Time bound clearances with in a period of 60 days by an Empowered Committee headed by the Chief Secretary. PSEB shall provide wheeling of power through its network with in the state at a uniform wheeling rate of 2% of the energy fed to the grid.
Small/Micro Hydro Power Projects PEDA (8 nos.) Private Developers (25 nos.) Biomass Cogeneration Power Projects Private Developers ( 20 nos.) Biomass Power Projects Private Developers (3 no.) Waste-to-energy power Projects PEDA (1 no.) Solar Power Projects PEDA (4 nos.) Private Developer Azure Power TOTAL (32 nos.)
9.8 MW 25.00 MW
218.65 MW
28.5 MW
1 MW
S.No. Name of Scheme 1 2 3 6 Mini Hydel Projects (Commissioned) Projects under Execution by Private Developers on BOO basis Self Identified Sites by Private Developers Potential identified under Master Plan on Tail Race of Existing Hydel Channel i.e. Mukerian Hydel Channel Total
105.75 MW
SOLAR PHOTOVOLTAIC POWER PROJECTS (MW Scale) ON BUILD, OWN & OPERATE BASIS
PROJECTS ALLOCATED TOTAL CAP. 19 MW. SPV Power Plant Cap. 2MW in Distt. Amritsar commissioned and Inaugurated on 15th Dec.2009. MOU signed with BPCL for development of a 1 MW SPV Power Plant at Lalru in Punjab- PPA SIGNED, planned to be commissioned by March2010 MOU signed with M/s. Enterprise Business Solutions Inc., USA for setting up of a 5MW SPV Power Plant in Punjab, PPA signed and planned to be commissioned by June2010.
First Solar PV Power Plant on BOO basis commissioned in the Country on 1st December ,2009, Cap. 2 MW, V. Awan, Amritsar, Punjab
Proposed Roadmap for the State of Punjab under the Solar Mission
Under the National solar Mission, the state of Punjab plans to setup and achieve the following generation levels from Solar Power Installations under the first phase (2010-2013) Based on RPO of 0.25%. S.No. 1 2 3 Application segment Solar Collectors Off grid solar applications Utility grid power, including roof top Target for Phase-I (2010-13) 0.469 Million Sq.Mtrs. 14 MW 67 MW
PEDA shall facilitate the signing of PPA with the NTPC Vidyut Vyopar Nigam Ltd. as enshrined under the Solar Mission or the Utility PSEB on project case to case basis. The tariff shall be applicable as per CERC guidelines. MNRE, GOI should consider providing the generation based incentives to projects getting inter-connected to 11 KV system in the state.
ROOF TOP SOLAR PV PROJECT FOR THE CITY OF SAS NAGAR MOHALI , PUNJAB
SAS Nagar is a planned city of the State of Punjab adjoining Chandigarh and population in 2006 was about 2 Lacs Distributed utility Solar PV grid connected Project With Proposed project capacity : 5 MWp Roof tops of houses proposed to be covered : 5000 Nos approx. Each roof top to have 1 KWp spv grid connect system Each House having a connected load of 5 -8 Kwp. Each project shall be Grid connected on 415V LT utility Grid Facility of Bidirectional Import export energy meters. Nett Energy Metering concept to be deployed. Solar energy generated from the roof top systems project should be given CERC tariff.