You are on page 1of 20

exemple mtr gros-oeuvre

SHOT

AFFAIRE :
Repre

Niveau

S/SOL (Dallage)

Nb

1.00
1.00
1.00
1.00

RDC (PH SOUS-SOL)


1.00
1.00
1.00
1.00

R+1 (PH RDC)

1.00
1.00
1.00
1.00
1.00
1.00

Petite Long

Grd Long

Larg

Spcifique

S/Total

Totaux

Dont Logt

Dont balcons

Dont Ter

(ml)

(ml)

(ml)

(m ens)

(m)

(m)

(m)

(m)

(m)

22.60
6.20
8.70
5.50

27.90
13.50
8.70
10.20

15.60
15.50
7.65
15.50

22.60
6.20
8.70
5.50

22.60
6.20
8.70
5.50
5.50
2.40

27.90
13.50
8.70
10.20

27.90
13.50
8.70
10.20
6.60
5.00

15.60
15.50
7.65
15.50

15.60
15.50
7.65
15.50
1.70
1.70

393.90
152.68
66.56
121.68
393.90
152.68
66.56
121.68
-

734.81

734.81

393.90
152.68
66.56
121.68
10.29
6.29
-

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

(m)

exemple mtr gros-oeuvre

SHOT

AFFAIRE :
Repre

Niveau

Nb

Petite Long

Grd Long

Larg

Spcifique

S/Total

Totaux

Dont Logt

Dont balcons

Dont Ter

(ml)

(ml)

(ml)

(m ens)

(m)

(m)

(m)

(m)

(m)

R+2 (PH R+1)

1.00
1.00
1.00
1.00

22.60
6.20
8.70
5.50

27.90
13.50
8.70
10.20

15.60
15.50
7.65
15.50

393.90
152.68
66.56
121.68
-

751.38

709.76

41.62

734.81

709.77

25.04

350.30
TOITURE (PH R+2) (solution plancher SEAC Bois)
1.00
13.60
16.50
1.00
12.30
6.80
1.00
7.30
7.30
1.00
7.75
5.00

10.00
10.00
4.75
10.05

150.50
95.50
34.68
64.07
-

344.74

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

359.47

dont emprise logt

344.74

(m)

exemple mtr gros-oeuvre


AFFAIRE :

TERRASSEMENTS

Terrassements Gnraux

TN Point n 1 - PR1
TN Point n 2 - PR2
TN Point n 3 - PR3
TN Point n 4 - RG4
TN Point n 5 - RG5
TN Point n 6
TN Point n 7
TN Point n 8
TN Point n 9
TN Point n 10

9.66
9.58
9.56
9.57
9.58

Nb de point

5.00
Long

S.H.O.T. S/Sol
S.H.O.T. Rampe pk

735.00
13.05

Primtre S/Sol

119.60

Fouille en pleine masse


Remblai au pourtour construction

Niveau fini sous-sol


Ep. Dallage
Ep. Forme sous dallage
TN moyen
Niveau fond de forme
Hauteur terrassement
Angle talus en radian
Angle talus en degr
Cube talus

7.05
0.13
0.25
9.59
6.67
2.92
0.79
45.00
7.18

Rdc = 9.82

m/ml

Larg
1.00
5.00

735.00
65.25

m
m

119.60

ml

3 100.58

952.85

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

exemple mtr gros-oeuvre


AFFAIRE :
Couleur

Repre

Long

Larg

FONDATIONS

Ht

Semelles Filantes & Isoles


SF1e
SF1i
SF2
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10

125.20
26.20
4.30
1.05
1.20
0.85
0.85
0.75
1.00
0.90
0.80
0.50
1.00

0.50
0.50
0.80
1.40
1.55
1.20
1.40
1.30
1.90
2.70
1.50
0.90
0.45

Nb

a.s.

a.i.

a.s.t.

Surf S.
(m)

Ha
(kg/m)

Ts
(kg/m)

Bpe
(m)

GBton
(m)

Bton
(m)

Fouille
(m)

Ht Gb
(ml)

coffrage
(m)

ha
(kg)

ts
(kg)

0.00 = 7.05 (sous-sol)


0.20
0.20
0.20
0.30
0.30
0.25
0.25
0.25
0.30
0.25
0.25
0.20
0.25

1.00
1.00
1.00
8.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00

6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67

6.47
6.47
6.47
6.37
6.37
6.42
6.42
6.42
6.37
6.42
6.42
6.47
6.42

6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67

62.60
13.10
3.44
11.76
3.72
1.02
1.19
0.98
1.90
2.43
1.20
0.90
0.45
104.69

45.00
45.00
45.00
55.00
55.00
55.00
55.00
55.00
55.00
55.00
55.00
55.00
55.00

45.03
18.20
63.23

130.00
130.00

8.57
-

65.00

3.130
0.655
0.172
0.588
0.186
0.051
0.060
0.049
0.095
0.122
0.060
0.045
0.023
5.234

1.920

12.520
2.620
0.688
3.528
1.116
0.255
0.298
0.244
0.570
0.608
0.300
0.180
0.113
23.038

18.780
3.930
1.032
4.704
1.488
0.357
0.417
0.341
0.760
0.851
0.420
0.270
0.158
33.507

563
118
31
194
61
14
16
13
31
33
17
10
6
1 109

11.258
4.550
15.808

11.258
4.550
15.808

1 463
592
2 055

0.428
0.428

1.523
1.523

1.523
1.523

19.04
19.04

0.100
0.100

0.500
0.500

0.500
0.500

5.00
5.00

Semelles Filantes rampes et esc extrieurs


SF
SF

23.70
14.00

1.90
1.30

0.25
0.25

1.00
1.00
2.00

Bche retombe dalle porte faux PH SOUS-SOL


23.80
0.16
0.40
1.00

Bche dpart accs rampe sous-sol


5.00
0.20
0.50

1.00

2.00
-

50.00

2.252
0.910
3.162

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

99
99

25
25

exemple mtr gros-oeuvre

Couleur

AFFAIRE :
Repre
Trmies
Emp

Nbre

DALLAGES

Long

Larg

Epais.
Dallage

Epais.
Herisson

Epais.
Sable

ha

ts
(kg/m2)

Shot
(m2)

Surface relle
(m2)

Hrisson
(m3)

Sable
(m3)

Bton
(m3)

ha
(kg)

ts
(kg)

95.52
0.37
3.11
92.04

1 690
1 690

9.79
9.79

150
150

Surfaage
(m2)

Dallage SOUS-SOL
asc
ve

1
1
1

Dallage RAMPE ACCES S/SOL


1

Chasse Roue Rampe accs PK

734.80
1.80
23.92

1.00
1.60
1.00

0.13
0.13
0.13

2.30
2.30

734.80
734.80

13.05

5.00

0.15

2.30

65.25
65.25

26.10

734.80
2.88
23.92
708.00

65.25
65.25

ml

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

734.80
2.88
23.92
708.00

65.25
65.25

exemple mtr gros-oeuvre

AFFAIRE :
Couleur

Repre

POTEAUX

Type
poteaux

Poteaux SOUS-SOL
d
d
d
d
d
d
djd
d
d

Poteaux RDC
d
ds voile
d
d
d
d

Larg

Section
Long

0.25
0.25
0.20
0.25
0.25
0.25
0.25
0.25

0.60
0.65
0.65
0.82
0.45
0.81
0.60
0.57

0.20
0.20
0.20
0.20

0.25
0.40
0.35
0.45

Ht/Ml
Diam

2.40
2.40
2.40
2.35
2.40
2.40
2.40
2.40

2.22
2.50
2.50

Nb
(u)

3.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
2.00

Quant. Unitaire
(m3/ml)
(m2/ml)

0.150
0.163
0.130
0.205
0.113
0.203
0.150
0.143
-

0.050
0.080
0.070
0.090
-

1.70
1.80
1.70
2.14
1.40
2.12
1.70
1.64
-

0.90
1.20
1.10
1.30
-

ha
(kg/m3)

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00

Cof. droit
(m2)

Cof 15
(ml)

Cof 20
(ml)

Cof 30
(ml)

Cof 40
(ml)

Cof 50
(ml)

12.24
17.28
4.08
5.03
3.36
5.09
4.08
3.94
55.09

2.00
2.75
6.50
11.25

2.77
6.55
9.32

4.03
3.02
7.06

Cof. Circul.
(m2)

Bton
(m3)

1.08
1.56
0.31
0.48
0.27
0.49
0.36
0.34
4.89

0.11
0.18
0.45
0.74

0.18
0.45
0.63

0.30
0.20
0.50

ha
(kg)

Polystyrne
(m2)

108
156
31
48
27
49
36
34
489

Ragrage
(m2)

1.44

1.44

11
18
45
74

Poteaux R+1
d
d
d

0.20
0.20

0.35
0.45

2.52
2.52

Poteaux R+2 (en plus solution plancher Seac Bois en toiture)


d
0.20
0.60
2.52
d
0.20
0.40
2.52
d

1.00
2.00

1.00
1.00

0.070
0.090
-

0.120
0.080
-

1.10
1.30
-

1.60
1.20
-

100.00
100.00

100.00
100.00

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

18
45
63

30
20
50

exemple mtr gros-oeuvre

Couleur

C35/45
C30/37

AFFAIRE :
Repre
Type
poutres
Poutres SOUS-SOL
T
d
T
d
T
d
T
d
T
d
T
d
T
d
T
djd
T
d
T
d
T
d
T
d
T
d
T
d
T
d
T
d
d
d

POUTRES

Section

Larg

0.60
0.60
0.60
0.45
0.50
0.35
0.25
0.25
0.50
0.35
0.40
0.35
0.35
0.30
0.25
0.30

Ep pl.

Ht/Ml

0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23

24.50
47.90
7.20
7.90
5.20
5.20
7.20
5.60
4.50
8.80
4.40
4.40
7.90
3.70
4.70
5.50

Ht

0.65
0.65
0.65
0.65
0.65
0.55
0.65
0.65
0.65
0.55
0.55
0.50
0.60
0.50
0.40
0.45

Nb
(u)

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

Quant. Unitaire
(m3/ml)
(m2/ml)

0.162
0.162
0.162
0.122
0.135
0.060
0.068
0.068
0.210
0.112
0.128
0.095
0.130
0.081
0.043
0.066
-

1.14
1.14
1.14
0.99
1.04
0.69
0.79
0.79
1.34
0.99
1.04
0.89
1.09
0.84
0.59
0.74
-

ha
(kg/m3)

180.00
180.00
180.00
180.00
180.00
180.00
180.00
180.00
180.00
180.00
180.00
180.00
180.00
180.00
180.00
180.00

Cof. droit
(m2)

27.93
54.61
8.21
7.82
5.41
3.59
5.69
4.42
6.03
8.71
4.58
3.92
8.61
3.11
2.77
4.07
159.47

Cof. Courbe
(m2)

Poutres RDC
d

Bton
(m3)

3.97
7.76
1.17
0.96
0.70
0.31
0.49
0.38
0.95
0.99
0.56
0.42
1.02
0.30
0.20
0.36
20.53

ha
(kg)

Polystyrne JD
(m2)

1 720
3 363
505
416
304
180
211
164
263
305
174
139
299
100
85
134
8 360

8.80

dont bton C25/30

3.97

dont bton C35/45

7.76

dont bton C30/37

3.64

3.64

Ragrage
(m2)

27.93
54.61
8.21
7.82
5.41
3.59
5.69
4.42
6.03
8.71
4.58
3.92
8.61
3.11
2.77
4.07
159.47

Impact
(m2)

Linaire
(ml)

14.70
28.74
4.32
3.56
2.60
1.82
1.80
1.40
2.25
3.08
1.76
1.54
2.77
1.11
1.18
1.65

24.50
47.90
7.20
7.90
5.20
5.20
7.20
5.60
4.50
8.80
4.40
4.40
7.90
3.70
4.70
5.50

74.27

154.60

2.05

21.43
21.43

5.02

26.61
26.61

Poutres R+1
d

Poutres R+2
d
d

0.18

0.85

11.40

Poutres R+2 (en plus solution plancher Seac Bois eb toiture)


d
0.20
0.60
0.17
25.10
d

1.00

1.00

0.153
-

0.086
-

1.88
-

1.06
-

95.00

150.00

21.43
21.43

26.61
26.61

1.74
1.74

166
166

2.16
2.16

452
452

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

2.05

5.02

11.40
11.40

25.10
25.10

exemple mtr gros-oeuvre

Couleur

AFFAIRE :
Repre
Type
d/c/vpm
voile

# #
Ouv.
p/f

Nbre

Linaire

VOILES INTERIEURS

Ht

Epais.

ha

ts

Surface
(m2)

(kg/m2)

Voiles refends intrieurs SOUS-SOL


vi
1
15.40
vi
1
30.00
p
- 2
0.90
o
- 1
1.60

2.77
2.77
2.10
2.10

0.20
0.25
0.20
0.20

Aciers complmentaires incorpors


P
2
0.60
P
2
0.30
P
1
0.82
P
1
1.25
P
1
0.65
P
1
0.60
P
1
0.90
p
1
0.65
L
1
4.60
AV
3
1.00
CV
5
1.00

2.77
2.77
2.77
2.77
2.77
2.77
2.77
2.77
1.00
2.77
2.77

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
1.00
1.00
1.00

2.30
2.30
-

42.66
83.10
3.78
3.36
-

129.80
0.90
1.60

2.50
2.10
2.10

0.18
0.18
0.18

Aciers complmentaires incorpors


P
1
0.28
L
1
18.90
CV
12
1.00
AV
14
1.00

2.50
1.00
2.50
2.50

0.18
1.00
1.00
1.00

130.90
0.90
1.60

Aciers complmentaires incorpors


P
1
L
1
18.90
CV
12
1.00
AV
14
1.00

Voiles refends intrieurs R+2


vi
1

48.50

2.52
2.10
2.10

2.50
1.00
2.50
2.50

2.30
-

2.65

0.18

PV Cof. Courbe
(m2)

85.32
166.20

Cof. About V
(ml)

PV Prmur
(m2)

Polystyrne
(m2)

Bton
(m3)

27.70
-

8.53
20.78
0.76
0.67
-

ha
(kg)

ts
(kg)

98
191
-

324.50
24.57
3.36
-

251.52

649.00

27.70

30.00
-

27.88

564

289

58.41
4.42
0.60
-

746
-

53.38

13
66
150
70
299

746

59.38
4.42
0.60
-

759
-

54.35

66
150
70
286

759

23.13

296

100.00
3.50
5.00
2.00

0.18
0.18
0.18

1.00
1.00
1.00

PV Cof. Ght
(m2)

Ngatif
(u)

Pose Huis
(u)

Ragrage
(m2)

85.32
166.20
2
1

Emp. v
(m2)

3.08
7.50

Lin. voile
(ml)

15.40
30.00

2
-

251.52

10.58

45.40

649.00

23.36

129.80

649.00

23.36

129.80

659.74

23.56

130.90

659.74

23.56

130.90

257.05

8.73

48.50

83
42
57
87
45
42
62
45
16
17
69

296.57
Voiles refends intrieurs R+1
vi
1
p
- 13
o
- 1

PV Cof. Cages
(m2)

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
3.50
2.00
5.00

118.62

Voiles refends intrieurs RDC


vi
1
p
- 13
o
- 1

Coffrage
(m2)

2.30
-

329.87
24.57
3.36
-

649.00

30.00

659.74
-

100.00
3.50
5.00
2.00

2.30

301.94

659.74

128.53

257.05

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

13
1

13

14

13

13
1

13

14

13

exemple mtr gros-oeuvre

Couleur

AFFAIRE :
Repre
Type
d/c/vpm
voile

# #
Ouv. Nbre
p/f
p
- 5
o
- 1

VOILES INTERIEURS

Linaire

Ht

Epais.

ha

ts
(kg/m2)

0.90
1.60

2.10
2.10

0.18
0.18

Aciers complmentaires incorpors


P
1
L
1
8.50
CV
4
1.00
AV
4
1.00

2.50
1.00
2.65
2.65

1.00
1.00
1.00

Surface
(m2)
9.45
3.36
-

Coffrage
(m2)

PV Cof. Cages
(m2)

PV Cof. Ght
(m2)

PV Cof. Courbe
(m2)

Cof. About V
(ml)

PV Prmur
(m2)

Polystyrne
(m2)
-

Bton
(m3)
1.70
0.60
-

100.00
3.50
5.00
2.00

ha
(kg)
-

ts
(kg)
-

Ngatif
(u)
5
1

Pose Huis
(u)
5

Ragrage
(m2)

Emp. v
(m2)

Lin. voile
(ml)

30
53
21

115.72

257.05

20.83

104

296

257.05

8.73

48.50

1 817.30
-

180.00
1 637.30

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

ded zone double

exemple mtr gros-oeuvre

Couleur

AFFAIRE :
Repre
Type
d/c/vpm
voile

# #
Ouv.
p/f

Nbre

VOILES EXTERIEURS

Linaire

Ht

Epais.

ha

ts

Surface
(m2)

(kg/m2)

Voiles priphriques sous-sol


ve
1
p
- 1
o
- 1

119.60
0.90
1.70

2.82
2.10
1.00

0.20
0.20
0.20

Aciers complmentaires incorpors


P
2
0.60
P
1
0.35

2.82
2.82

0.20
0.20

100.00
100.00

10.00
-

337.27
1.89
1.70
-

Voiles rampe et escalier ext. sous-sol


ve
1
11.20
ve
1
6.80
c
ve
1
5.00
C
ve
1
13.90

Voiles faade RDC


ve
p

1
5

16.30
1.00

Aciers complmentaires incorpors


P
1
0.40
L
1
6.50

4.10
4.10
4.10
3.20

2.50
2.10

2.50
1.00

0.20
0.20
0.20
0.20

0.20
0.20

0.20
1.00

14.00
14.00
14.00
14.00

PV Cof. Ght
(m2)

PV Cof. Courbe
(m2)

Cof. About V
(ml)

Polystyrne
(m2)

Bton
(m3)

674.54
-

67.45
0.38
0.34
-

ha
(kg)

ts
(kg)

3 373
-

Ngatif
(u)

Pose Huis
(u)

Ragrage
(m2)

337.27
1
1

Emp. v
(m2)

Lin. voile
(ml)

23.92

119.60

23.92

119.60

2.24
1.36
1.00
2.78
7.38

11.20
6.80
5.00
13.90
36.90

3.26

16.30

3.26

16.30

68
20
333.68

Esc
Ramp
Ramp

Coffrage
(m2)

8.00
8.00
8.00
8.00

45.92
27.88
20.50
44.48
138.78

2.30
-

40.75
10.50
-

674.54

91.84
55.76
41.00
88.96

91.84
55.76
41.00

277.56

188.60

66.74

41.00
88.96

129.96

81.50
-

87

3 373

9.18
5.58
4.10
8.90
27.76

643
390
287
623
1 943

367
223
164
356
1 110

8.15
2.10
-

100.00
3.50

45.92
27.88
20.50
44.48

94
5

20
23
30.25

81.50

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

6.05

43

94

exemple mtr gros-oeuvre

Couleur

AFFAIRE :
Repre
Trmies
Emp

Nbre

Long

PLANCHERS

Larg

Epais.

ts
(kg/m2)

Plancher dalle pleine PH SOUS-SOL


1
277.20
1
457.60
asc
1
1.80

1.00
1.00
1.60

0.38
0.23
0.23

pou
1
74.27
1.00
vi
1
10.58
1.00
ve
1
119.60
0.20
mb
1
ma
Aciers complmentaires bandes pleines et chainages
BN35/37
1
1.30
1.00
1.00

Plancher Dalle Porte faux PH SOUS-SOL


1
52.80

1.00

0.23

Plancher Casquette PH SOUS-SOL (au droit rampe accs PK)


1
5.00
0.50
0.23

Plancher dalle pleine PH RDC


1
asc
1
esc
1

ha

709.80
1.80
7.65

1.00
1.60
1.00

pou
1
1.00
vi
1
23.36
1.00
ve
1
16.30
0.20
mb
1
128.30
0.25
ma
Aciers complmentaires bandes pleines et chainages
BN35/22
1
3.50
1.00
BN25/22
1
2.00
1.00
BN55/22
1
3.80
1.00
CH
1
138.50
1.00

0.22
0.22
0.22

0.50
0.50

277.20
457.60
-

Coffrage
(m2)

277.20
457.60
2.88
74.27
10.58
23.92
-

Coffrage rive
(ml)

PV Cof. Dbord
(m2)

Planelles brique
(ml)

Planelle Agglo
(ml)

Bton
(m3)

2.00

2.00

0.50

18.00

18.00

13.00

52.80
52.80

52.80
52.80

54.30

2.50
2.50

2.50
2.50

6.00

709.80
-

709.80
2.88
7.65
23.36
3.26
32.08
-

119.60

54.30

6.00

Ragrage s/face
(m2)

209.92

51
418

14 555

623.16

708.00

12.14
12.14

106
106

950
950

52.80
52.80

52.80
52.80

45

0.58
0.58

2.50
2.50

2.50
2.50

16.30
128.30
-

23.10
16.50
36.30
2.50

128.30
-

156.16
0.63
1.68
-

5
-

45

355
-

9 227
-

81
33
138
346

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

277.20
457.60
2.88
74.27
10.58
23.92
-

Surfaage
(m2)

9 979
4 576
-

119.60
-

623.16

ts
(kg)

139
229
-

734.80

ha
(kg)

105.34
105.25
0.66
-

38.85

1.00
1.00
1.00
1.00

36.00
10.00

Surface SHOT
(m2)

709.80
2.88
7.65
23.36
3.26
32.08
-

277.20
457.60
2.88
-

23.92
-

709.80
2.88
7.65
-

3.26
32.08
-

exemple mtr gros-oeuvre

Couleur

AFFAIRE :
Repre
Trmies
Emp

Nbre

Plancher Dalle Balcons PH RDC


1

Plancher dalle pleine PH R+1


1
asc
1
esc
1

PLANCHERS

Long

Larg

Epais.

ha

ts
(kg/m2)

41.60

709.80
1.80
7.65

1.00

1.00
1.60
1.00

0.18

0.23
0.23
0.23

2.00

0.50

pou
1
1.00
vi
1
23.56
1.00
ve
1
mb
1
144.70
0.25
ma
Aciers complmentaires bandes pleines et chainages
BN35/23
1
10.20
1.00
BN25/23
1
2.00
1.00
BN55/23
1
1.00
CH
1
144.70
1.00

1.00
1.00
1.00
1.00

24.15
17.25
37.95
2.50

Aciers complmentaires dalle en dbord


1
25.10
1.00

1.00

1.50

Plancher Dalle Balcons PH R+1


Compte dans plancher avec P.V. cof. Dbord

14.00

18.00

Surface SHOT
(m2)

Coffrage
(m2)

709.80

640.57

41.60
41.60

41.60
41.60

709.80
-

709.80
2.88
7.65
23.56
36.18
-

Coffrage rive
(ml)

144.60

PV Cof. Dbord
(m2)

Planelles brique
(ml)

128.30

Planelle Agglo
(ml)

Bton
(m3)
153.84

33.70

33.70

7.49
7.49

25.10
-

144.70
-

144.70
-

163.25
0.66
1.76
-

ha
(kg)
953

ts
(kg)

Ragrage s/face
(m2)

Surfaage
(m2)

9 227

640.57

663.94

83

582
582

41.60
41.60

41.60
41.60

355
-

12 776
-

83
-

709.80
2.88
7.65
23.56
36.18
-

709.80
2.88
7.65
-

36.18
-

246
35
362
-

4.00
709.80

639.53

144.70

25.10

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

144.70

160.83

38
1 035

100
12 676

639.53

663.10

1 255.00

Ragrage int

69.20

Ragrage ext

exemple mtr gros-oeuvre

Couleur

AFFAIRE :
Repre
Trmies
Emp

Nbre

Long

PLANCHERS

Larg

Epais.

ha

ts
(kg/m2)

Surface SHOT
(m2)

Coffrage
(m2)

Coffrage rive
(ml)

PV Cof. Dbord
(m2)

Planelles brique
(ml)

Planelle Agglo
(ml)

Bton
(m3)

ha
(kg)

ts
(kg)

Ragrage s/face
(m2)
7.94

Surfaage
(m2)
Rive

77.14

Plancher dalle pleine PH R+2 (solution Plancher Seac Bois)


1
344.70
1.00
asc
1
1.80
1.60
pou
1
5.02
1.00
vi
1
8.73
1.00
ve
mb
1
86.80
0.25
ma
Aciers complmentaires bandes pleines et chainages

344.70
-

344.70

344.70
2.88
5.02
8.73
21.70
-

306.37

86.80
-

86.80

86.80
-

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

86.80

344.70
2.88
5.02
8.73
21.70
-

306.37

344.70
2.88
-

21.70
-

320.12

exemple mtr gros-oeuvre

Couleur

AFFAIRE :
Repre

Ouv.
p/f

Nbre

Linaire

Maonneries faades bloc cellulaire RDC


1
128.30
pf
- 10
1.80
pf
- 1
1.60
pf
- 16
0.90
f
- 1
0.40
f
- 1
0.90

MACONNERIES FACADES

Ht

2.50
2.15
2.15
2.15
0.40
1.15

Surface vnd
(m2)

Surface
(m2)

320.75
320.75

Maonneries faades bloc cellulaire R+1


1
144.70
pf
- 11
1.80
pf
- 1
1.60
pf
- 18
0.90
f
- 1
0.40
f
- 1
0.90

2.52
2.15
2.15
2.15
0.40
1.15

364.64
364.64

Maonneries faades bloc cellulaire R+2


1
86.80
pf
- 5
1.80
pf
- 9
0.90
f
- 1
0.40

2.61
2.15
2.15
0.40

226.55
226.55

Plot BA dans maonnerie R+2


22

320.75
38.70
3.44
30.96
0.16
1.04
246.46

364.64
42.57
3.44
34.83
0.16
1.04
282.61

226.55
19.35
17.42
0.16
189.62

PV S. courbe
(m2)

Appuis
(ml)

Seuils
(ml)

Calfeutr.
(ml)

Linteaux
(ml)

61.00
5.90
83.20
1.20
3.20

22.00
2.00
20.80
0.80
1.30

Tableaux R
(ml)

Emp. m
(m2)

25.66
18.00
1.60
14.40
0.40
0.90

1.30

1.30

154.50

46.90

119.20

19.80
1.60
16.20

67.10
5.90
93.60
1.20
3.20

24.20
2.00
23.40
0.80
1.30

47.30
4.30
77.40
0.80
2.30

37.60

171.00

51.70

132.10

9.00
8.10

30.50
46.80
1.20

11.00
11.70
0.80

21.50
38.70
0.80

0.40

0.40

17.10

3.00

88.70

78.50

23.50

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

Ramp.
(ml)

61.00

Nb ouv
(u)

Cof

128.30

43.00
4.30
68.80
0.80
2.30

34.00

0.40
0.90

Lin. m
(ml)

10.00
1.00
16.00
1.00
1.00
25.66

128.30

28.94

144.70

29.00

1.30

11.00
1.00
18.00
1.00
1.00
28.94

144.70

17.36

86.80

32.00

1.29

5.00
9.00
1.00
17.36

86.80

15.00
76.00

1.19

exemple mtr gros-oeuvre

Couleur

AFFAIRE :
Repre

Ouv.
p/f

Nbre

Linaire

Maonneries locaux techniques RDC


1
19.55
p
- 1
0.90

AUTRES MACONNERIES

Ht

2.50
2.10

Surface vnd
(m2)

Surface
(m2)

48.88
48.88

48.88
1.89
46.99

PV S. courbe
(m2)

Appuis
(ml)

Seuils
(ml)

0.90

0.90

Calfeutr.
(ml)

Linteaux
(ml)

5.10

1.30

5.10

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

1.30

Tableaux R
(ml)

Emp. m
(m2)

Lin. m
(ml)

3.91

19.55

3.91

19.55

Ramp.
(ml)

4.20

4.20

Nb ouv
(u)

Cof

1.00

1.00

1.04

exemple mtr gros-oeuvre

OSSATURES DS MACONNERIES

AFFAIRE :
Repre
Type
Section
Ht/Ml
Nb
Quant. Unitaire
r/c/l
Larg
Long
(u)
(m3/ml)
(m2/ml)
"cr" chainage rive "cp" chainage planelle "cu" chainage bloc U "cc" chainage coffr
"lu" linteau bloc U "lc" linteau coffr
Raidisseurs Chainages Linteaux RDC
R
LC
0.20
0.20
CC
LU
CR
CP

Raidisseurs Chainages Linteaux R+1


R
LC
0.20
0.20
CC
LU
CR
CP

Raidisseurs Chainages Linteaux R+2


R
LC
0.20
0.20
CC
LU
CR
CP

2.50
46.90

2.52
51.70

2.61
23.50

36.00
1.00

36.00
1.00

19.00
1.00

0.040
-

0.040
-

0.040
-

ha
(kg/m3)

Coffrage
(m2)

Planelles
(ml)

Bton
(m3)

ha
(kg)

Raidisseurs
(ml)

Chainages
(ml)

Chainages U
(ml)

Linteaux U
(ml)

Linteaux cof
(ml)

90.00
0.60
-

87.50

28.14
-

46.90

1.88
-

164
-

46.90
-

28.14

46.90

1.88

164

31.02
-

51.70

2.07
-

181
-

90.00

46.90

90.72
0.60
-

87.50

51.70
-

31.02

51.70

2.07

181

14.10
-

23.50

0.94
-

82
-

90.72

51.70

49.59
0.60
-

87.50

23.50
-

14.10

23.50

0.94

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

82

49.59

23.50

exemple mtr gros-oeuvre

Couleur

AFFAIRE :
Repre
Type
d/c

OUVBA

Section

Larg

Ep pl.

Ml

Ht

Relevs BA sous maonnerie RDC


d
0.15
0.17
d

35.40

Relevs BA 16/15 sur dalle en dbord RDC


d
0.16
0.15
d

54.30

Relevs BA 16/12 sur dalle balcons PH RDC


d
0.16
0.15
d

20.10

Releves BA sous maonnerie R+2


d
0.15
d

0.30

86.80

Acrotres Relevs R+2 (Terrasses)


d
0.20
d
0.20
d
0.16
d
0.18
d

0.50
0.45
0.30
0.30

89.90
35.10
7.70
4.80

Nb
(u)

1.00

1.00

1.00

1.00

1.00
1.00
1.00
1.00

Quant. Unitaire
(m3/ml)
(m2/ml)

ha
(kg/m3)

0.026
-

0.34
-

65.00

0.024
-

0.30
-

65.00

0.024
-

0.30
-

65.00

0.045
-

0.60
-

65.00

0.100
0.090
0.048
0.054
-

1.00
0.90
0.60
0.60
-

90.00
90.00
65.00
65.00

ts
(kg/m3)

Cof. droit
(m2)

12.04
12.04

16.29
16.29

6.03
6.03

52.08
52.08

89.90
31.59
4.62
2.88
128.99
60.75

Acrotres R+2 (Tte de mur Toiture)


d
0.16
0.70
d

Gaine VB SOUS-SOL
d
d

Edicule Asc

d
d

0.15

0.20

2.90

1.70

86.80

6.30

7.40

1.00

1.00

1.00

0.112
-

1.40
-

90.00

0.435
-

5.80
-

20.00

0.340
-

3.40
-

20.00

Cof. Courbe
(m2)

25.00

ha
(kg)

ts
(kg)

59

Polystyrne
(m2)

0.90
0.90

1.30
1.30

0.48
0.48

31

3.91
3.91

254
254

8.99
3.16
0.37
0.26
12.78

809
284
24
17
1 134

9.72
9.72

875
875

2.74
2.74

2.52
2.52

59

85
85

31

Ragrage
(m2)

Glacis
(ml)

35.40
35.40

16.29
16.29

54.30
54.30

6.03
6.03

20.10
20.10

86.80
86.80

89.90
31.59
4.62
2.88
128.99

89.90
35.10
7.70
4.80
137.50

86.80
86.80

6.30
6.30

7.40
7.40

Planelle bce

121.52
121.52
25.00

Bton
(m3)

36.54
36.54

25.16
25.16

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

55
55

69
-

50
50

69

63
-

63

exemple mtr gros-oeuvre


AFFAIRE :

ESCALIERS
-

ESCALIERS B.A.
Escalier vole droite
Nbre de marches
Emmarchement
Hauteur marches
Giron
Epais.paillasse
Ferraillage

u
ml
ml
ml
ml
Kg / m3

Rsultat
Coffrage
m2
Bton
m3
Acier
kg
Chape
m2
Ragrage
m2
Linaire marches ml
Coffrage
m2 / ml
Bton
m3 / ml
Acier
kg / m3
Surface paillasse m2

#DIV/0!
#DIV/0!
#DIV/0!
-

u
ml
u
ml
ml
ml
ml
Kg / m3

Rsultat
Coffrage
m2
Bton
m3
Acier
kg
Chape
m2
Ragrage
m2
Linaire marches ml
Coffrage
m2 / ml
Bton
m3 / ml
Acier
kg / m3
Surface paillasse m2

#DIV/0!
#DIV/0!
#DIV/0!
-

Escalier vole balance


Marches droites
Emmarch.droit
Marches balances
Emmarch.balanc
Hauteur marches
Giron
Epais.paillasse
Ferraillage

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

exemple mtr gros-oeuvre


AFFAIRE :
Longueur
1.80

Dimensions intrieures
largeur
hauteur
1.60
1.40

FOSSE ASC

pais.mur
0.20

u
nb
1
m3
m3
m3

23.520
17.360
8.008

14
80

m2
ml
m3
kg
kg

6.24
10.00
1.560
22
125

25
50

m2
m3
kg
kg

21.28
2.128
53
106

- Fouilles
- Remblai extrieur
- Evacuation aux D.P.
- Radier
bton de propret
coffrage
bton
acier ha (kg/m3)
acier ts (kg/m3)
- Parois
coffrage
bton
acier ha (kg/m3)
acier ts (kg/m3)
- Cuvelage
- Contre dalle

Quantits

m2
m2

12.40
2.88

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

exemple mtr gros-oeuvre

AFFAIRE :
Repre

M_EXT

Type mur
(ma mb ba)

Type
pf / f / p

Larg

ht

Nbre

Surface
(m2)

Appuis
(ml)

Seuils
(ml)

Quantits Unitaires
Linteaux
(ml)

Calfeut.
(ml)

T.V.
(ml)

Tab Rectifi
(ml)

Surf. Ds agglo
(m2)

Surf. Ds brique
(m2)

Surf. Ds bton
(m2)

Appuis
(ml)

Quantits Totales
Seuils
Linteaux
(ml)
(ml)

Calfeut.
(ml)

T.V.
(ml)

Tab rectifi
(ml)

Ngatif
(u)

ma = mur agglos ; mb = mur brique ; ba = voile bton


Menuiseries SOUS-SOL
ba

1.00

2.10

1.00

2.10
-

1.00

1.00
Menuiseries RDC
ma
ma
ma
ma
ma
ba

pf
pf
pf
f
f
p

1.80
1.60
0.90
0.40
0.90
1.00

2.15
2.15
2.15
0.40
1.15
2.10

10.00
1.00
16.00
1.00
1.00
5.00

3.87
3.44
1.94
0.16
1.04
2.10
-

1.80
1.60
0.90
0.40
0.90

2.20
2.00
1.30
0.80
1.30

6.10
5.90
5.20
1.20
3.20

1.00

6.10
5.90
5.20
1.20
3.20
5.20
-

34.00
Menuiseries R+1
ma
ma
ma
ma
ma

pf
pf
pf
f
f

1.80
1.60
0.90
0.40
0.90

2.15
2.15
2.15
0.40
1.15

11.00
1.00
18.00
1.00
1.00

3.87
3.44
1.94
0.16
1.04
-

1.80
1.60
0.90
0.40
0.90

2.20
2.00
1.30
0.80
1.30

6.10
5.90
5.20
1.20
3.20

6.10
5.90
5.20
1.20
3.20
-

pf
pf
f

1.80
0.90
0.40

2.15
2.15
0.40

5.00
9.00
1.00

15.00

1.80
0.90
0.40

2.20
1.30
0.80

6.10
5.20
1.20

6.10
5.20
1.20
-

2.10

1.00

10.50

42.57
3.44
34.83
0.16
1.04

Cabinet HL.BTIMTR
Hubert LE BALC'H
Mtreur - conomiste de la construction
Tl : 06 15 67 74 06 - Mail : hl.batimetre@gmail.com

18.00
1.60
14.40

22.00
2.00
20.80
0.80
1.30

61.00
5.90
83.20
1.20
3.20

5.00

1.30

39.00

46.90

154.50

19.80
1.60
16.20

24.20
2.00
23.40
0.80
1.30

67.10
5.90
93.60
1.20
3.20

37.60

51.70

171.00

9.00
8.10

11.00
11.70
0.80

30.50
46.80
1.20

0.40

17.10

23.50

78.50

3.00

94.70

0.40
0.90

19.35
17.42
0.16

36.93

1.00

0.40
0.90
10.50

82.04

3.87
1.94
0.16
-

38.70
3.44
30.96
0.16
1.04

74.30

32.00
Menuiseries R+2
ma
ma
ma

2.10

5.20
-

1.30

0.40

5.20
5.20

61.00
5.90
83.20
1.20
3.20
26.00
180.50

67.10
5.90
93.60
1.20
3.20
171.00

30.50
46.80
1.20
78.50

You might also like