KINONDONI MUNICIPAL COUNCIL

The Local Government (Urban Authorities) (Development Control) Regulations 2008 CERTIFICATE SUBMITTED IN ACCORSANCE WITH REGULATIONS 143

This Certificate is submitted in respect of Reinforced Concrete to be used in the construction of the Proposed building for P.O. BOX Dar es Salaam On plot No .block NoAreato be used as.. I hereby Certify that the plans, Sections, Calculations and particulars submitted by me in respect of the Building specify above are in conformity with the British Standard Codes of Practice of reinforced Concrete Structures for the time being in force or with such modifications of the said regulations as are permitted by the Authority and further that the details submitted are adequate for the proper Construction of the Structure. Signed.. Qualification Date. **SCHEDULE OF CALCULATIONS AND DRAWINGS ACCOPANYING THE CERTIFICATE Description of Details Drawings/page Numbers

Delete whichever is not applicable ** All drawings and all pages of calculations are to be signed by architect or structural Engineer authorized under Regulation 143 making the submission Regulations 142 and 143 of The Local Government (Urban Authorities) (Development Control) Regulations are appointed in the reverse side.

You might also like