

H med Diam Ext Pozo


Lreal
EXC. 2 Sup
Inf

Vexc
Pozo

Vexc
Tub

V rell
Base

V rell
Atraq

Vexc.

Vrell 1

Vrell
Recub

Volumen V exc
V conc.
Tubera bajo caj

Cantidades de obra
Volumen de excavacin Total
Volumen de material para cimentacin de tubera
Volumen de recebo para cubrir tubera
Volumen de concreto
Volumen de sobrantes
Volumen de Sub-base
Volumen de Base
Volumen de Rotura y reconstruccin de pavimento

De
6

Diam
(" , m)

Long
real

Clase

Material

6A

0.3

54.9

6A

6B

0.3

28.5

6B

5B

0.3

25.7

0.4

7.2

18.4
143.4

232.4
31.6
26.5