SM БГ2 [SM Oxidizer Tank 2] Refuel and Pumping out Nitrogen using Compressor K1 from Progress Refuel Tanks 361 БГ1, 2 GMT CREW ACTIVITY 06:00-06:10 Morning Inspection 06:10-06:40 Post-sleep 06:40-07:15 BREAKFAST 07:15-07:30 Daily Planning Conference (S-band) 07:30-07:45 BREAKFAST 07:45-09:15 FE-2 Physical Exercise (TVIS) 07:45-08:00 FE-1 Prep for Work 07:45-08:10 CDR Prep for Work DC1 ИДЭ-2 smoke detector needle cleaning (Skip ИДЭ-2 #2, 08:00-10:00 FE-1 cleaning device (ФГБ1ПГО_2_219_1, b/c 00037950R or 00037971R)) Return Master Clock Unit [БСВ-М] to initial configuration. Tagup with 08:10-10:00 CDR specialists (S-band) 09:15-10:15 FE-2 Physical Exercise (RED) 10:00-11:00 CDR Physical Exercise (VELO+RED), Day 4 10:00-12:30 FE-1 Stowing disposal hardware in Progress 360 and IMS update 10:15-10:45 Inspection of A/L emergency light power supply FE-2 10:45-11:15 Inspection of Lab emergency light power supply Video Distribution System (VDS) Video Tape Recorder (VTR) – tape 11:00-11:15 CDR changeout 11:15-13:30 Disposed hardware stowage in Progress 360 and IMS update 11:15-12:15 FE-2 Inspection of Node 1 Emergency Light Power Supply 12:15-12:25 FE-2 Installation of handrail fasteners in Node1 12:30-13:30 FE-1 Physical Exercise (RED) 13:30-14:30 . LUNCH 14:30-17:30 FE-2 Installation of Integrated Station LAN (ISL) components 14:30-16:00 FE-1 Stowing disposal hardware in Progress 360 and IMS update 14:30-15:30 15:30-15:45 Gas Analyzer deactivation in Soyuz 220 CDR 15:45-16:05 IMS update 16:05-16:45 СОЖ Maintenance 16:10-17:40 FE-1 Physical Exercise (CEVIS) 16:45-18:15 CDR Physical Exercise (TVIS), Day 4 Page 2 of 2
17:30-17:45 Placing cold packs into MELFI refrigerator
FE-2 17:45-18:00 Questionnaire - journal entry 17:50-18:00 CWC audit FE-1 18:00-18:45 Evening work prep CDR,FE- 18:15-18:50 Evening work prep 2 18:45-18:50 FE-1 Transfer TVIS/RED/CEVIS/HRM data to MEC 18:50-19:05 Daily Planning Conference (S-band) 19:05-19:30 Evening work prep 19:30-20:00 DINNER 20:00-20:30 Daily food prep 20:30-21:30 Pre-sleep 21:30-06:00 SLEEP GCF-JAXA. ТБУ temperature monitoring (in the morning) Task List FE-1 PLANTS-1. Payload status check (in the morning) Note: See OSTP for references to US activities. End of Radiogram