Energy can be differentiated as 1. Kinetic energy 2. Potential energy Kinetic Energy 1. Sound 2. Wind 3. Mechanical for example moving piston in a cylinder 4. Electrical energy. Electricity, lightning 5. Thermal Energy, Heat, hot water, steam 6. Light , microwaves, x-rays , solar, ultra violet rays Potential energy 1. Gravitational energy. Hydro power, ball above ground 2. Spring . stretched rubber band 3. Magnetic planetary poles 4. Nuclear , fission, fusion, heavy water uranium 5. Chemical , gasoline, batteries, oil natural gas, gun powder, coal, wood

THERMAL ENERGY Thermal Energy is the oldest type of energy. With all known history available, Wood was always used for heating and cooking. In 2nd world war fossil fuels entered in the form of coal to get the energy, until liquid fuels were discovered and because of their convenience of transportation they took over as major contributors of the energy source. Once the steam engines were invented then the coal or liquid fuel was burnt in the boilers and the heat produces steam which is used to drive electrical generators, or any other mechanical device. Rudolph diesels invention of diesel engine revolutionaries the energy concept and today we see sine the majority of machines moving on diesel engines. Diesel engines can be 2 stroke or 4 stroke type. They can be in line or arranged in V or even W shape. They can be single acting or double acting. Another method of converting thermal energy to mechanical energy is by the gas turbines. Turbines are also used to run by steam or hot gases which are produced by igniting fuel.
For converting thermal energy to electrical energy alternators are used to drive on constant RPM. The choice of gensets strictly depends on the requirement of the client, before ordering a power plant following points to be considered 1. Expected demand of the power. 2. Type of fuel required 3. Space available for the power plant 4. Avilability of genset 5. Avilability of local service back up and stock of parts 6. Price is paramount importance and hidden expenses should be looked carefully

The major manufacturers and suppliers of Gensets based on internal combustion engines are given below 1. MAN 2. Wartsila 3. Caterpillar 4. Jen Bacher 5. Waukesha 6. Mitsubishi 7. Detroit Diesel 8. Rolls Royce Internal combustion engine can obtain 30-50% thermal efficiency. It means that around 50% energy is wasted in the form of exhaust gases , cooling systems and radiation. Therefore for larger plants heat recovery systems are utilized. In Pakistan due to attractive gas prices this is a general trend that gas operated power plants are preferred if gas connections are available. The gas gensets are available from less than 1 MW sizes to 6 MW configuration. Normally they are V type and 12,16 18 and 20 cylinder configuration. In addition some models are available on duel fuel technology which can be operated simultaneously on gas and furnace oil. The price of a 3 MW gas genset can be expected around 1 Million $. However low RPM engines will be more costly Unit cost of fuel on gas genset can be evaluated as follows Fuel Cost Rs 2.7 (depends upon the genset ) Maintenance Rs 0.20 Lubricating Oil Rs.0.10 Chemical R Rs. 0.02 General stores Rs. 0.01 Labor Rs.0.10 Overhead +Insurance Rs.0.07 Financing 0.20 Total Rs. 3.40 The engines which are running the fuel cost is only variable and can be calculated by multiplying fuel cost by a factor of 225. (225 grams / KWHR is an average net fuel consumption expected.)

HYDEL ENERGY Water flowing in the rivers has kinetic energy. Once they are used to drive the turbine and produce electricity the power generated as Hydel Energy. Power produced by the turbines depends on quantity of water flowing/minute and the head of water available. Mostly river flows by melting glaciers on high mountains. Once the water start flowing in the valleys it changes its head very rapidly. This energy can be converted into electrical energy. Two method are normally used:1. Dams 2. Run of River projects.

In case of Dams the water flow is restricted by making a huge storage device and the head of water is increased, the water then is allowed to flow by means of gates and pass through the turbines, the head of reservoir level is maintained to provide uniform power, and the water stored in peak season additionally is used for irrigation purposes in dry seasons. In run of river projects the water is diverted through the tunnels and once it gains the head allowed to fall and pass through the turbines and back to river. the water in these projects is continuously flowing and not being stored. Geographical situation is paramount importance in choosing a suitable site for the hydro project and it evolves a very serious time and money consuming study. Once a site is located further detailed feasibility study is required before proceeding any serious effort to start the work. The feasibility study should include following field work. 1. Detailed Mapping of the area 2. Topographic study of the area 3. Seismic refraction study 4. River flow data 5. Weather data containing, Temperatures, pressures, rain humidity 6. Water sampling and testing 7. Environmental study 8. Social impact

9. Wild life and fish study 10. Identification of stake holders of the area 11. Coring and getting samples of the soil at 50-200 meters depth 12. Laboratory testing of the cores samples 13. Tectonic study to evaluate earth quake dangers WIND ENERGY Pakistan is facing acute shortage of energy. with 7% increase of its economy this short fall soon to slow down its economic growth and will shatter its dream to become one day a developed country. Most of its energy demand is being met with either Hydro power or thermal units. Pakistan is spending a very large amount of foreign exchange to purchase the furnace. The gas reserves already start depleting and oil markets are sky rocketing. To overcome this shortage Government take a initiative to investigate Alternate energy resources in Pakistan developed Alternate Energy Board AEDB. The Board is headed by Retd Air Marshal Shahid Hamid. identified 50,000 MW energy potential from wind resource Pakistan is blessed with a large resource of wind corridor. Although Pakistan meteorological Department was gathering wind data for quite long time But recently United States provided wind energy map for Pakistan which confirms a strong wind corridor in Sind coastal area. AEDB issued about 80 LOI to the investors List of LOI holders )to develop 50 MW wind farms. Out of which 15 are already issued the land and feasibility reports and financial closings are in progress. The following is a brief road map for developing a wind form 1. submission of proposal by sponsor 2. Review of proposal by AEDB 3. Posting of Bank Guarantee

4. issuance of letter of intent ( LOI ) 5. Feasibility study 6. Generation License 7. Tariff Determination 8. Submission of Performance Guarantee 9. Tariff determination by NEPRA 10. Submission of performance guarantee 11. Issuance of Letter of support The first requirement of conducting feasibility study is to install a wind mast. The three major manufacturers of wind data are listed below. This document explains the method for installing weather station. 1. www.wilmers.com 2. www.ammonit.de 3. www.environdata.com.au Geological, seismic, tectonic and environmental studies will be required along with Digital mapping and topography of the site for preparing a bankable feasibility study. A confirm EPC cost will also be needed for calculation of tariffs. Some large Denmark (27.9%) manufacturers of wind turbines are given below 1. 2. GE Wind, US (17.7%) 3. Enercon,Germany (13.2%) 4. Gamesa, Spain (12.9%) 5. Suzlon, India (6.1%) 6. Siemens, Denmark (5.5%) 7. Repower, Germany (3.1%) 8. Nordex, Germany (2.6%) 9. Ecotecnia, Spain (2.1%) 1 Mitsubishi, Japan (2.0%) WIND ENERGY BASICS Power developed by a wind turbine can be mathematically shown in following formulae 1/2xdensity of air x effective area of rotor blade x cube of speed of wind

The lay out and designing of the wind form can be done by wind energy planning and project software available in market in a reasonable price . One such software is Wind Pro which is a very convenient tool for project management. Environmental Protection agency require a detailed environmental impact study of the project. The following issues should be discussed detail 1. Birds collision or alteration of their migration routes 2. Noise impact 3. flickering