BY SUNIL KUMAR S IV MMT

This project is to analyze and to purpose the solution to the problem arising in the existing setup of the internal thread grinding machine unit . It aims at reducing or eliminating entirely the need for maintenance. It deals with the effective utilization of the internal thread grinding machine i.e. Re-designing of dressing unit which plays a very vital role in machine. The outcome of the project is based on the designed components of dressing unit.

` ` `

Maximising production or increasing facilities availability at the lowest cost and at the highest quality and safety standards. Reducing breakdowns and emergency shutdowns. Optimising resources utilisation. Reducing downtime.

6000 5000 4000 Numbers 3000 2000 1019 1000 0 Nov11 Dec-11 Jan-12 1025 1023 Capacity Actual production 4900 4900 4900

breakdown
180 160 140 120 Hours 100 80 60 40 20 0 Nov/11 Dec/11 Jan/12 breakdown 123 125 170

 Collection

of data  Failure data analysis  Concept and design finalization  Vendor identification  Dressing unit manufacturing  Interfacing of dressing unit  Job trails Software using for this project  Autocad

SL NO 1

Action Plan

March 12

April 12

May 12

Target

WWWWWWWWWWWW 1 2 3 4 1 2 3 4 1 2 3 4 Concept and design Vendor identification Dressing unit manufacturing Interfacing of dressing unit Job trails 15-03-2012

31-03-2012

30-04-2012

15-05-2012

31-05-2012

` `

Expected rejection rate 200 PPM Machine down time due to form error bringing down to ZERO Expecting that 25 moving parts eliminated with two moving parts