Preparing Analysis Reports Ensure that the design is developed such that the design can be constructed, ins

talled or integrated into existing facilities and operated according to the spec ifications. Responsibilities: General. Perform design and sizing calculation notes Development of PFDs and P&IDs Line and Process Equipment sizing Ensure that inputs to documents are properly verified against source Process Design Basis Process and Utilities system design Participate in Hazard and Operability Analysis and Operational Safety Review (HA ZOP) Open and closed Drain systems Provide input to and attend project completion reviews. Perform Flare System Analysis with Flarenet (Design, Rating and Debottlenecking ) Perform Slug formation study with Pipesim Design and Rating of Heat Exchangers with HTRI Present Position: PROJECTS: AS-BUILT OF THE EXISTING ELP II PIPELINE (ON GOING) (NGC), 2012 Responsibility: Site visit Markup of the existing drawing Development of PFD and P&ID CONCEPTUAL STUDY FOR GAS BOOSTING ON ELP II PIPELINE (ON GOING) (NGC), 2012 Responsibility: Preliminary Equipment sizing Development of PFD,UFD and pipeline schematic Hydraulics with Pipesim Line Sizing UGHELLI WEST SLUG VOLUME VERIFICATION, (2011) SCOPE: Performing Hydraulic study and slug volume calculation on a 10 pipeline tha t will transfer gas at 3barg across 6km pipe length that is expected to arrive a t a minimum pressure of 2.5barg. Responsibility: Process Simulation with Pipesim Slug Volume Calculation Report Pipeline Hydraulic Report Line sizing Report INSTALLATION OF ADDITIONAL HEAT EXCHANGER (CHEVRON), (2011) Responsibility: P & ID Review, Markup, and Cadding Rating of the Heat Exchanger with HTRI DOVER ENGINEERING LIMITED (2007) Process Engineer

CHANGING OF CARBON STEEL DRAIN PIPE TO GLASS REINFORCED EPOXY (GRE) PIPE Responsibility: Line size verification report SPDC AS-BUILT CAMPAIGN PROJECT ONGOING, (2010) 1. 2. 3. 4. Site visit / Markup of the existing drawing (PEFS, PFS, UFS, PSFS & UEFS) Development of as-built drawing for Afiesere Flow station Afiesere Compression station. Eriemu Flow station Cawthorne channels (1,2 & 3)

INSTALLATION OF PROCESS VESSEL DRAIN DOWN SYSTEM (SNEPCO), (2010) Responsibilities: P & ID Review and Markup Line List Valve List NLNG CONDENSATE STABILIZATION DE-BOTTLENECKING PROJECT. (CSU) (2010) Responsibilities: Control Valve sizing verification. Water cooler sizing calculation note Process Description CAPACITY FOR THE INSTALLATION OF NEW IDU SEPARATOR (PONTICELLI) (2010) Responsibility: Vessel Capacity Check Control Valve Size Verification PSV Sizing TEPNL NORTH OPTION PIPELINE PROJECT (TOTAL PETROLEUM NIGERIA LTD) ONGOING,(2010) SCOPE: Performing Front End Engineering design (FEED) of a pipeline that will tr ansport stranded gas from TEPNG and NAOC operations for distribution in the East ern Domestic Gas network. The north option will connect Rumuji with Imo River fa cilities according to NNPC requirements. Responsibility: P and ID markup OML 100 (FIRE WATER SYSTEM UPGRADE) 2009 2010:

SCOPE: Identification and performing all Basic Engineering and Design Activi ties necessary for the upgrade of the FIRE WATER & DELUGE SYSTEM. 1. ODP1 & ODD1: Design a Fire Water (FW) loop to ensure fully redundant FW supply on both platfo rms; Design deluge system to ensure fully redundant protection of all deluge equipmen t (including future equipment); Sizing verification of existing FW network/Deluge system, in order to determine opportunity for re-use; 2. ODP1: New Diesel FW Pump in replacement of existing. Sea Water (SW) cooling / Jockey pumps arrangement to be re-engineered as to cove r independently FW and SW cooling services. 3. ODD1: New Diesel FW pump to be engineered. New jockey pump to be engineered. Responsibility: Pump sizing ESCRAVOS RIVER CROSSING (ERC) 2009 - 2010 SCOPE: Detailed Engineering Design of a 400mmscfd Gas transmission pipeline. The Escravos River Crossing (ERC) Pipeline scope of work consists of installing additional pipeline capacity to deliver gas to the NGC gas grid across the river from the Escravos Gas Plant. The preliminary pipeline sizing targeted capacity to deliver 400 MMSCFD to take advantage of the DGS project and future excess pro cessing capacity. PSV and Line sizing.(API 14E,API 526,521, GPSA etc) Valve and Line list. Carry out preliminary and basic engineering studies/in-house design Preparation of data sheets, Understudy and Review of P&ID drawings for necessary modifications base on engin eering standards (ANSI, ASME, and API). Equipment sizing and Process simulation. . NGC/NNPC - ESCRAVOS LAGOS PIPELINE (ELP) (2008) ON GOING SCOPE (PHASE II): transmission Detailed Engineering Design of 1100 mmscfd Gas pipeline from OBEN node to Itoki node (36X 342Km) including 3 intermediate pigging sta tions and associated supporting facility. Detail scope: Performing lines, and PSV calculation notes. Development and review of P&IDs, PDFs, line list, valve list etc Preparation of various Datasheets for equipments and instrumentations e.g. press ure safety valve, I was among the team that Carried out corrosion studies on pipeline using Hydroc or 99 spread sheet. Design of pig launchers and pig receivers in accordance with. ASME B31.8 PSV, Equipment