INFRA DESA (JOHOR) SDN BHD

Project Name

PELAKSANAAN PENYELENGGARAAN JALAN-JALAN KAMPUNG DI NEGERI

Scope Of Work

Periodic Maintenance

Contractor

Syarikat Paduan

District

Segamat

Package No.

IDJ/JKJ2/SGT/016/576
0464 Jln. Batu Bakar, Kg. Batu Bakar
-

Periodic Maintenance
Estimate Price

Cumulative Bill Of Quantity


NO

DESCRIPTION

ITEM

UNIT

QUANTITY

RATE (RM)

BQ Sub Con

AMOUNT (RM)

RATE (RM)

AMOUNT (RM)

1.1.1

Site Clearing

m2

2.2.1

Demolish existing culvert

no

2.3.1

450mm Diameter RCP (Single)

2.3.2

600mm Diameter RCP (Single)

2.3.5

1200mm Diameter RCP (Single)

2.5.7

900mm x 450mm box culvert

2.5.10

900mm x 900mm box culvert

2.5.15

1200mm x 1200mm box culvert

2.5.28

1800mm x 1800mm box culvert

2.7.1

HW/WW 450mm Diameter RCP (Single)

no

2.7.2

HW/WW 600mm Diameter RCP (Single)

no

2.7.5

HW/WW 1200mm Diameter RCP (Single)

no

2.9.5

HW/WW 900mm Width of box culvert

no

2.9.11

HW/WW 1800mm Width of box culvert

no

2.9.7

HW/WW 1200mm Width of box culvert

no

3.1.1

Scarify Works

m2

4,650.00

0.50

2,325.00

0.50

2,325.00

3.1.2

Cut, excavate and dispose unsuitable materials

m3

100.00

3.50

350.00

3.50

350.00

3.3.0

Earth Filling

m3

3.5.1

100mm thick Crusher-Run

m2

3.5.2

150mm thick Crusher-Run

m2

3.5.4

250mm thick Crusher-Run

m2

3.5.3

200mm thick Crusher-Run

m2

3.5.7

Crusher-Run

MT

3.6.0

Prime Coat

m2

1,120.00

1.00

1,120.00

1.00

3.7.0

Tack Coat

m2

4,650.00

1.00

4,650.00

1.00

4,650.00

3.8.1

50mm thick (BMW 20)

m2

5,770.00

22.50

129,825.00

22.50

129,825.00

3.8.2

Regulate 50mm thick ( BMW 20 )

MT

4.1.0

Road Shoulder

m3

680.00

19.00

5.5.1

Concrete Grade 25

m3

5.6.3

BRC A10

m2

6.1.5

Grade 15 concrete (1:3:6) as gabion base

m3

1,120.00
-

11.00
-

12,320.00
-

12,920.00

11.00
-

12.00

12,320.00
-

1,120.00

8,160.00

6.1.6

Gabion cage (1.0 m x 1.0 m x 1.0 m)

No

6.1.10

6" x 9" black stone as gabion filling

m3

6.1.16

Supply, handle, pitch 100mm diameter bakau piles

6.1.19

Cut off head ( all size )

No

6.1.18

Drive bakau piles ( all size )

6.2.2

Woven geotextiles or equivalent

m2

12.0.1

Traffic Management

LS

500.00

500.00

13.0.1

Testing

LS

1,500.00

1,500.00

165,510.00

160,750.00

TOTAL

Agreed By :

Checked By :

Verified By :

Verified By :

Contractor

Mashitoh Bte Aziz


Contract Manager
Infra Desa (Johor) Sdn Bhd

.....