You are on page 1of 8

Government of Nepal

Ministry of Physical Planning & Works

Department of Roads
Western Regional Road Directorate

Western Division Road Office No. 5 Shivapur

Annual Road Maintenance Plan


(ARMP)

2012/2013
(2069/2070)

BAANGANGA BRIDGE

Shivapur, March-2012

Annex XVIII

Land Slide (13+200) along GorusingeSandhikharka Road Section

Bank Erosion due to Flood(near kondre Khola Bridge- 15+500) along Gorusinge-Sandhikharka Road Section

Bed Scour along Gorusinge-Sandhikharka Road Section

Cracked Causeway along Gorusinge Sandhikharka Road

Gabion Dispacement due to Hill Side Mass Movement (22+960) at Baseri along Gorusinge Sandhikharka Road

Drain Clearance along Gorusinge - Sandhikharka Section

Rock/Boulder slides (47+900 48+100) and Hard Rough Road Surface along Gorusinge -

Traffic control work on surface dressing

Rolling on surface dressing

Heavy Loaded Trucks along Chanauta-Krishnanagar Section

Active Slide section along Chanauta- Dhankhola Section

Damage Gabion Check Walls Due to Boulder Movement along Chanauta-Dhankhola Section

Gorusinghe- Sandhikharka Road, ROW Encroachment

Orientation Programme for LengthWorkes

You might also like