ACE/TECHNICAL/DIWS*

ARSEA CONSULTING ENGINEERS SDN BHD (333114-U) DESIGN INFORMATION WATER SUPPLY

Project: Client Type of Bu ild in g Descriptions


Design Guidelines For Water Supply

Date:

Design Engineer

No.
A.

Design Parameters

Remarks
- Malaysian Water Association (MWA) - Panduan Teknik Air JKR 92/87

B. B.1 B.2 C. C.1 C.2 D. D.1 D.2 D.3 E. E.1 E.2 E.3 F. F.1 F.2 F.3 G. G.1 G.2

Water Demand Scale of Development Total Water Demand Local Authority Scale of Development Total Water Demand Refer to Appendix `B Existing Pipeline Location Type of Pipe Size of Pipe (mm) Pressure Head Test Location Fee (Rm) Pressure Available (meter/bar) 1 litre = 0.264 gallon 1 m3 = 264 gallon

10m = 1 bar

Incoming Pipe
Location Normal Tapping Pipe Jacking Distribution Pipeline Peak flow (gallon per minute gpm) Fire flow (gallon per minute gpm) 2.5 x total water demand (gpm) Total water demand (gpm)+ fire risk (gpm) (refer Appendix `C)

G.3 G.3.1 G.3.2

Residual Head (meter) Peak Flow Fire Flow

A4.1

Rev 05

ACE/TECHNICAL/DIWS*

No.
G.4 G.4.1 G.4.2 G.4.3 G.4.4 G.5 G.5.1 G.5.2 G.5.3 G.6

Descriptions
Type of pipe Under Roads & Paved Area Marrine Area Incoming Others Pipe Coefficient M.S Pipe D.I Pipe HDPE Minimum Cover

Design Parameters
M.S Pipe/D.I Pipe D.I Pipe M.S/ D.I Pipe HDPE D.I Pipe D.I Pipe D.I Pipe

Remarks

G.5.1 110 G.5.2 110 G.5.3 - 130 - 1.2m for pipes buried at the side and under road - 0.9m for pipes buried in ground, away from roads Required Elevated Water Tank

H. H.1

Distribution System Residual Head (meter)

H.2 H.3 H.4 H.5 H.5.1 H.5.2 H.5.3 H.6 H.6.1 H.6.2 H.6.3 H.6.4 I. I.1 J. J.1 K. K.1 L.

Pumping System Running Hours (hours) Suction Tank (capacity from total water demand) Elevated water tank capacity from total water demand Suction Tank Type Size Capacity Elevated Water Tank Type Size Capacity Height of Elevated Structure Submission Submission level Contribution Constribution fees (RM) Approval Validity Approval Validity (years) Design Software CASIO Software for pipe network (loop) analysis Gallons/day

12 hours

Gallons/day Highest supply level + minimum residual head + losses

Determine by local Authority

2 years Hardys Cross Method

No.

Appendix A A4.2

Appendix B Rev 05

ACE/TECHNICAL/DIWS* Water Demand 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Low Cost Terrace House /Flat Single Storey Terrace / Low Medium & Medium Costs Flats Double Storey Terrace House/High Cost Flats Semi Detached House Bungalow / Condominiums Shophouse (Single Storey)/ Gerai Shophouse (Double Storey) Shophouse (Three Storey) Light Industrial Workshop Semi Detached / Bungalow Workshops Heavy Industry Medium Industry Light Industry Office / Complex / Commercial (Domestic Usage) Hotels (with dining and laundry facility Demestic Usage) Hotel (3 star) Hotel (5 star) Schools /Education Institutions -Day School / Institution - Fully Residential Hospitals (domestic usage) Mosque (domestic usage) Other place of worship Wet Market Petrol Kiosk = 1135 lpd (250 gpd) = 1360 lpd (300 gpd) = 1590 lpd (350 gpd) = 1820 lpd (400 gpd) = 2270 lpd (500gpd) = 2270 lpd (500 gpd) = 2730 lpd (600 gpd) = 4090 lpd (900 gpd) = 1590 lpd (350 gpd) = 2730 lpd (600 gpd) = 65,000 l/ha/day (6,000 gal/acre/day) = 50,000 l/ha/day (4,500 gal/acre/day) = 33,000 l/ha/day (3,000 gal/acre/day) = 1,200 lpd/100Sq.M (250gpd/1,000 sq.ft.) Johor Melaka Negeri Sembilan Selangor Perak Pulau Pinang Kedah Perlis Pahang Terengganu Kelantan Sabah Sarawak Local Authority - Syarikat Air Johor (SAJ) Holdings Sdn Bhd - Perbadanan Air Melaka - Jabatan Bekalan air negeri sembilan - Syarikat Bekalan Air Selangor Sdn Bhd - Lembaga Air Perak - Perbadanan Air Pulau Pinang - Jabatan Bekalan Air Negeri Kedah - Jabatan Bekalan Air Negeri Perlis - Jabatan Bekalan Air Negeri Pahang - Syarikat Air Terengganu - Syarikat Air Kelantan - Lembaga Air Sabah - Lembaga Air Sarawak

16.

17. 18. 19. 20. 21.

1,360 lpd/room (300 gpd /room) 2,000 lpd/room (440 gpd/room) 55 lpd / student (12 gpd / student) 360 lpd / student (80 gpd / student) 1,100 lpd / bed (240 gpd / bed) A4.3 Rev 05

ACE/TECHNICAL/DIWS* 135 lpd / person (12 gpd / person) 55 lpd / person ( 12 gpd / person) 820 lpd / store (180 gpd / store) 5000 lpd / service bay (1080gpd / service bay)

No. 22. 23.

Appendix A Water Demand Stadium 55 lpd / person ( 12 gpd / person ) Golf Course 5500 lpd / hole (1200 gpd / hole )

Appendix B Local Authority

Note:-

gpd lpd l/ha/day

= =

= Gallon per day Liter per day Liter/hectares/day

Appendix C FIRE RISK


Average Total Flow ( Litres ) ( Per Minute ) Class A Risk Large buildings, shopping complexes, high rise buildings, large industrial estate, warehouse and ports. Class B Risk Congested areas with buildings up to 5 storeys. Class C Risk Shophouse up to 3 storey, light industry Class D Risk Residential terrace house, detached, semi detached Class E Risk Others 680 180 1 1140 120-terrace 150-detached / semi detached 1 1370 90 1 2700 90 2 @ 1370 1 pm Spanning (Meters ) Maximum No. Of. Hydrant Outlets Used Simultaneously

4100

90

3@ 1370 1 pm

A4.4